Lake Wales, FL · ~98 workers · 9 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 1.1
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Lake Wales Complex runs at 92% of its industry's injury rate - about level with the typical Electric Power Distribution workplace, earning a grade C.
Lake Wales Complex: 1.1 TCR = 92% of Electric Power Distribution BLS 1.2 · 9y Form 300A (see methodology below)
Lake Wales Complex safety composite
Lake Wales Complex scores strongest on total case rate (tcr) (safer than 80% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
72/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- B 1.1 per 100 workers
Safer than 80% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 79% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Lake Wales Complex held a steady TCR band
Lake Wales Complex's TCR held near 0.0 from 0.0 in 2016 to 0.0 in 2024. Peak filing year was 2022 at 6.9 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=0.0 · 2017=0.0 · 2018=1.9 · 2019=0.0 · 2020=0.0 · 2021=1.1 · 2022=6.9 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221122 · Lake Wales, FL AT/BELOW-IND · SMALL
Grade C · TCR 1.1 · 92% of ind
- DART 0.0 DART
- RANK #55/135
- PHOTO Versant Power Presqu…
- BOOK 9y book
- INJ 9 inj
- SIZE ~98 FTE
Nearest TCR peer: Versant Power Presque Isle Operations Center (0.0 TCR gap)
Read with this employer → · Industry book → · Florida employers → · Look up another →
Lake Wales Complex in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Lake Wales Complex
1.1 TCR
- Versant Power
Versant Power Presque Isle Operations Center
1.1 TCR
- Cholla Power P
Cholla Power Plant
1.1 TCR
- Sierra Vista C
Sierra Vista Construction Office
1.1 TCR
- Minneapolis SE
Minneapolis SE Storage
1.1 TCR
What this shows Lake Wales Complex averages 1.1 TCR (92% of the Electric Power Distribution BLS benchmark).
Lake Wales Complex TCR series: 2016=0 · 2017=0 · 2018=1.9 · 2019=0 · 2020=0 · 2021=1.1 · 2022=6.9 · 2023=0 · 2024=0 · BLS 1.2
Where Lake Wales Complex falls in its industry
2,958 Electric Power Distribution establishmentsSafer than 80% of graded establishments in this industry, whose median TCR is 2.5.
Narrower to Florida alone (the establishments it most directly competes with for workers and contracts): ranked #55 safest of 135 Electric Power Distribution employers in Florida.
Lake Wales Complex has more employees than the Electric Power Distribution median and a lower injury rate than the industry's median TCR of 2.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 6.9 | 1.1 | 6 | 0 | 0 |
| 2021 | 1.1 | 1.1 | 1 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 1.9 | 0.9 | 2 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221122 · FL · Lake Wales
2,958 Electric Power Distribution employers nationwide with a credible TCR · 26,569 rated employers in Florida with headcount on file · 66 employers in Lake Wales, FL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Versant Power Presque Isle Operations Center | 1.1 TCR |
| NAICS-TCR | Cholla Power Plant | 1.1 TCR |
| NAICS-TCR | Sierra Vista Construction Office | 1.1 TCR |
| NAICS-TCR | Minneapolis SE Storage | 1.1 TCR |
| STATE-SIZE | Trulieve Juniper Creek | 98 FTE |
| STATE-SIZE | WEST FLORIDA ELECTRIC COOPERATIVE | 98 FTE |
| STATE-SIZE | KB Home Jacksonville LLC | 98 FTE |
| STATE-SIZE | SEMCO Construction, Inc. | 98 FTE |
| CITY-NEAR | Oakley Transport | 821 FTE |
| CITY-NEAR | Florida's Natural Lake Wales | 640 FTE |
| CITY-NEAR | AdventHealth Lake Wales | 455 FTE |
| CITY-NEAR | WM 859 | 355 FTE |
| NAT-TCR | Bill L. Dover Company, Inc. | 1.1 TCR |
| NAT-TCR | Store 9645 - Cleveland Minne | 1.1 TCR |
| NAT-TCR | G-Iii Apparel Group, Ltd | 1.1 TCR |
| NAT-TCR | Pergan Marshall LLC | 1.1 TCR |
| NAT-SIZE | Las Ventanas De Socorro | 98 FTE |
| NAT-SIZE | Schneider Heating and Air Conditioning | 98 FTE |
| NAT-SIZE | Cape Warehouse Inc | 98 FTE |
| NAT-SIZE | Renaissance Park Multi Care Center | 98 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.