Ready-mix concrete manufacturing and distributing · Arkansas

APAC Central Inc. -Arkhola Springdale

Bethel Heights, AR · ~20 workers · 2 years of OSHA Injury Tracking Application data.

D
Poor Safety Record
5.5
Avg TCR
3.3
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

APAC Central Inc. -Arkhola Springdale runs at 168% of its industry's injury rate - more dangerous than the typical Ready-mix concrete manufacturing and distributing workplace, earning a grade D.

APAC Central Inc. -Arkhola Springdale: 5.5 TCR = 168% of Ready-mix concrete manufacturing and distributing BLS 3.3 · 2y Form 300A (see methodology below)

APAC Central Inc. -Arkhola Springdale safety composite

APAC Central Inc. -Arkhola Springdale scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 6%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

F

30/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
D 5.55 per 100 workers

Safer than 38% of industry peers

DART rate
F 11.1 per 100 workers

Safer than 6% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Rising injury rate

APAC Central Inc. -Arkhola Springdale: 0.0 → 11.1 TCR

Peak year 2024 @ 11.1 TCR · DART/TCR 2× in 2024

APAC Central Inc. -Arkhola Springdale's TCR rose 11.1 from 0.0 in 2022 to 11.1 in 2024. In 2024, DART was 2× this establishment's average TCR (severity share of cases).

OSHA ITA Form 300A scorecard

Establishment book 327320 · Bethel Heights, AR ABOVE-IND · SMALL

Grade D · TCR 5.5 · 168% of ind

  • DART 11.1 DART
  • RANK #6/10
  • PHOTO INGRAM READYMIX, INC…
  • BOOK 2y book
  • INJ 2 inj
  • SIZE ~20 FTE

Nearest TCR peer: INGRAM READYMIX, INC.-LAREDO #11 (0.0 TCR gap)

Read with this employer → · Industry book → · Arkansas employers → · Look up another →

APAC Central Inc. -Arkhola Springdale in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows APAC Central Inc. -Arkhola Springdale averages 5.5 TCR (168% of the Ready-mix concrete manufacturing and distributing BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

APAC Central Inc. -Arkhola Springdale TCR series: 2022=0 · 2024=11.1 · BLS 3.3

Where APAC Central Inc. -Arkhola Springdale falls in its industry

1,316 Ready-mix concrete manufacturi establishments

Safer than 38% of graded establishments in this industry, whose median TCR is 4.5.

More dangerous than peersSafer than peers

Narrower to Arkansas alone (the establishments it most directly competes with for workers and contracts): ranked #6 safest of 10 Ready-mix concrete manufacturi employers in Arkansas.

APAC Central Inc. -Arkhola Springdale (20 employees, TCR 5.5) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 051015 Average employees Total Case Rate APAC Central Inc. -Arkhola Springdale
APAC Central Inc. -Arkhola Springdale (20 employees, TCR 5.5) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5

APAC Central Inc. -Arkhola Springdale has fewer employees than the Ready-mix concrete manufacturing and dis median and a higher injury rate than the industry's median TCR of 4.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 11.1 11.1 2 0 0
2022 0.0 0.0 0 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

327320 · AR · Bethel Heights

1,316 Ready-mix concrete manufacturing and distributing employers nationwide with a credible TCR · 4,393 rated employers in Arkansas with headcount on file · 7 employers in Bethel Heights, AR · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR INGRAM READYMIX, INC.-LAREDO #11 5.5 TCR
NAICS-TCR Live Oak Ready Mix, LLC 5.5 TCR
NAICS-TCR Calportland - Thousand Palms 5.5 TCR
NAICS-TCR INGRAM READYMIX, INC.-CONVERSE #12 5.6 TCR
STATE-SIZE JBS LIVE PORK SANDY RIVER FARM 20 FTE
STATE-SIZE Waldron Growout 20 FTE
STATE-SIZE Nashville Growout 20 FTE
STATE-SIZE Entergy Batesville 20 FTE
CITY-NEAR LRS - Bethel Heights AR 73 FTE
CITY-NEAR ABC Supply 476 55 FTE
CITY-NEAR ABC Supply Co Inc, 476 Bethel Heights 50 FTE
CITY-NEAR Inland Waste Solutions Bethel Heights 42 FTE
NAT-TCR SSM Therapy Services (Home Health) 5.5 TCR
NAT-TCR East Windsor Police Department 5.5 TCR
NAT-TCR 3415 - Ann Arbor State Street 5.5 TCR
NAT-TCR Vendura Industries, LLC 5.5 TCR
NAT-SIZE Valencia 20 FTE
NAT-SIZE Willow-B5510-Afh- Willowbrook Store 20 FTE
NAT-SIZE Westco-B5510-Afh- West County Store 20 FTE
NAT-SIZE Lexing-B5510-Afh- Lexington Store 20 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2022. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.