Nuclear Electric Power Generation · Missouri
AMEREN MISSOURI - Callaway Plant
Fulton, MO · ~744 workers · 4 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.2
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
AMEREN MISSOURI - Callaway Plant runs at 20% of its industry's injury rate - far safer than the typical Nuclear Electric Power Generation workplace, earning a grade A.
AMEREN MISSOURI - Callaway Plant: 0.2 TCR = 20% of Nuclear Electric Power Generation BLS 1.2 · 4y Form 300A (see methodology below)
AMEREN MISSOURI - Callaway Plant safety composite
AMEREN MISSOURI - Callaway Plant scores strongest on fatalities (safer than 50% of same-industry peers) and weakest on dart rate (safer than 20%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
37/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 0.24 per 100 workers
Safer than 43% of industry peers
- DART rate
- F 0.14 per 100 workers
Safer than 20% of industry peers
- Fatalities
- D 0
Safer than 50% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
AMEREN MISSOURI - Callaway Plant held a steady TCR band
AMEREN MISSOURI - Callaway Plant's TCR held near 0.1 from 0.4 in 2016 to 0.3 in 2019. Peak filing year was 2016 at 0.4 TCR. In 2019, DART was 0.58× this establishment's average TCR (severity share of cases).
2016=0.4 · 2017=0.0 · 2018=0.3 · 2019=0.3
OSHA ITA Form 300A scorecard
Establishment book 221113 · Fulton, MO AT/BELOW-IND · MID
Grade A · TCR 0.2 · 20% of ind
- DART 0.1 DART
- RANK #1/4
- PHOTO Quad Cities Nuclear …
- BOOK 4y book
- INJ 7 inj
- SIZE ~744 FTE
Nearest TCR peer: Quad Cities Nuclear Power Station (0.0 TCR gap)
Read with this employer → · Industry book → · Missouri employers → · Look up another →
AMEREN MISSOURI - Callaway Plant in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Braidwood Nucl 0.3
Braidwood Nuclear Power Station
0.3 TCR
- This site 0.2
AMEREN MISSOURI - Callaway Plant
0.2 TCR
- Quad Cities Nu 0.2
Quad Cities Nuclear Power Station
0.2 TCR
- Kairos Power-A 0.2
Kairos Power-Alameda
0.2 TCR
- St. Lucie Nucl 0.2
St. Lucie Nuclear Plant
0.2 TCR
What this shows AMEREN MISSOURI - Callaway Plant averages 0.2 TCR (20% of the Nuclear Electric Power Generation BLS benchmark).
AMEREN MISSOURI - Callaway Plant TCR series: 2016=0.4 · 2017=0 · 2018=0.3 · 2019=0.3 · BLS 1.2
Where AMEREN MISSOURI - Callaway Plant falls in its industry
80 Nuclear Electric Power Generat establishmentsSafer than 43% of graded establishments in this industry, whose median TCR is 0.2.
Narrower to Missouri alone (the establishments it most directly competes with for workers and contracts): ranked #1 safest of 4 Nuclear Electric Power Generat employers in Missouri.
AMEREN MISSOURI - Callaway Plant has more employees than the Nuclear Electric Power Generation median and a higher injury rate than the industry's median TCR of 0.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2019 | 0.3 | 0.1 | 2 | 0 | 0 |
| 2018 | 0.3 | 0.1 | 2 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 0.4 | 0.1 | 3 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221113 · MO · Fulton
80 Nuclear Electric Power Generation employers nationwide with a credible TCR · 10,075 rated employers in Missouri with headcount on file · 33 employers in Fulton, MO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Quad Cities Nuclear Power Station | 0.2 TCR |
| NAICS-TCR | Kairos Power-Alameda | 0.2 TCR |
| NAICS-TCR | St. Lucie Nuclear Plant | 0.2 TCR |
| NAICS-TCR | Braidwood Nuclear Power Station | 0.3 TCR |
| STATE-SIZE | Saint Luke's North Hospital | 744 FTE |
| STATE-SIZE | STL-ST. LOUIS | 743 FTE |
| STATE-SIZE | 326 KANSAS CITY | 745 FTE |
| STATE-SIZE | 2272-22720303 | 741 FTE |
| CITY-NEAR | Fulton DC | 664 FTE |
| CITY-NEAR | Westminster College | 355 FTE |
| CITY-NEAR | William Woods University | 251 FTE |
| CITY-NEAR | WM 51 | 245 FTE |
| NAT-TCR | CITGO OKC Lube Plant | 0.2 TCR |
| NAT-TCR | Cable Networks : Denver Broadcast Operations | 0.2 TCR |
| NAT-TCR | Victory Packaging Corporate | 0.2 TCR |
| NAT-TCR | Pseg Nj - Services Corporation - Newark Go | 0.2 TCR |
| NAT-SIZE | HelloFresh NJ (Distribution Center) | 744 FTE |
| NAT-SIZE | J. R. Simplot Headquarters | 744 FTE |
| NAT-SIZE | Obetz (Ohcol) | 744 FTE |
| NAT-SIZE | Deere-Hitachi Construction Machinery Corp | 744 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.