Fossil Fuel Electric Power Generation · North Carolina
Buck CT/CC
Salisbury, NC · ~35 workers · 6 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 2.1
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Buck CT/CC runs at 179% of its industry's injury rate - more dangerous than the typical Fossil Fuel Electric Power Generation workplace, earning a grade D.
Buck CT/CC: 2.1 TCR = 179% of Fossil Fuel Electric Power Generation BLS 1.2 · 6y Form 300A (see methodology below)
Buck CT/CC safety composite
Buck CT/CC scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 10%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
29/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 2.15 per 100 workers
Safer than 33% of industry peers
- DART rate
- F 2.93 per 100 workers
Safer than 10% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Buck CT/CC: 0.0 → 2.9 TCR
Peak year 2020 @ 3.5 TCR · DART/TCR 1.36× in 2023
Buck CT/CC's TCR rose 2.9 from 0.0 in 2018 to 2.9 in 2023. Peak filing year was 2020 at 3.5 TCR. In 2023, DART was 1.36× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221112 · Salisbury, NC ABOVE-IND · SMALL
Grade D · TCR 2.1 · 179% of ind
- DART 2.9 DART
- RANK #14/20
- PHOTO St. Francis Power Pl…
- BOOK 6y book
- INJ 4 inj
- SIZE ~35 FTE
Nearest TCR peer: St. Francis Power Plant / Siemens Energy (0.0 TCR gap)
Read with this employer → · Industry book → · North Carolina employers → · Look up another →
Buck CT/CC in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- OG&E-McClain P
OG&E-McClain Power Plant
2.2 TCR
- AMEREN MISSOUR
AMEREN MISSOURI - Labadie Energy Ctr Gen and Bud
2.2 TCR
- This site
Buck CT/CC
2.1 TCR
- St. Francis Po
St. Francis Power Plant / Siemens Energy
2.1 TCR
- Theodore Cogen
Theodore Cogeneration Facility - APC
2.1 TCR
What this shows Buck CT/CC averages 2.1 TCR (179% of the Fossil Fuel Electric Power Generation BLS benchmark).
Buck CT/CC TCR series: 2018=0 · 2019=3.1 · 2020=3.5 · 2021=3.4 · 2022=0 · 2023=2.9 · BLS 1.2
Where Buck CT/CC falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 33% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #14 safest of 20 Fossil Fuel Electric Power Gen employers in North Carolina.
Buck CT/CC has fewer employees than the Fossil Fuel Electric Power Generation median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 2.9 | 2.9 | 1 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 3.4 | 3.4 | 1 | 0 | 0 |
| 2020 | 3.5 | 0.0 | 1 | 0 | 0 |
| 2019 | 3.1 | 3.1 | 1 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · NC · Salisbury
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 180 employers in Salisbury, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | St. Francis Power Plant / Siemens Energy | 2.1 TCR |
| NAICS-TCR | Theodore Cogeneration Facility - APC | 2.1 TCR |
| NAICS-TCR | OG&E-McClain Power Plant | 2.2 TCR |
| NAICS-TCR | AMEREN MISSOURI - Labadie Energy Ctr Gen and Bud | 2.2 TCR |
| STATE-SIZE | Boykin Farms, Inc. | 35 FTE |
| STATE-SIZE | NEW COLONY SOW FARM 6276 -EST | 35 FTE |
| STATE-SIZE | Goldsboro Field Services | 35 FTE |
| STATE-SIZE | Butterball LLC Hatchery # 2 | 35 FTE |
| CITY-NEAR | CSCEXC | 1,314 FTE |
| CITY-NEAR | Novant Health Rowan Medical Center | 1,176 FTE |
| CITY-NEAR | Rowan County Government | 1,151 FTE |
| CITY-NEAR | CLT1 | 973 FTE |
| NAT-TCR | Kyocera International Inc. FC Vancouver, WA. | 2.1 TCR |
| NAT-TCR | Massman Automation Design | 2.1 TCR |
| NAT-TCR | EDL Massman LLC | 2.1 TCR |
| NAT-TCR | Price Rite Store 569 Rosedale | 2.1 TCR |
| NAT-SIZE | Copylite Products Corporation | 35 FTE |
| NAT-SIZE | Williams-White | 35 FTE |
| NAT-SIZE | CR_Potelco | 35 FTE |
| NAT-SIZE | Terhorst Manufacturing | 35 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.