Fossil Fuel Electric Power Generation · Missouri
Iatan Generating Station
Weston, MO · ~200 workers · 7 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 2.2
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Iatan Generating Station runs at 186% of its industry's injury rate - more dangerous than the typical Fossil Fuel Electric Power Generation workplace, earning a grade D.
Iatan Generating Station: 2.2 TCR = 186% of Fossil Fuel Electric Power Generation BLS 1.2 · 7y Form 300A (see methodology below)
Iatan Generating Station safety composite
Iatan Generating Station scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 17%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
31/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 2.23 per 100 workers
Safer than 31% of industry peers
- DART rate
- F 1.95 per 100 workers
Safer than 17% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Iatan Generating Station: 0.0 → 3.2 TCR
Peak year 2023 @ 4.5 TCR · DART/TCR 0.87× in 2024
Iatan Generating Station's TCR rose 3.2 from 0.0 in 2018 to 3.2 in 2024. Peak filing year was 2023 at 4.5 TCR. In 2024, DART was 0.87× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221112 · Weston, MO ABOVE-IND · MID
Grade D · TCR 2.2 · 186% of ind
- DART 1.9 DART
- RANK #21/42
- PHOTO Milton R. Young Stat…
- BOOK 7y book
- INJ 31 inj
- SIZE ~200 FTE
Nearest TCR peer: Milton R. Young Station (0.0 TCR gap)
Read with this employer → · Industry book → · Missouri employers → · Look up another →
Iatan Generating Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Iatan Generating Station
2.2 TCR
- Milton R. Youn
Milton R. Young Station
2.2 TCR
- Basin Electric
Basin Electric Power Cooperative - Leland Olds Station
2.2 TCR
- Hay Road Energ
Hay Road Energy Center
2.2 TCR
- Eversource - S
Eversource - Schiller Station
2.2 TCR
What this shows Iatan Generating Station averages 2.2 TCR (186% of the Fossil Fuel Electric Power Generation BLS benchmark).
Iatan Generating Station TCR series: 2018=0 · 2019=3.5 · 2020=1 · 2021=2.2 · 2022=1.1 · 2023=4.5 · 2024=3.2 · BLS 1.2
Where Iatan Generating Station falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 31% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Missouri alone (the establishments it most directly competes with for workers and contracts): ranked #21 safest of 42 Fossil Fuel Electric Power Gen employers in Missouri.
Iatan Generating Station has more employees than the Fossil Fuel Electric Power Generation median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 3.2 | 1.9 | 5 | 0 | 0 |
| 2023 | 4.5 | 3.2 | 7 | 0 | 0 |
| 2022 | 1.1 | 0.0 | 2 | 0 | 0 |
| 2021 | 2.2 | 0.6 | 4 | 0 | 0 |
| 2020 | 1.0 | 1.0 | 2 | 0 | 0 |
| 2019 | 3.5 | 1.6 | 11 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · MO · Weston
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 10,075 rated employers in Missouri with headcount on file · 4 employers in Weston, MO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Milton R. Young Station | 2.2 TCR |
| NAICS-TCR | Basin Electric Power Cooperative - Leland Olds Station | 2.2 TCR |
| NAICS-TCR | Hay Road Energy Center | 2.2 TCR |
| NAICS-TCR | Eversource - Schiller Station | 2.2 TCR |
| STATE-SIZE | Staco Electric Construction CO | 200 FTE |
| STATE-SIZE | SIMMONS ANIMAL NUTRITION-DRY | 200 FTE |
| STATE-SIZE | Killark Electric | 200 FTE |
| STATE-SIZE | Fluid Connectors : Washington SPO206 | 200 FTE |
| CITY-NEAR | KCP&L - Iatan Generation Facility | 233 FTE |
| CITY-NEAR | McCormick Distilling Co., Inc. | 151 FTE |
| CITY-NEAR | Snow Creek | 65 FTE |
| NAT-TCR | Harbor Village at Harbor Shores LLC | 2.2 TCR |
| NAT-TCR | Earthscapes Unlimited, Inc. | 2.2 TCR |
| NAT-TCR | Montgomeryville | 2.2 TCR |
| NAT-TCR | Unmapped Brewing Co. LLC | 2.2 TCR |
| NAT-SIZE | ShopRite of Wallkill | 200 FTE |
| NAT-SIZE | Bigfoot Beverages Eugene | 200 FTE |
| NAT-SIZE | Maple Woods Manor | 200 FTE |
| NAT-SIZE | Caven - Ventura Center | 200 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.