Substation and switching station, power transmission line, construction · Pennsylvania
Danella Power Services, Inc.
Plymouth Meeting, PA · ~112 workers · 5 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 1.3
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Danella Power Services, Inc. runs at 45% of its industry's injury rate - far safer than the typical Substation and switching station, power transmission line, construction workplace, earning a grade A.
Danella Power Services, Inc.: 1.3 TCR = 45% of Substation and switching station, power transmission line, construction BLS 2.8 · 5y Form 300A (see methodology below)
Danella Power Services, Inc. safety composite
Danella Power Services, Inc. scores strongest on total case rate (tcr) (safer than 67% of same-industry peers) and weakest on dart rate (safer than 47%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
56/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 1.26 per 100 workers
Safer than 67% of industry peers
- DART rate
- D 0.59 per 100 workers
Safer than 47% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−1.2
2019→2024
Danella Power Services, Inc. injury rate improved
Danella Power Services, Inc.'s TCR fell 1.2 from 2.4 in 2019 to 1.2 in 2024. Peak filing year was 2019 at 2.4 TCR. In 2024, DART was 0.47× this establishment's average TCR (severity share of cases).
2019=2.4 · 2020=1.3 · 2022=0.6 · 2023=0.8 · 2024=1.2
OSHA ITA Form 300A scorecard
Establishment book 237130 · Plymouth Meeting, PA AT/BELOW-IND · MID
Grade A · TCR 1.3 · 45% of ind
- DART 0.6 DART
- RANK #20/54
- PHOTO North Houston Pole L…
- BOOK 5y book
- INJ 5 inj
- SIZE ~112 FTE
Nearest TCR peer: North Houston Pole Line, L.P. (0.0 TCR gap)
Read with this employer → · Industry book → · Pennsylvania employers → · Look up another →
Danella Power Services, Inc. in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Danella Power Services, Inc.
1.3 TCR
- North Houston
North Houston Pole Line, L.P.
1.3 TCR
- Plymouth MA
Plymouth MA
1.3 TCR
- Pro Serv Indus
Pro Serv Industrial Contractors, LLC
1.3 TCR
- B Robinson San
B Robinson San Antonio
1.3 TCR
What this shows Danella Power Services, Inc. averages 1.3 TCR (45% of the Substation and switching station, power transmission line, construction BLS benchmark).
Danella Power Services, Inc. TCR series: 2019=2.4 · 2020=1.3 · 2022=0.6 · 2023=0.8 · 2024=1.2 · BLS 2.8
Where Danella Power Services, Inc. falls in its industry
1,605 Substation and switching stati establishmentsSafer than 67% of graded establishments in this industry, whose median TCR is 2.0.
Narrower to Pennsylvania alone (the establishments it most directly competes with for workers and contracts): ranked #20 safest of 54 Substation and switching stati employers in Pennsylvania.
Danella Power Services, Inc. has more employees than the Substation and switching station, power median and a lower injury rate than the industry's median TCR of 2.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 1.2 | 0.6 | 2 | 0 | 0 |
| 2023 | 0.8 | 0.0 | 1 | 0 | 0 |
| 2022 | 0.6 | 0.6 | 1 | 0 | 0 |
| 2020 | 1.3 | 0.6 | 1 | 1 | 0 |
| 2019 | 2.4 | 0.0 | 0 | 1 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237130 · PA · Plymouth Meeting
1,605 Substation and switching station, power transmission line, construction employers nationwide with a credible TCR · 22,692 rated employers in Pennsylvania with headcount on file · 64 employers in Plymouth Meeting, PA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | North Houston Pole Line, L.P. | 1.3 TCR |
| NAICS-TCR | Plymouth MA | 1.3 TCR |
| NAICS-TCR | Pro Serv Industrial Contractors, LLC | 1.3 TCR |
| NAICS-TCR | B Robinson San Antonio | 1.3 TCR |
| STATE-SIZE | Montour, LLC | 112 FTE |
| STATE-SIZE | Overhead Transmission Center | 112 FTE |
| STATE-SIZE | Lennar - Philadelphia | 112 FTE |
| STATE-SIZE | Kay Builders | 112 FTE |
| CITY-NEAR | General Healthcare Resources LLC - 1 | 1,378 FTE |
| CITY-NEAR | Organon, LLC Plymouth Meeting Office | 1,021 FTE |
| CITY-NEAR | Gemma Services | 446 FTE |
| CITY-NEAR | Philadelphia D&M Inc. | 396 FTE |
| NAT-TCR | Clarke Power Services-030 | 1.3 TCR |
| NAT-TCR | Davis Wallbridge Inc. | 1.3 TCR |
| NAT-TCR | Olympus Redmond | 1.3 TCR |
| NAT-TCR | Pascagoula Service Center | 1.3 TCR |
| NAT-SIZE | Western Boxed Meat Portland | 112 FTE |
| NAT-SIZE | Shepherd of The Valley Lutheran Retirement | 112 FTE |
| NAT-SIZE | Kaiser Aluminum - Alutek | 112 FTE |
| NAT-SIZE | Satilla Grocery | 112 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.