Power generation, wind electric · Texas

EC&R Services, LLC-EES Roscoe

Roscoe, TX · ~22 workers · 2 years of OSHA Injury Tracking Application data.

C
Average Safety Record
0.0
Avg TCR
1.2
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

EC&R Services, LLC-EES Roscoe runs at 0% of its industry's injury rate - about level with the typical Power generation, wind electric workplace, earning a grade C.

EC&R Services, LLC-EES Roscoe: 0.0 TCR = 0% of Power generation, wind electric BLS 1.2 · 2y Form 300A (see methodology below)

EC&R Services, LLC-EES Roscoe safety composite

EC&R Services, LLC-EES Roscoe scores strongest on total case rate (tcr) (safer than 100% of same-industry peers) and weakest on fatalities (safer than 52%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

B

78/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
A 0 per 100 workers

Safer than 100% of industry peers

DART rate
C 0 per 100 workers

Safer than 70% of industry peers

Fatalities
D 0

Safer than 52% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

EC&R Services, LLC-EES Roscoe held a steady TCR band

EC&R Services, LLC-EES Roscoe's TCR held near 0.0 from 0.0 in 2016 to 0.0 in 2018. Peak filing year was 2016 at 0.0 TCR.

2016=0.0 · 2018=0.0

OSHA ITA Form 300A scorecard

Establishment book 221115 · Roscoe, TX AT/BELOW-IND · SMALL

Grade C · TCR 0.0 · 0% of ind

  • DART 0.0 DART
  • RANK #0/22
  • PHOTO Avangrid Renewables
  • BOOK 2y book
  • INJ 0 inj
  • SIZE ~22 FTE

Nearest TCR peer: Avangrid Renewables (0.1 TCR gap)

Read with this employer → · Industry book → · Texas employers → · Look up another →

EC&R Services, LLC-EES Roscoe in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows EC&R Services, LLC-EES Roscoe averages 0.0 TCR (0% of the Power generation, wind electric BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

EC&R Services, LLC-EES Roscoe TCR series: 2016=0 · 2018=0 · BLS 1.2

Where EC&R Services, LLC-EES Roscoe falls in its industry

64 Power generation, wind electri establishments

Safer than 100% of graded establishments in this industry, whose median TCR is 1.4.

More dangerous than peersSafer than peers

Narrower to Texas alone (the establishments it most directly competes with for workers and contracts): ranked #0 safest of 22 Power generation, wind electri employers in Texas.

EC&R Services, LLC-EES Roscoe (22 employees, TCR 0.0) among 29 same-industry peers, split at the industry median of 39 employees and a TCR of 1.4 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 01,0002,0003,000 02468 Average employees Total Case Rate EC&R Services, LLC-EES Roscoe
EC&R Services, LLC-EES Roscoe (22 employees, TCR 0.0) among 29 same-industry peers, split at the industry median of 39 employees and a TCR of 1.4

EC&R Services, LLC-EES Roscoe has fewer employees than the Power generation, wind electric median and a lower injury rate than the industry's median TCR of 1.4. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2018 0.0 0.0 0 0 0
2016 0.0 0.0 0 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

221115 · TX · Roscoe

64 Power generation, wind electric employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 7 employers in Roscoe, TX · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR Avangrid Renewables 0.1 TCR
NAICS-TCR Enel North America, Inc. 0.2 TCR
NAICS-TCR New York Headquarters 0.2 TCR
NAICS-TCR BHI Energy - Renewables 0.2 TCR
STATE-SIZE Matador Ranch 22 FTE
STATE-SIZE Wheeler Land & Livestock, LLC 22 FTE
STATE-SIZE Diamond B Feedyard, LLC 22 FTE
STATE-SIZE Luckey Custom Feedlot, Inc. 22 FTE
CITY-NEAR Eagle Railcar Services - Roscoe, Inc 82 FTE
CITY-NEAR RWE Renewables Services LLC-Roscoe 78 FTE
CITY-NEAR Eagle Railcar Services Roscoe 76 FTE
CITY-NEAR EC&R Services, LLC-Roscoe 41 FTE
NAT-TCR Aviation Other : Virtual Employee Roll-Up Site 0.0 TCR
NAT-TCR AZ-01 0.0 TCR
NAT-TCR CT-02 0.0 TCR
NAT-TCR NJ-05 0.0 TCR
NAT-SIZE Ankeny Duplex 22 FTE
NAT-SIZE Hope House Foundation: Lakewood 22 FTE
NAT-SIZE Olathe Millwork, LLC 22 FTE
NAT-SIZE Yancey Home Improvements Inc. 22 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2018, 2016. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.