Electric power generation, fossil fuel (e.g., coal, oil, gas) · Missouri
KCP&L - Hawthorn Generating Facility
Kansas City, MO · ~150 workers · 3 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 1.8
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
KCP&L - Hawthorn Generating Facility runs at 150% of its industry's injury rate - more dangerous than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade D.
KCP&L - Hawthorn Generating Facility: 1.8 TCR = 150% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 3y Form 300A (see methodology below)
KCP&L - Hawthorn Generating Facility safety composite
KCP&L - Hawthorn Generating Facility scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 21%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
36/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 1.8 per 100 workers
Safer than 40% of industry peers
- DART rate
- F 1.63 per 100 workers
Safer than 21% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
KCP&L - Hawthorn Generating Facility: 0.6 → 2.2 TCR
Peak year 2017 @ 2.6 TCR · DART/TCR 0.91× in 2018
KCP&L - Hawthorn Generating Facility's TCR rose 1.6 from 0.6 in 2016 to 2.2 in 2018. Peak filing year was 2017 at 2.6 TCR. In 2018, DART was 0.91× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221112 · Kansas City, MO ABOVE-IND · MID
Grade D · TCR 1.8 · 150% of ind
- DART 1.6 DART
- RANK #15/42
- PHOTO Quail Run Energy Par…
- BOOK 3y book
- INJ 9 inj
- SIZE ~150 FTE
Nearest TCR peer: Quail Run Energy Partners LP (0.0 TCR gap)
Read with this employer → · Industry book → · Missouri employers → · Look up another →
KCP&L - Hawthorn Generating Facility in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
KCP&L - Hawthorn Generating Facility
1.8 TCR
- Quail Run Ener
Quail Run Energy Partners LP
1.8 TCR
- Brunner Island
Brunner Island
1.8 TCR
- Big Sandy Plan
Big Sandy Plant
1.8 TCR
- KCP&L - Sibley
KCP&L - Sibley Generating Facility
1.8 TCR
What this shows KCP&L - Hawthorn Generating Facility averages 1.8 TCR (150% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
KCP&L - Hawthorn Generating Facility TCR series: 2016=0.6 · 2017=2.6 · 2018=2.2 · BLS 1.2
Where KCP&L - Hawthorn Generating Facility falls in its industry
846 Electric power generation, fos establishmentsSafer than 40% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Missouri alone (the establishments it most directly competes with for workers and contracts): ranked #15 safest of 42 Electric power generation, fos employers in Missouri.
KCP&L - Hawthorn Generating Facility has more employees than the Electric power generation, fossil fuel ( median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2018 | 2.2 | 1.6 | 4 | 0 | 0 |
| 2017 | 2.6 | 1.3 | 4 | 0 | 0 |
| 2016 | 0.6 | 0.6 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · MO · Kansas City
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 10,075 rated employers in Missouri with headcount on file · 1,023 employers in Kansas City, MO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Quail Run Energy Partners LP | 1.8 TCR |
| NAICS-TCR | Brunner Island | 1.8 TCR |
| NAICS-TCR | Big Sandy Plant | 1.8 TCR |
| NAICS-TCR | KCP&L - Sibley Generating Facility | 1.8 TCR |
| STATE-SIZE | Global Earthwork and Underground | 150 FTE |
| STATE-SIZE | BAM Contracting, LLC | 150 FTE |
| STATE-SIZE | Thomas Industrial Coatings & Thomas Equipment & Management | 150 FTE |
| STATE-SIZE | ACGI a Subsidary of Armstong World Industries | 150 FTE |
| CITY-NEAR | Mass Service Organization | 11,859 FTE |
| CITY-NEAR | Hallmark Cards Mass Channel | 11,578 FTE |
| CITY-NEAR | Global Merchandising Services (GMS) | 9,548 FTE |
| CITY-NEAR | Children's Mercy - Missouri | 7,709 FTE |
| NAT-TCR | Walter Scott, Jr. Energy Center | 1.8 TCR |
| NAT-TCR | Trinity ADC - Aerospace Ground Equipment (AGE) Eglin, Air Force Base (AFB) | 1.8 TCR |
| NAT-TCR | SPPAL Corporate | 1.8 TCR |
| NAT-TCR | Covington Container | 1.8 TCR |
| NAT-SIZE | HoneywellTX55 | 150 FTE |
| NAT-SIZE | 2573-MD027 | 150 FTE |
| NAT-SIZE | Missisquoi Mill | 150 FTE |
| NAT-SIZE | Provisur Technologies Whitewater | 150 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.