Foundation, building, poured concrete, contractors · California
DiCarlo Concrete, Inc.
Rancho Cucamonga, CA · ~170 workers · 7 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 9.1
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
DiCarlo Concrete, Inc. runs at 326% of its industry's injury rate - far more dangerous than the typical Foundation, building, poured concrete, contractors workplace, earning a grade F.
DiCarlo Concrete, Inc.: 9.1 TCR = 326% of Foundation, building, poured concrete, contractors BLS 2.8 · 7y Form 300A (see methodology below)
DiCarlo Concrete, Inc. safety composite
DiCarlo Concrete, Inc. scores strongest on dart rate (safer than 59% of same-industry peers) and weakest on total case rate (tcr) (safer than 13%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
39/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 9.12 per 100 workers
Safer than 13% of industry peers
- DART rate
- C 0.64 per 100 workers
Safer than 59% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−17.9
2017→2024
DiCarlo Concrete, Inc. injury rate improved
DiCarlo Concrete, Inc.'s TCR fell 17.9 from 18.6 in 2017 to 0.6 in 2024. Peak filing year was 2017 at 18.6 TCR. In 2024, DART was 0.07× this establishment's average TCR (severity share of cases).
2017=18.6 · 2018=17.4 · 2019=7.8 · 2020=9.7 · 2022=5.1 · 2023=4.6 · 2024=0.6
OSHA ITA Form 300A scorecard
Establishment book 238110 · Rancho Cucamonga, CA ABOVE-IND · MID
Grade F · TCR 9.1 · 326% of ind
- DART 0.6 DART
- RANK #136/166
- PHOTO Walters Ready Mix, I…
- BOOK 7y book
- INJ 91 inj
- SIZE ~170 FTE
Nearest TCR peer: Walters Ready Mix, Inc. (0.0 TCR gap)
Read with this employer → · Industry book → · California employers → · Look up another →
DiCarlo Concrete, Inc. in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Carmona Constr
Carmona Construction LLC
9.2 TCR
- This site
DiCarlo Concrete, Inc.
9.1 TCR
- Walters Ready
Walters Ready Mix, Inc.
9.1 TCR
- Tom Corea Cons
Tom Corea Construction, Inc.
9 TCR
- Heartland Pave
Heartland Pavers, LLC
9 TCR
What this shows DiCarlo Concrete, Inc. averages 9.1 TCR (326% of the Foundation, building, poured concrete, contractors BLS benchmark).
DiCarlo Concrete, Inc. TCR series: 2017=18.6 · 2018=17.4 · 2019=7.8 · 2020=9.7 · 2022=5.1 · 2023=4.6 · 2024=0.6 · BLS 2.8
Where DiCarlo Concrete, Inc. falls in its industry
1,314 Foundation, building, poured c establishmentsSafer than 13% of graded establishments in this industry, whose median TCR is 3.8.
Narrower to California alone (the establishments it most directly competes with for workers and contracts): ranked #136 safest of 166 Foundation, building, poured c employers in California.
DiCarlo Concrete, Inc. has more employees than the Foundation, building, poured concrete, c median and a higher injury rate than the industry's median TCR of 3.8. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.6 | 0.6 | 1 | 0 | 0 |
| 2023 | 4.6 | 4.6 | 9 | 1 | 0 |
| 2022 | 5.1 | 4.4 | 6 | 1 | 0 |
| 2020 | 9.7 | 7.6 | 14 | 0 | 0 |
| 2019 | 7.8 | 6.3 | 10 | 0 | 0 |
| 2018 | 17.4 | 10.3 | 27 | 0 | 0 |
| 2017 | 18.6 | 18.6 | 24 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238110 · CA · Rancho Cucamonga
1,314 Foundation, building, poured concrete, contractors employers nationwide with a credible TCR · 51,834 rated employers in California with headcount on file · 229 employers in Rancho Cucamonga, CA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Walters Ready Mix, Inc. | 9.1 TCR |
| NAICS-TCR | Carmona Construction LLC | 9.2 TCR |
| NAICS-TCR | Tom Corea Construction, Inc. | 9.0 TCR |
| NAICS-TCR | Heartland Pavers, LLC | 9.0 TCR |
| STATE-SIZE | MERRILL FARMS LLC | 170 FTE |
| STATE-SIZE | RICHMOND SERVICE CENTER | 170 FTE |
| STATE-SIZE | Shaw & Sons, Inc. | 170 FTE |
| STATE-SIZE | Anderson Charnesky Structural Steel, Inc. | 170 FTE |
| CITY-NEAR | California Department of Transportation Facility 304 | 1,529 FTE |
| CITY-NEAR | Davis Development Company, Inc. | 1,214 FTE |
| CITY-NEAR | CUCAMONGA | 809 FTE |
| CITY-NEAR | VIP,INC. Rancho Cucamonga | 751 FTE |
| NAT-TCR | Woodway, Inc. | 9.1 TCR |
| NAT-TCR | NSI | Bridgeport Fittings | 9.1 TCR |
| NAT-TCR | Apex Transportation, Inc. | 9.1 TCR |
| NAT-TCR | MN - Fairmont | 9.1 TCR |
| NAT-SIZE | BEF Foods, INC. - Sulphur Springs | 170 FTE |
| NAT-SIZE | Kress Corporation | 170 FTE |
| NAT-SIZE | Police Department | 170 FTE |
| NAT-SIZE | Store 013 | 170 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.