Ready-mix concrete manufacturing and distributing · Alabama

Birmingham City Plant RMC

Birmingham, AL · ~29 workers · 2 years of OSHA Injury Tracking Application data.

D
Poor Safety Record
4.6
Avg TCR
3.3
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Birmingham City Plant RMC runs at 140% of its industry's injury rate - more dangerous than the typical Ready-mix concrete manufacturing and distributing workplace, earning a grade D.

Birmingham City Plant RMC: 4.6 TCR = 140% of Ready-mix concrete manufacturing and distributing BLS 3.3 · 2y Form 300A (see methodology below)

Birmingham City Plant RMC safety composite

Birmingham City Plant RMC scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 39%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

D

46/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
D 4.63 per 100 workers

Safer than 48% of industry peers

DART rate
D 3.86 per 100 workers

Safer than 39% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

TCR Δ

−1.5

2016→2017

Birmingham City Plant RMC injury rate improved

Birmingham City Plant RMC's TCR fell 1.5 from 5.4 in 2016 to 3.9 in 2017. Peak filing year was 2016 at 5.4 TCR. In 2017, DART was 0.83× this establishment's average TCR (severity share of cases).

2016=5.4 · 2017=3.9

OSHA ITA Form 300A scorecard

Establishment book 327320 · Birmingham, AL ABOVE-IND · SMALL

Grade D · TCR 4.6 · 140% of ind

  • DART 3.9 DART
  • RANK #8/12
  • PHOTO HM PNW- Seattle RMC
  • BOOK 2y book
  • INJ 2 inj
  • SIZE ~29 FTE

Nearest TCR peer: HM PNW- Seattle RMC (0.0 TCR gap)

Read with this employer → · Industry book → · Alabama employers → · Look up another →

Birmingham City Plant RMC in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Birmingham City Plant RMC averages 4.6 TCR (140% of the Ready-mix concrete manufacturing and distributing BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Birmingham City Plant RMC TCR series: 2016=5.4 · 2017=3.9 · BLS 3.3

Where Birmingham City Plant RMC falls in its industry

1,316 Ready-mix concrete manufacturi establishments

Safer than 48% of graded establishments in this industry, whose median TCR is 4.5.

More dangerous than peersSafer than peers

Narrower to Alabama alone (the establishments it most directly competes with for workers and contracts): ranked #8 safest of 12 Ready-mix concrete manufacturi employers in Alabama.

Birmingham City Plant RMC (29 employees, TCR 4.6) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 051015 Average employees Total Case Rate Birmingham City Plant RMC
Birmingham City Plant RMC (29 employees, TCR 4.6) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5

Birmingham City Plant RMC has fewer employees than the Ready-mix concrete manufacturing and dis median and a higher injury rate than the industry's median TCR of 4.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2017 3.9 3.9 1 0 0
2016 5.4 0.0 1 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

327320 · AL · Birmingham

1,316 Ready-mix concrete manufacturing and distributing employers nationwide with a credible TCR · 7,418 rated employers in Alabama with headcount on file · 840 employers in Birmingham, AL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR HM PNW- Seattle RMC 4.6 TCR
NAICS-TCR Kienstra Ready Mix of O'Fallon Inc. 4.6 TCR
NAICS-TCR Master Made Tanks, Inc. 4.6 TCR
NAICS-TCR Sparks Readymix 4.6 TCR
STATE-SIZE Grand Bay 29 FTE
STATE-SIZE Mid Star Wood Haulers 29 FTE
STATE-SIZE Oak Grove - APC 29 FTE
STATE-SIZE Gardendale Crew Headquarters - APC 29 FTE
CITY-NEAR USD 9,165 FTE
CITY-NEAR CLASSIC FOODS 9,165 FTE
CITY-NEAR Corporate 8,650 FTE
CITY-NEAR BIRMINGHAM PACKERS 8,650 FTE
NAT-TCR Giant Eagle #3154 4.6 TCR
NAT-TCR Unadilla (Gauna) 4.6 TCR
NAT-TCR The Pines 4.6 TCR
NAT-TCR COMPOSITES_CLEARWATER_FL 4.6 TCR
NAT-SIZE 0109 - Norfolk, Va 29 FTE
NAT-SIZE 0097 - Raleigh, Nc 29 FTE
NAT-SIZE 0016 - Modesto, Ca 29 FTE
NAT-SIZE Mid-West Roofing Company 29 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2017, 2016. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.