Electric power generation, fossil fuel (e.g., coal, oil, gas) · North Carolina
Fayetteville Public Works Commission
Fayetteville, NC · ~635 workers · 4 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 3.0
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Fayetteville Public Works Commission runs at 246% of its industry's injury rate - far more dangerous than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade F.
Fayetteville Public Works Commission: 3.0 TCR = 246% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 4y Form 300A (see methodology below)
Fayetteville Public Works Commission safety composite
Fayetteville Public Works Commission scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 14%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
26/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 2.95 per 100 workers
Safer than 21% of industry peers
- DART rate
- F 2.2 per 100 workers
Safer than 14% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−0.9
2018→2021
Fayetteville Public Works Commission injury rate improved
Fayetteville Public Works Commission's TCR fell 0.9 from 3.9 in 2018 to 3.0 in 2021. Peak filing year was 2018 at 3.9 TCR. In 2021, DART was 0.75× this establishment's average TCR (severity share of cases).
2018=3.9 · 2019=2.6 · 2020=2.4 · 2021=3.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Fayetteville, NC ABOVE-IND · MID
Grade F · TCR 3.0 · 246% of ind
- DART 2.2 DART
- RANK #16/20
- PHOTO Turk Plant
- BOOK 4y book
- INJ 77 inj
- SIZE ~635 FTE
Nearest TCR peer: Turk Plant (0.0 TCR gap)
Read with this employer → · Industry book → · North Carolina employers → · Look up another →
Fayetteville Public Works Commission in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Fayetteville Public Works Commission
3 TCR
- Turk Plant
Turk Plant
3 TCR
- OG&E-Sooner Po
OG&E-Sooner Power Plant
3 TCR
- Southern Illin
Southern Illinois Power Cooperative
3 TCR
- PSE, TAC - Tac
PSE, TAC - Tacoma Business Office
3 TCR
What this shows Fayetteville Public Works Commission averages 3.0 TCR (246% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
Fayetteville Public Works Commission TCR series: 2018=3.9 · 2019=2.6 · 2020=2.4 · 2021=3 · BLS 1.2
Where Fayetteville Public Works Commission falls in its industry
846 Electric power generation, fos establishmentsSafer than 21% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #16 safest of 20 Electric power generation, fos employers in North Carolina.
Fayetteville Public Works Commission has more employees than the Electric power generation, fossil fuel ( median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2021 | 3.0 | 2.2 | 19 | 0 | 0 |
| 2020 | 2.4 | 1.9 | 16 | 0 | 0 |
| 2019 | 2.6 | 2.2 | 15 | 1 | 0 |
| 2018 | 3.9 | 2.9 | 27 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · NC · Fayetteville
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 317 employers in Fayetteville, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Turk Plant | 3.0 TCR |
| NAICS-TCR | OG&E-Sooner Power Plant | 3.0 TCR |
| NAICS-TCR | Southern Illinois Power Cooperative | 3.0 TCR |
| NAICS-TCR | PSE, TAC - Tacoma Business Office | 3.0 TCR |
| STATE-SIZE | AMZL : DLT2 | 635 FTE |
| STATE-SIZE | 5165 Winston Salem Assembly | 636 FTE |
| STATE-SIZE | Technimark, LLC Plant 5 | 633 FTE |
| STATE-SIZE | Wendell | 633 FTE |
| CITY-NEAR | Cape Fear Valley Health System/Cumberland County | 5,925 FTE |
| CITY-NEAR | Goodyear Tire and Rubber Company - Fayetteville | 2,118 FTE |
| CITY-NEAR | County of Cumberland | 2,104 FTE |
| CITY-NEAR | Goodyear Fayetteville | 2,044 FTE |
| NAT-TCR | Erwin Manufacturing Complex | 3.0 TCR |
| NAT-TCR | Datamars Inc Temple | 3.0 TCR |
| NAT-TCR | Healthplex | 3.0 TCR |
| NAT-TCR | Hydro Portland Fabrications | 3.0 TCR |
| NAT-SIZE | MCC | 635 FTE |
| NAT-SIZE | K102-M001 | 635 FTE |
| NAT-SIZE | Marvin's Hardware | 635 FTE |
| NAT-SIZE | Morrison, Ekre & Bart Management Services, Inc. | 635 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.