Electric Power Distribution · Alabama
Hueytown Crew Headquarters - APC
Hueytown, AL · ~43 workers · 2 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 7.3
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Hueytown Crew Headquarters - APC runs at 609% of its industry's injury rate - far more dangerous than the typical Electric Power Distribution workplace, earning a grade F.
Hueytown Crew Headquarters - APC: 7.3 TCR = 609% of Electric Power Distribution BLS 1.2 · 2y Form 300A (see methodology below)
Hueytown Crew Headquarters - APC safety composite
Hueytown Crew Headquarters - APC scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on total case rate (tcr) (safer than 8%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
28/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 7.31 per 100 workers
Safer than 8% of industry peers
- DART rate
- F 2.22 per 100 workers
Safer than 33% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−10.2
2023→2024
Hueytown Crew Headquarters - APC injury rate improved
Hueytown Crew Headquarters - APC's TCR fell 10.2 from 12.4 in 2023 to 2.2 in 2024. Peak filing year was 2023 at 12.4 TCR. In 2024, DART was 0.3× this establishment's average TCR (severity share of cases).
2023=12.4 · 2024=2.2
OSHA ITA Form 300A scorecard
Establishment book 221122 · Hueytown, AL ABOVE-IND · SMALL
Grade F · TCR 7.3 · 609% of ind
- DART 2.2 DART
- RANK #113/138
- PHOTO Eversource - Cheshire
- BOOK 2y book
- INJ 5 inj
- SIZE ~43 FTE
Nearest TCR peer: Eversource - Cheshire (0.0 TCR gap)
Read with this employer → · Industry book → · Alabama employers → · Look up another →
Hueytown Crew Headquarters - APC in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Hueytown Crew Headquarters - APC
7.3 TCR
- Eversource - C
Eversource - Cheshire
7.3 TCR
- Gascosage Elec
Gascosage Electric Cooperative
7.3 TCR
- Cartersville O
Cartersville Operating - 10 & 41 Massell Drive Cartersville
7.3 TCR
- CEMC-Gallatin
CEMC-Gallatin
7.3 TCR
What this shows Hueytown Crew Headquarters - APC averages 7.3 TCR (609% of the Electric Power Distribution BLS benchmark).
Hueytown Crew Headquarters - APC TCR series: 2023=12.4 · 2024=2.2 · BLS 1.2
Where Hueytown Crew Headquarters - APC falls in its industry
2,958 Electric Power Distribution establishmentsSafer than 8% of graded establishments in this industry, whose median TCR is 2.5.
Narrower to Alabama alone (the establishments it most directly competes with for workers and contracts): ranked #113 safest of 138 Electric Power Distribution employers in Alabama.
Hueytown Crew Headquarters - APC has fewer employees than the Electric Power Distribution median and a higher injury rate than the industry's median TCR of 2.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 2.2 | 2.2 | 1 | 0 | 0 |
| 2023 | 12.4 | 9.9 | 4 | 1 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221122 · AL · Hueytown
2,958 Electric Power Distribution employers nationwide with a credible TCR · 7,418 rated employers in Alabama with headcount on file · 25 employers in Hueytown, AL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Eversource - Cheshire | 7.3 TCR |
| NAICS-TCR | Gascosage Electric Cooperative | 7.3 TCR |
| NAICS-TCR | Cartersville Operating - 10 & 41 Massell Drive Cartersville | 7.3 TCR |
| NAICS-TCR | CEMC-Gallatin | 7.3 TCR |
| STATE-SIZE | Generation Fossil Gadsden Steam Plant | 43 FTE |
| STATE-SIZE | Auburn Crew Headquarters | 43 FTE |
| STATE-SIZE | Clarke-Washington Electric Membership Corporation | 43 FTE |
| STATE-SIZE | Auburn Crew Headquarters - APC | 43 FTE |
| CITY-NEAR | WM 4497 | 341 FTE |
| CITY-NEAR | 4497 | 324 FTE |
| CITY-NEAR | Robbie D. Wood, Inc. | 295 FTE |
| CITY-NEAR | Store 1065 | 139 FTE |
| NAT-TCR | Denew - Christiana | 7.3 TCR |
| NAT-TCR | Cafoa - Scs Jurupa Distribution Center - 11546 | 7.3 TCR |
| NAT-TCR | K & K Metal Recycling | 7.3 TCR |
| NAT-TCR | Tahoe Donner Association | 7.3 TCR |
| NAT-SIZE | Alpha Nursery Inc | 43 FTE |
| NAT-SIZE | Milud - Ludington | 43 FTE |
| NAT-SIZE | BOSS Construction, Incorporated | 43 FTE |
| NAT-SIZE | UHM/Vanguard Center/HPC | 43 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.