Commercial building construction general contractors · Colorado
MACC Projects PSFB
Peterson Sfb, CO · ~23 workers · 2 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 4.9
- Avg TCR
- 2.9
- Industry avg
- 0
- Fatalities
The verdict
MACC Projects PSFB runs at 168% of its industry's injury rate - more dangerous than the typical Commercial building construction general contractors workplace, earning a grade D.
MACC Projects PSFB: 4.9 TCR = 168% of Commercial building construction general contractors BLS 2.9 · 2y Form 300A (see methodology below)
MACC Projects PSFB safety composite
MACC Projects PSFB scores strongest on dart rate (safer than 73% of same-industry peers) and weakest on total case rate (tcr) (safer than 23%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
48/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 4.88 per 100 workers
Safer than 23% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 73% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−9.8
2022→2023
MACC Projects PSFB injury rate improved
MACC Projects PSFB's TCR fell 9.8 from 9.8 in 2022 to 0.0 in 2023. Peak filing year was 2022 at 9.8 TCR. In 2023, DART was 0× this establishment's average TCR (severity share of cases).
2022=9.8 · 2023=0.0
OSHA ITA Form 300A scorecard
Establishment book 236220 · Peterson Sfb, CO ABOVE-IND · SMALL
Grade D · TCR 4.9 · 168% of ind
- DART 0.0 DART
- RANK #117/148
- PHOTO RLM General Contract…
- BOOK 2y book
- INJ 2 inj
- SIZE ~23 FTE
Nearest TCR peer: RLM General Contractors (0.0 TCR gap)
Read with this employer → · Industry book → · Colorado employers → · Look up another →
MACC Projects PSFB in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
MACC Projects PSFB
4.9 TCR
- RLM General Co
RLM General Contractors
4.9 TCR
- Vortex Constru
Vortex Construction
4.9 TCR
- Service First
Service First
4.9 TCR
- Boyle Construc
Boyle Construction Inc.
4.9 TCR
What this shows MACC Projects PSFB averages 4.9 TCR (168% of the Commercial building construction general contractors BLS benchmark).
MACC Projects PSFB TCR series: 2022=9.8 · 2023=0 · BLS 2.9
Where MACC Projects PSFB falls in its industry
4,692 Commercial building constructi establishmentsSafer than 23% of graded establishments in this industry, whose median TCR is 2.3.
Narrower to Colorado alone (the establishments it most directly competes with for workers and contracts): ranked #117 safest of 148 Commercial building constructi employers in Colorado.
MACC Projects PSFB has fewer employees than the Commercial building construction general median and a higher injury rate than the industry's median TCR of 2.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 9.8 | 0.0 | 2 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
236220 · CO · Peterson Sfb
4,692 Commercial building construction general contractors employers nationwide with a credible TCR · 9,007 rated employers in Colorado with headcount on file · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | RLM General Contractors | 4.9 TCR |
| NAICS-TCR | Vortex Construction | 4.9 TCR |
| NAICS-TCR | Service First | 4.9 TCR |
| NAICS-TCR | Boyle Construction Inc. | 4.9 TCR |
| STATE-SIZE | CSS Farms, LLC Colorado City, CO | 23 FTE |
| STATE-SIZE | The Green Solution LLC | 23 FTE |
| STATE-SIZE | Franklin South | 23 FTE |
| STATE-SIZE | Greenfield Environmental Operations, LLC | 23 FTE |
| CITY-NEAR | Aleut Aerospace Engineering, LLC Primary IT & Cyber Related Data Systems (PICRD) | 72 FTE |
| NAT-TCR | Balcones Country Club | 4.9 TCR |
| NAT-TCR | EPSM - Cornelius | 4.9 TCR |
| NAT-TCR | Little Falls # 242 | 4.9 TCR |
| NAT-TCR | LVIP | 4.9 TCR |
| NAT-SIZE | Les Schwab Tire Center-Kalispell | 23 FTE |
| NAT-SIZE | Vcf 115 | 23 FTE |
| NAT-SIZE | East Haven Builders Supply - Newtown | 23 FTE |
| NAT-SIZE | Area Learning Center | 23 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.