Drywall contractors · California
J&K Drywall and Metal Stud Framing, Inc.
San Bernardino, CA · ~30 workers · 8 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 3.7
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
J&K Drywall and Metal Stud Framing, Inc. runs at 133% of its industry's injury rate - more dangerous than the typical Drywall contractors workplace, earning a grade D.
J&K Drywall and Metal Stud Framing, Inc.: 3.7 TCR = 133% of Drywall contractors BLS 2.8 · 8y Form 300A (see methodology below)
J&K Drywall and Metal Stud Framing, Inc. safety composite
J&K Drywall and Metal Stud Framing, Inc. scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 4%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
33/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 3.72 per 100 workers
Safer than 46% of industry peers
- DART rate
- F 12.18 per 100 workers
Safer than 4% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
J&K Drywall and Metal Stud Framing, Inc.: 0.0 → 12.2 TCR
Peak year 2024 @ 12.2 TCR · DART/TCR 3.27× in 2024
J&K Drywall and Metal Stud Framing, Inc.'s TCR rose 12.2 from 0.0 in 2017 to 12.2 in 2024. In 2024, DART was 3.27× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 238310 · San Bernardino, CA ABOVE-IND · SMALL
Grade D · TCR 3.7 · 133% of ind
- DART 12.2 DART
- RANK #117/228
- PHOTO Wall-Tech Inc.
- BOOK 8y book
- INJ 5 inj
- SIZE ~30 FTE
Nearest TCR peer: Wall-Tech Inc. (0.0 TCR gap)
Read with this employer → · Industry book → · California employers → · Look up another →
J&K Drywall and Metal Stud Framing, Inc. in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
J&K Drywall and Metal Stud Framing, Inc.
3.7 TCR
- Wall-Tech Inc.
Wall-Tech Inc.
3.7 TCR
- Robert A. Aird
Robert A. Aird, Inc.
3.7 TCR
- Construction
Construction
3.7 TCR
- CAN-AM CONTRAC
CAN-AM CONTRACTORS, INC
3.7 TCR
What this shows J&K Drywall and Metal Stud Framing, Inc. averages 3.7 TCR (133% of the Drywall contractors BLS benchmark).
J&K Drywall and Metal Stud Framing, Inc. TCR series: 2017=0 · 2018=0 · 2019=5.6 · 2020=5.8 · 2021=0 · 2022=0 · 2023=6.2 · 2024=12.2 · BLS 2.8
Where J&K Drywall and Metal Stud Framing, Inc. falls in its industry
1,613 Drywall contractors establishmentsSafer than 46% of graded establishments in this industry, whose median TCR is 3.4.
Narrower to California alone (the establishments it most directly competes with for workers and contracts): ranked #117 safest of 228 Drywall contractors employers in California.
J&K Drywall and Metal Stud Framing, Inc. has fewer employees than the Drywall contractors median and a higher injury rate than the industry's median TCR of 3.4. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 12.2 | 12.2 | 2 | 0 | 0 |
| 2023 | 6.2 | 6.2 | 1 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 5.8 | 5.8 | 1 | 0 | 0 |
| 2019 | 5.6 | 0.0 | 1 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238310 · CA · San Bernardino
1,613 Drywall contractors employers nationwide with a credible TCR · 51,834 rated employers in California with headcount on file · 332 employers in San Bernardino, CA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Wall-Tech Inc. | 3.7 TCR |
| NAICS-TCR | Robert A. Aird, Inc. | 3.7 TCR |
| NAICS-TCR | Construction | 3.7 TCR |
| NAICS-TCR | CAN-AM CONTRACTORS, INC | 3.7 TCR |
| STATE-SIZE | BZNUR | 30 FTE |
| STATE-SIZE | 1780 San Juan Rd. | 30 FTE |
| STATE-SIZE | Charter Oaks | 30 FTE |
| STATE-SIZE | Greenfields Turf, Inc. | 30 FTE |
| CITY-NEAR | Sheriff Department | 3,321 FTE |
| CITY-NEAR | North America Fulfillment Centers (FCs) : ONT2 | 2,856 FTE |
| CITY-NEAR | Transitional Assistance Department | 2,824 FTE |
| CITY-NEAR | Amazon Transportation Services : ONT5 | 2,475 FTE |
| NAT-TCR | At Home Stores #168 | 3.7 TCR |
| NAT-TCR | United Security Services Inc. - Nevada Office | 3.7 TCR |
| NAT-TCR | Redwall,LLC | 3.7 TCR |
| NAT-TCR | Milwaukee | 3.7 TCR |
| NAT-SIZE | Greenwell Chisholm Printing | 30 FTE |
| NAT-SIZE | Mediacom Ames, IA. | 30 FTE |
| NAT-SIZE | Rusken Packaging Inc. of Clarksville | 30 FTE |
| NAT-SIZE | Charleston Store #1902 | 30 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.