Concrete paving (i.e., highway, road, street, public sidewalk) · Pennsylvania
Doug Lamb Construction Inc
Elizabethtown, PA · ~32 workers · 6 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 4.7
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Doug Lamb Construction Inc runs at 169% of its industry's injury rate - more dangerous than the typical Concrete paving (i.e., highway, road, street, public sidewalk) workplace, earning a grade D.
Doug Lamb Construction Inc: 4.7 TCR = 169% of Concrete paving (i.e., highway, road, street, public sidewalk) BLS 2.8 · 6y Form 300A (see methodology below)
Doug Lamb Construction Inc safety composite
Doug Lamb Construction Inc scores strongest on dart rate (safer than 81% of same-industry peers) and weakest on total case rate (tcr) (safer than 31%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
54/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 4.73 per 100 workers
Safer than 31% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 81% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−0.5
2017→2024
Doug Lamb Construction Inc injury rate improved
Doug Lamb Construction Inc's TCR fell 0.5 from 4.9 in 2017 to 4.3 in 2024. Peak filing year was 2021 at 10.2 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2017=4.9 · 2018=0.0 · 2019=0.0 · 2021=10.2 · 2022=9.0 · 2024=4.3
OSHA ITA Form 300A scorecard
Establishment book 237310 · Elizabethtown, PA ABOVE-IND · SMALL
Grade D · TCR 4.7 · 169% of ind
- DART 0.0 DART
- RANK #130/196
- PHOTO Glenn Thurman, Inc.
- BOOK 6y book
- INJ 6 inj
- SIZE ~32 FTE
Nearest TCR peer: Glenn Thurman, Inc. (0.0 TCR gap)
Read with this employer → · Industry book → · Pennsylvania employers → · Look up another →
Doug Lamb Construction Inc in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Doug Lamb Construction Inc
4.7 TCR
- Glenn Thurman,
Glenn Thurman, Inc.
4.7 TCR
- SealPros Inc
SealPros Inc
4.7 TCR
- Peek Pavement
Peek Pavement Marking Cleveland, GA
4.7 TCR
- Motor Carriers
Motor Carriers
4.7 TCR
What this shows Doug Lamb Construction Inc averages 4.7 TCR (169% of the Concrete paving (i.e., highway, road, street, public sidewalk) BLS benchmark).
Doug Lamb Construction Inc TCR series: 2017=4.9 · 2018=0 · 2019=0 · 2021=10.2 · 2022=9 · 2024=4.3 · BLS 2.8
Where Doug Lamb Construction Inc falls in its industry
4,078 Concrete paving (i.e., highway establishmentsSafer than 31% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Pennsylvania alone (the establishments it most directly competes with for workers and contracts): ranked #130 safest of 196 Concrete paving (i.e., highway employers in Pennsylvania.
Doug Lamb Construction Inc has fewer employees than the Concrete paving (i.e., highway, road, st median and a higher injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 4.3 | 0.0 | 1 | 0 | 0 |
| 2022 | 9.0 | 0.0 | 2 | 0 | 0 |
| 2021 | 10.2 | 10.2 | 2 | 0 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 4.9 | 4.9 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · PA · Elizabethtown
4,078 Concrete paving (i.e., highway, road, street, public sidewalk) employers nationwide with a credible TCR · 22,692 rated employers in Pennsylvania with headcount on file · 47 employers in Elizabethtown, PA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Glenn Thurman, Inc. | 4.7 TCR |
| NAICS-TCR | SealPros Inc | 4.7 TCR |
| NAICS-TCR | Peek Pavement Marking Cleveland, GA | 4.7 TCR |
| NAICS-TCR | Motor Carriers | 4.7 TCR |
| STATE-SIZE | KNOUSE FRUITLANDS, INC. | 32 FTE |
| STATE-SIZE | Paramount Mushroom Farms LLC | 32 FTE |
| STATE-SIZE | Wharf | 32 FTE |
| STATE-SIZE | DAJ Mushroom | 32 FTE |
| CITY-NEAR | Masonic Villages at Elizabethtown | 1,879 FTE |
| CITY-NEAR | ELZ | 327 FTE |
| CITY-NEAR | 8010130 Mars Snackfood Elizabethtown | 254 FTE |
| CITY-NEAR | Amazon.com Services LLC - DPH7 | 248 FTE |
| NAT-TCR | Burggraf's Ace Hardware & Paint Co | 4.7 TCR |
| NAT-TCR | Alliedbean Demolition | 4.7 TCR |
| NAT-TCR | NOC Surgery Center | 4.7 TCR |
| NAT-TCR | Island Park-Ny59 | 4.7 TCR |
| NAT-SIZE | Wastewater Treatment Plant (WWTP) | 32 FTE |
| NAT-SIZE | Arauco North America - Biscoe | 32 FTE |
| NAT-SIZE | Midwest Infrastructure, Inc. | 32 FTE |
| NAT-SIZE | James Construction Group LLC -Miller Springs | 32 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.