Pipeline construction on oil and gas field gathering lines to point of distribution on a contract basis · Colorado
Jomax Pipeline Construction
Platteville, CO · ~379 workers · 2 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.7
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Jomax Pipeline Construction runs at 23% of its industry's injury rate - far safer than the typical Pipeline construction on oil and gas field gathering lines to point of distribution on a contract basis workplace, earning a grade A.
Jomax Pipeline Construction: 0.7 TCR = 23% of Pipeline construction on oil and gas field gathering lines to point of distribution on a contract basis BLS 2.8 · 2y Form 300A (see methodology below)
Jomax Pipeline Construction safety composite
Jomax Pipeline Construction scores strongest on dart rate (safer than 70% of same-industry peers) and weakest on fatalities (safer than 52%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
59/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 0.65 per 100 workers
Safer than 53% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 70% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−0.6
2023→2024
Jomax Pipeline Construction injury rate improved
Jomax Pipeline Construction's TCR fell 0.6 from 1.0 in 2023 to 0.3 in 2024. Peak filing year was 2023 at 1.0 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2023=1.0 · 2024=0.3
OSHA ITA Form 300A scorecard
Establishment book 237120 · Platteville, CO AT/BELOW-IND · MID
Grade A · TCR 0.7 · 23% of ind
- DART 0.0 DART
- RANK #10/24
- PHOTO Performance Contract…
- BOOK 2y book
- INJ 7 inj
- SIZE ~379 FTE
Nearest TCR peer: Performance Contractors, Inc. - Cameron LNG-Hackberry (0.0 TCR gap)
Read with this employer → · Industry book → · Colorado employers → · Look up another →
Jomax Pipeline Construction in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Jomax Pipeline Construction
0.7 TCR
- Performance Co
Performance Contractors, Inc. - Cameron LNG-Hackberry
0.7 TCR
- Weldtech Servi
Weldtech Services, Inc.
0.7 TCR
- Midland, TX (P
Midland, TX (Plant 6)
0.7 TCR
- J. Irwin Compa
J. Irwin Company Ltd.
0.7 TCR
What this shows Jomax Pipeline Construction averages 0.7 TCR (23% of the Pipeline construction on oil and gas field gathering lines to point of distribution on a contract basis BLS benchmark).
Jomax Pipeline Construction TCR series: 2023=1 · 2024=0.3 · BLS 2.8
Where Jomax Pipeline Construction falls in its industry
809 Pipeline construction on oil a establishmentsSafer than 53% of graded establishments in this industry, whose median TCR is 0.7.
Narrower to Colorado alone (the establishments it most directly competes with for workers and contracts): ranked #10 safest of 24 Pipeline construction on oil a employers in Colorado.
Jomax Pipeline Construction has more employees than the Pipeline construction on oil and gas fie median and a lower injury rate than the industry's median TCR of 0.7. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.3 | 0.0 | 2 | 0 | 0 |
| 2023 | 1.0 | 0.4 | 5 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237120 · CO · Platteville
809 Pipeline construction on oil and gas field gathering lines to point of distribution on a contract basis employers nationwide with a credible TCR · 9,007 rated employers in Colorado with headcount on file · 16 employers in Platteville, CO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Performance Contractors, Inc. - Cameron LNG-Hackberry | 0.7 TCR |
| NAICS-TCR | Weldtech Services, Inc. | 0.7 TCR |
| NAICS-TCR | Midland, TX (Plant 6) | 0.7 TCR |
| NAICS-TCR | J. Irwin Company Ltd. | 0.7 TCR |
| STATE-SIZE | Viasat - Denver | 379 FTE |
| STATE-SIZE | WM 953 | 379 FTE |
| STATE-SIZE | WM 1896 | 379 FTE |
| STATE-SIZE | 1434 | 379 FTE |
| CITY-NEAR | Platteville Office | 410 FTE |
| CITY-NEAR | Advanced Oilfield Services LLC | 301 FTE |
| CITY-NEAR | Platteville Plant | 178 FTE |
| CITY-NEAR | Advanced Contracting Group, LLC | 119 FTE |
| NAT-TCR | Xtreme Powerline Construction Inc | 0.7 TCR |
| NAT-TCR | Midway Nursing Home | 0.7 TCR |
| NAT-TCR | Salem One -Kernersville | 0.7 TCR |
| NAT-TCR | Crowley Micrographics Inc | 0.7 TCR |
| NAT-SIZE | Rockwall Regional Hospital LLC | 379 FTE |
| NAT-SIZE | Allina Health Coon Rapids Clinic | 379 FTE |
| NAT-SIZE | Faurecia Automotive Seating | 379 FTE |
| NAT-SIZE | Lundberg Family Farms | 379 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.