Addition, alteration and renovation general contractors, commercial and institutional building · Pennsylvania
Children's Hospital of Philadelphia
Philadelphia, PA · ~40 workers · 8 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 1.1
- Avg TCR
- 2.9
- Industry avg
- 0
- Fatalities
The verdict
Children's Hospital of Philadelphia runs at 39% of its industry's injury rate - far safer than the typical Addition, alteration and renovation general contractors, commercial and institutional building workplace, earning a grade A.
Children's Hospital of Philadelphia: 1.1 TCR = 39% of Addition, alteration and renovation general contractors, commercial and institutional building BLS 2.9 · 8y Form 300A (see methodology below)
Children's Hospital of Philadelphia safety composite
Children's Hospital of Philadelphia scores strongest on total case rate (tcr) (safer than 74% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
68/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 1.14 per 100 workers
Safer than 74% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 73% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Children's Hospital of Philadelphia held a steady TCR band
Children's Hospital of Philadelphia's TCR held near 0.0 from 0.0 in 2017 to 0.0 in 2024. Peak filing year was 2021 at 4.0 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2017=0.0 · 2018=0.0 · 2019=0.0 · 2020=0.0 · 2021=4.0 · 2022=3.1 · 2023=2.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 236220 · Philadelphia, PA AT/BELOW-IND · SMALL
Grade A · TCR 1.1 · 39% of ind
- DART 0.0 DART
- RANK #41/251
- PHOTO The Robins & Morton …
- BOOK 8y book
- INJ 3 inj
- SIZE ~40 FTE
Nearest TCR peer: The Robins & Morton Group (0.0 TCR gap)
Read with this employer → · Industry book → · Pennsylvania employers → · Look up another →
Children's Hospital of Philadelphia in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Children's Hospital of Philadelphia
1.1 TCR
- The Robins & M
The Robins & Morton Group
1.1 TCR
- Manhattan Cons
Manhattan Construction Company
1.1 TCR
- TMG Leesburg S
TMG Leesburg Secure Office
1.1 TCR
- Elevator Works
Elevator Works Inc
1.1 TCR
What this shows Children's Hospital of Philadelphia averages 1.1 TCR (39% of the Addition, alteration and renovation general contractors, commercial and institutional building BLS benchmark).
Children's Hospital of Philadelphia TCR series: 2017=0 · 2018=0 · 2019=0 · 2020=0 · 2021=4 · 2022=3.1 · 2023=2 · 2024=0 · BLS 2.9
Where Children's Hospital of Philadelphia falls in its industry
4,692 Addition, alteration and renov establishmentsSafer than 74% of graded establishments in this industry, whose median TCR is 2.3.
Narrower to Pennsylvania alone (the establishments it most directly competes with for workers and contracts): ranked #41 safest of 251 Addition, alteration and renov employers in Pennsylvania.
Children's Hospital of Philadelphia has fewer employees than the Addition, alteration and renovation gene median and a lower injury rate than the industry's median TCR of 2.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 2.0 | 0.0 | 1 | 0 | 0 |
| 2022 | 3.1 | 3.1 | 1 | 0 | 0 |
| 2021 | 4.0 | 0.0 | 1 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
236220 · PA · Philadelphia
4,692 Addition, alteration and renovation general contractors, commercial and institutional building employers nationwide with a credible TCR · 22,692 rated employers in Pennsylvania with headcount on file · 1,431 employers in Philadelphia, PA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | The Robins & Morton Group | 1.1 TCR |
| NAICS-TCR | Manhattan Construction Company | 1.1 TCR |
| NAICS-TCR | TMG Leesburg Secure Office | 1.1 TCR |
| NAICS-TCR | Elevator Works Inc | 1.1 TCR |
| STATE-SIZE | CNB Mushroom, LLC | 40 FTE |
| STATE-SIZE | ASA Mushroom LLC | 40 FTE |
| STATE-SIZE | The Conard-Pyle Co. | 40 FTE |
| STATE-SIZE | Coastal Greenhouses, LLC -PA | 40 FTE |
| CITY-NEAR | FIVE BELOW INC | 19,600 FTE |
| CITY-NEAR | Hospital of University of Pennsylvania | 13,423 FTE |
| CITY-NEAR | Children's Hospital of Philadelphia - Main Hospital | 9,638 FTE |
| CITY-NEAR | The Children's Hospital of Philadelphia - Main Campus | 9,129 FTE |
| NAT-TCR | RAM Construction General Contractors LLC | 1.1 TCR |
| NAT-TCR | RLCC Elementary | 1.1 TCR |
| NAT-TCR | John Deere Kernersville | 1.1 TCR |
| NAT-TCR | Concord MOC III | 1.1 TCR |
| NAT-SIZE | Brookdale Rome | 40 FTE |
| NAT-SIZE | North Raleigh Operations | 40 FTE |
| NAT-SIZE | Industrial Refrigeration Service, Inc. | 40 FTE |
| NAT-SIZE | Denver Metro Electric Inc. | 40 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.