Ready-mix concrete manufacturing and distributing · Kentucky

Advance Ready Mix Concrete, Inc Plant 3

Louisville, KY · ~15 workers · 7 years of OSHA Injury Tracking Application data.

F
Failing Safety Record
10.4
Avg TCR
3.3
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Advance Ready Mix Concrete, Inc Plant 3 runs at 315% of its industry's injury rate - far more dangerous than the typical Ready-mix concrete manufacturing and distributing workplace, earning a grade F.

Advance Ready Mix Concrete, Inc Plant 3: 10.4 TCR = 315% of Ready-mix concrete manufacturing and distributing BLS 3.3 · 7y Form 300A (see methodology below)

Advance Ready Mix Concrete, Inc Plant 3 safety composite

Advance Ready Mix Concrete, Inc Plant 3 scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 4%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

F

18/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
F 10.38 per 100 workers

Safer than 9% of industry peers

DART rate
F 13.5 per 100 workers

Safer than 4% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Rising injury rate

Advance Ready Mix Concrete, Inc Plant 3: 0.0 → 20.2 TCR

Peak year 2024 @ 20.2 TCR · DART/TCR 1.3× in 2024

Advance Ready Mix Concrete, Inc Plant 3's TCR rose 20.2 from 0.0 in 2017 to 20.2 in 2024. In 2024, DART was 1.3× this establishment's average TCR (severity share of cases).

OSHA ITA Form 300A scorecard

Establishment book 327320 · Louisville, KY ABOVE-IND · SMALL

Grade F · TCR 10.4 · 315% of ind

  • DART 13.5 DART
  • RANK #12/13
  • PHOTO TRAC Materials, Inc
  • BOOK 7y book
  • INJ 10 inj
  • SIZE ~15 FTE

Nearest TCR peer: TRAC Materials, Inc (0.0 TCR gap)

Read with this employer → · Industry book → · Kentucky employers → · Look up another →

Advance Ready Mix Concrete, Inc Plant 3 in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Advance Ready Mix Concrete, Inc Plant 3 averages 10.4 TCR (315% of the Ready-mix concrete manufacturing and distributing BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Advance Ready Mix Concrete, Inc Plant 3 TCR series: 2017=0 · 2018=13.7 · 2019=15.3 · 2021=0 · 2022=15.3 · 2023=8.1 · 2024=20.2 · BLS 3.3

Where Advance Ready Mix Concrete, Inc Plant 3 falls in its industry

1,316 Ready-mix concrete manufacturi establishments

Safer than 9% of graded establishments in this industry, whose median TCR is 4.5.

More dangerous than peersSafer than peers

Narrower to Kentucky alone (the establishments it most directly competes with for workers and contracts): ranked #12 safest of 13 Ready-mix concrete manufacturi employers in Kentucky.

Advance Ready Mix Concrete, Inc Plant 3 (15 employees, TCR 10.4) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 051015 Average employees Total Case Rate Advance Ready Mix Concrete, Inc Plant 3
Advance Ready Mix Concrete, Inc Plant 3 (15 employees, TCR 10.4) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5

Advance Ready Mix Concrete, Inc Plant 3 has fewer employees than the Ready-mix concrete manufacturing and dis median and a higher injury rate than the industry's median TCR of 4.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 20.2 13.5 3 0 0
2023 8.1 8.1 1 0 0
2022 15.3 7.7 1 1 0
2021 0.0 0.0 0 0 0
2019 15.3 15.3 2 0 0
2018 13.7 13.7 3 0 0
2017 0.0 0.0 0 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

327320 · KY · Louisville

1,316 Ready-mix concrete manufacturing and distributing employers nationwide with a credible TCR · 7,805 rated employers in Kentucky with headcount on file · 1,638 employers in Louisville, KY · 4 cross-state NAT-TCR peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR TRAC Materials, Inc 10.4 TCR
NAICS-TCR South Orange Ready Mix 10.4 TCR
NAICS-TCR Concrete Materials Incorporated 10.4 TCR
NAICS-TCR Century Ready Mix-Monroe 10.4 TCR
STATE-SIZE D.R. Horton, Inc. - Louisville 15 FTE
STATE-SIZE East Bernstadt,KY - 903 15 FTE
STATE-SIZE Cabot Corporation Carrollton 15 FTE
STATE-SIZE Falls City Machine Technology 15 FTE
CITY-NEAR Jefferson County Public Schools 18,524 FTE
CITY-NEAR KYGRA - WORLDPORT 11,933 FTE
CITY-NEAR WORLDPORT (KYGRA) 9,667 FTE
CITY-NEAR KTKY TRUCK 8,757 FTE
NAT-TCR Police Department 10.4 TCR
NAT-TCR Macungie Ambulance Corps 10.4 TCR
NAT-TCR West Chester Insulation, Inc. 10.4 TCR
NAT-TCR Ridgeview Glass Inc 10.4 TCR

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2023, 2022, 2021, 2019, 2018, 2017. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.