Construction management, oil refinery and petrochemical complex · Colorado
Elkhorn Construction, Front Range Service Area
Longmont, CO · ~344 workers · 2 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.4
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Elkhorn Construction, Front Range Service Area runs at 16% of its industry's injury rate - far safer than the typical Construction management, oil refinery and petrochemical complex workplace, earning a grade A.
Elkhorn Construction, Front Range Service Area: 0.4 TCR = 16% of Construction management, oil refinery and petrochemical complex BLS 2.8 · 2y Form 300A (see methodology below)
Elkhorn Construction, Front Range Service Area safety composite
Elkhorn Construction, Front Range Service Area scores strongest on total case rate (tcr) (safer than 65% of same-industry peers) and weakest on dart rate (safer than 34%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
51/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 0.44 per 100 workers
Safer than 65% of industry peers
- DART rate
- F 0.21 per 100 workers
Safer than 34% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Elkhorn Construction, Front Range Service Area held a steady TCR band
Elkhorn Construction, Front Range Service Area's TCR held near 0.0 from 0.5 in 2016 to 0.4 in 2017. Peak filing year was 2016 at 0.5 TCR. In 2017, DART was 0.48× this establishment's average TCR (severity share of cases).
2016=0.5 · 2017=0.4
OSHA ITA Form 300A scorecard
Establishment book 237120 · Longmont, CO AT/BELOW-IND · MID
Grade A · TCR 0.4 · 16% of ind
- DART 0.2 DART
- RANK #8/24
- PHOTO Q3 Contracting Inc
- BOOK 2y book
- INJ 4 inj
- SIZE ~344 FTE
Nearest TCR peer: Q3 Contracting Inc (0.0 TCR gap)
Read with this employer → · Industry book → · Colorado employers → · Look up another →
Elkhorn Construction, Front Range Service Area in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Elkhorn Construction, Front Range Service Area
0.4 TCR
- Q3 Contracting
Q3 Contracting Inc
0.4 TCR
- Lonesome Dove
Lonesome Dove
0.4 TCR
- Precision West
Precision West, LLC
0.4 TCR
- Turnaround Wel
Turnaround Welding Services
0.4 TCR
What this shows Elkhorn Construction, Front Range Service Area averages 0.4 TCR (16% of the Construction management, oil refinery and petrochemical complex BLS benchmark).
Elkhorn Construction, Front Range Service Area TCR series: 2016=0.5 · 2017=0.4 · BLS 2.8
Where Elkhorn Construction, Front Range Service Area falls in its industry
809 Construction management, oil r establishmentsSafer than 65% of graded establishments in this industry, whose median TCR is 0.7.
Narrower to Colorado alone (the establishments it most directly competes with for workers and contracts): ranked #8 safest of 24 Construction management, oil r employers in Colorado.
Elkhorn Construction, Front Range Service Area has more employees than the Construction management, oil refinery an median and a lower injury rate than the industry's median TCR of 0.7. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2017 | 0.4 | 0.2 | 2 | 0 | 0 |
| 2016 | 0.5 | 0.0 | 2 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237120 · CO · Longmont
809 Construction management, oil refinery and petrochemical complex employers nationwide with a credible TCR · 9,007 rated employers in Colorado with headcount on file · 182 employers in Longmont, CO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Q3 Contracting Inc | 0.4 TCR |
| NAICS-TCR | Lonesome Dove | 0.4 TCR |
| NAICS-TCR | Precision West, LLC | 0.4 TCR |
| NAICS-TCR | Turnaround Welding Services | 0.4 TCR |
| STATE-SIZE | GeoStabilization International | 344 FTE |
| STATE-SIZE | Kiewit Corporation_9780 Mount Pyramid Court | 344 FTE |
| STATE-SIZE | Primoris Renewable Energy | 345 FTE |
| STATE-SIZE | CoorsTek, Inc. - Clear Creek Valley Plant | 343 FTE |
| CITY-NEAR | Longmont, CO | 1,167 FTE |
| CITY-NEAR | Longmont United Hospital | 638 FTE |
| CITY-NEAR | 2643-05500001-055001 | 562 FTE |
| CITY-NEAR | Longs Peak Hospital | 537 FTE |
| NAT-TCR | Wisenbaker Builder Services - WF | 0.4 TCR |
| NAT-TCR | B&E Resources | 0.4 TCR |
| NAT-TCR | CN Portland | 0.4 TCR |
| NAT-TCR | PITG | 0.4 TCR |
| NAT-SIZE | Lakewood (Njlak) | 344 FTE |
| NAT-SIZE | Norwalk (Ctnlk) | 344 FTE |
| NAT-SIZE | Splitrock Resort | 344 FTE |
| NAT-SIZE | Pace industries, Harrison Division | 344 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.