Pavement, highway, road, street, bridge or airport runway, construction · Florida
C.W. Roberts Contracting Wildwood Division
Wildwood, FL · ~103 workers · 9 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 2.7
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
C.W. Roberts Contracting Wildwood Division runs at 97% of its industry's injury rate - about level with the typical Pavement, highway, road, street, bridge or airport runway, construction workplace, earning a grade C.
C.W. Roberts Contracting Wildwood Division: 2.7 TCR = 97% of Pavement, highway, road, street, bridge or airport runway, construction BLS 2.8 · 9y Form 300A (see methodology below)
C.W. Roberts Contracting Wildwood Division safety composite
C.W. Roberts Contracting Wildwood Division scores strongest on total case rate (tcr) (safer than 54% of same-industry peers) and weakest on dart rate (safer than 32%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
46/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 2.71 per 100 workers
Safer than 54% of industry peers
- DART rate
- F 2.5 per 100 workers
Safer than 32% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
C.W. Roberts Contracting Wildwood Division held a steady TCR band
C.W. Roberts Contracting Wildwood Division's TCR held near 0.0 from 3.0 in 2016 to 3.0 in 2024. Peak filing year was 2020 at 6.5 TCR. In 2024, DART was 0.92× this establishment's average TCR (severity share of cases).
2016=3.0 · 2017=0.0 · 2018=2.5 · 2019=1.0 · 2020=6.5 · 2021=5.9 · 2022=0.6 · 2023=1.9 · 2024=3.0
OSHA ITA Form 300A scorecard
Establishment book 237310 · Wildwood, FL AT/BELOW-IND · MID
Grade C · TCR 2.7 · 97% of ind
- DART 2.5 DART
- RANK #85/174
- PHOTO North AL Division
- BOOK 9y book
- INJ 30 inj
- SIZE ~103 FTE
Nearest TCR peer: North AL Division (0.0 TCR gap)
Read with this employer → · Industry book → · Florida employers → · Look up another →
C.W. Roberts Contracting Wildwood Division in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
C.W. Roberts Contracting Wildwood Division
2.7 TCR
- North AL Divis
North AL Division
2.7 TCR
- Freesen
Freesen
2.7 TCR
- Billeter Marin
Billeter Marine
2.7 TCR
- Hawkeye Paving
Hawkeye Paving Corp.
2.7 TCR
What this shows C.W. Roberts Contracting Wildwood Division averages 2.7 TCR (97% of the Pavement, highway, road, street, bridge or airport runway, construction BLS benchmark).
C.W. Roberts Contracting Wildwood Division TCR series: 2016=3 · 2017=0 · 2018=2.5 · 2019=1 · 2020=6.5 · 2021=5.9 · 2022=0.6 · 2023=1.9 · 2024=3 · BLS 2.8
Where C.W. Roberts Contracting Wildwood Division falls in its industry
4,078 Pavement, highway, road, stree establishmentsSafer than 54% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Florida alone (the establishments it most directly competes with for workers and contracts): ranked #85 safest of 174 Pavement, highway, road, stree employers in Florida.
C.W. Roberts Contracting Wildwood Division has more employees than the Pavement, highway, road, street, bridge median and a lower injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 3.0 | 2.5 | 6 | 0 | 0 |
| 2023 | 1.9 | 1.4 | 4 | 0 | 0 |
| 2022 | 0.6 | 0.6 | 1 | 0 | 0 |
| 2021 | 5.9 | 4.2 | 7 | 0 | 0 |
| 2020 | 6.5 | 6.5 | 7 | 0 | 0 |
| 2019 | 1.0 | 1.0 | 1 | 0 | 0 |
| 2018 | 2.5 | 1.2 | 2 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 3.0 | 3.0 | 2 | 1 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · FL · Wildwood
4,078 Pavement, highway, road, street, bridge or airport runway, construction employers nationwide with a credible TCR · 26,569 rated employers in Florida with headcount on file · 39 employers in Wildwood, FL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | North AL Division | 2.7 TCR |
| NAICS-TCR | Freesen | 2.7 TCR |
| NAICS-TCR | Billeter Marine | 2.7 TCR |
| NAICS-TCR | Hawkeye Paving Corp. | 2.7 TCR |
| STATE-SIZE | Deseret Cattle & Citrus | 103 FTE |
| STATE-SIZE | Jaret Construction llc dba WD Site Development | 103 FTE |
| STATE-SIZE | The Nassal Company | 103 FTE |
| STATE-SIZE | Randall Engineered Wall System | 103 FTE |
| CITY-NEAR | Hughes Brothers Construction Inc | 458 FTE |
| CITY-NEAR | Nash PM | 301 FTE |
| CITY-NEAR | RAINEY CONSTRUCTION COMPANY | 209 FTE |
| CITY-NEAR | Nash Plumbing and Mechanical | 204 FTE |
| NAT-TCR | Brookdale Hartwell | 2.7 TCR |
| NAT-TCR | Giant Eagle #0216 | 2.7 TCR |
| NAT-TCR | Homewood Suites Fort Worth Medical Center | 2.7 TCR |
| NAT-TCR | Anagraphica, Inc. | 2.7 TCR |
| NAT-SIZE | Prairie View Campus | 103 FTE |
| NAT-SIZE | Giant Eagle #6529 | 103 FTE |
| NAT-SIZE | Behr Paint Company Kutztown Distribution | 103 FTE |
| NAT-SIZE | Guest Supply LLC. (409 Kennedy Drive, Sayreville, NJ) | 103 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.