Transmission of electric power · Wyoming
Cheyenne Field Facility
Cheyenne, WY · ~29 workers · 8 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 2.4
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Cheyenne Field Facility runs at 199% of its industry's injury rate - more dangerous than the typical Transmission of electric power workplace, earning a grade D.
Cheyenne Field Facility: 2.4 TCR = 199% of Transmission of electric power BLS 1.2 · 8y Form 300A (see methodology below)
Cheyenne Field Facility safety composite
Cheyenne Field Facility scores strongest on dart rate (safer than 77% of same-industry peers) and weakest on total case rate (tcr) (safer than 45%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
58/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 2.39 per 100 workers
Safer than 45% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 77% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−4.1
2016→2024
Cheyenne Field Facility injury rate improved
Cheyenne Field Facility's TCR fell 4.1 from 4.1 in 2016 to 0.0 in 2024. Peak filing year was 2016 at 4.1 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=4.1 · 2017=0.0 · 2018=3.7 · 2019=3.8 · 2020=3.8 · 2021=3.7 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221121 · Cheyenne, WY ABOVE-IND · SMALL
Grade D · TCR 2.4 · 199% of ind
- DART 0.0 DART
- RANK P45
- PHOTO N Charleston Transmi…
- BOOK 8y book
- INJ 5 inj
- SIZE ~29 FTE
Nearest TCR peer: N Charleston Transmission Svc Bldg (0.0 TCR gap)
Read with this employer → · Industry book → · Wyoming employers → · Look up another →
Cheyenne Field Facility in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Cheyenne Field Facility
2.4 TCR
- N Charleston T
N Charleston Transmission Svc Bldg
2.4 TCR
- Columbia Ctr T
Columbia Ctr Trans Svc Ctr
2.4 TCR
- CA-Corp Whse W
CA-Corp Whse Westminster
2.4 TCR
- Central Electr
Central Electric Power Cooperative
2.4 TCR
What this shows Cheyenne Field Facility averages 2.4 TCR (199% of the Transmission of electric power BLS benchmark).
Cheyenne Field Facility TCR series: 2016=4.1 · 2017=0 · 2018=3.7 · 2019=3.8 · 2020=3.8 · 2021=3.7 · 2023=0 · 2024=0 · BLS 1.2
Where Cheyenne Field Facility falls in its industry
263 Transmission of electric power establishmentsSafer than 45% of graded establishments in this industry, whose median TCR is 2.2.
Cheyenne Field Facility has fewer employees than the Transmission of electric power median and a higher injury rate than the industry's median TCR of 2.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 3.7 | 3.7 | 1 | 0 | 0 |
| 2020 | 3.8 | 0.0 | 1 | 0 | 0 |
| 2019 | 3.8 | 0.0 | 1 | 0 | 0 |
| 2018 | 3.7 | 0.0 | 1 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 4.1 | 0.0 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221121 · WY · Cheyenne
263 Transmission of electric power employers nationwide with a credible TCR · 783 rated employers in Wyoming with headcount on file · 148 employers in Cheyenne, WY · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | N Charleston Transmission Svc Bldg | 2.4 TCR |
| NAICS-TCR | Columbia Ctr Trans Svc Ctr | 2.4 TCR |
| NAICS-TCR | CA-Corp Whse Westminster | 2.4 TCR |
| NAICS-TCR | Central Electric Power Cooperative | 2.4 TCR |
| STATE-SIZE | Rock Hard Cementing LLC | 29 FTE |
| STATE-SIZE | BVEA Headquarters | 29 FTE |
| STATE-SIZE | Taylor Construction- Boulder WY | 29 FTE |
| STATE-SIZE | Cheyenne Office | 29 FTE |
| CITY-NEAR | Wyoming Department of Transportation | 1,861 FTE |
| CITY-NEAR | WM 7077 | 739 FTE |
| CITY-NEAR | 7077 | 679 FTE |
| CITY-NEAR | STP Retail, LLC | 587 FTE |
| NAT-TCR | The Klark Organization I, LLC | 2.4 TCR |
| NAT-TCR | Columbia River Electric Maintenance | 2.4 TCR |
| NAT-TCR | Future Foam Inc. | 2.4 TCR |
| NAT-TCR | AMEREN ILLINOIS - Northern S - IL Gas Ops | 2.4 TCR |
| NAT-SIZE | Roberts Electric Co Inc | 29 FTE |
| NAT-SIZE | Liberty Marking Systems, Inc. | 29 FTE |
| NAT-SIZE | Sun Builders Co. | 29 FTE |
| NAT-SIZE | Sioux City Purina Feed Mill | 29 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.