Biomass electric power generation · Connecticut
Mira-Csws-Power Block Facility/Jet Turbine Facility
Hartford, CT · ~60 workers · 3 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 4.3
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Mira-Csws-Power Block Facility/Jet Turbine Facility runs at 358% of its industry's injury rate - far more dangerous than the typical Biomass electric power generation workplace, earning a grade F.
Mira-Csws-Power Block Facility/Jet Turbine Facility: 4.3 TCR = 358% of Biomass electric power generation BLS 1.2 · 3y Form 300A (see methodology below)
Mira-Csws-Power Block Facility/Jet Turbine Facility safety composite
Mira-Csws-Power Block Facility/Jet Turbine Facility scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on total case rate (tcr) (safer than 31%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
39/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 4.3 per 100 workers
Safer than 31% of industry peers
- DART rate
- D 0.93 per 100 workers
Safer than 40% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−0.7
2018→2020
Mira-Csws-Power Block Facility/Jet Turbine Facility injury rate improved
Mira-Csws-Power Block Facility/Jet Turbine Facility's TCR fell 0.7 from 2.5 in 2018 to 1.9 in 2020. Peak filing year was 2019 at 8.5 TCR. In 2020, DART was 0.22× this establishment's average TCR (severity share of cases).
2018=2.5 · 2019=8.5 · 2020=1.9
OSHA ITA Form 300A scorecard
Establishment book 221117 · Hartford, CT ABOVE-IND · SMALL
Grade F · TCR 4.3 · 358% of ind
- DART 0.9 DART
- RANK P31
- PHOTO Allendale Biomass LLC
- BOOK 3y book
- INJ 8 inj
- SIZE ~60 FTE
Nearest TCR peer: Allendale Biomass LLC (0.1 TCR gap)
Read with this employer → · Industry book → · Connecticut employers → · Look up another →
Mira-Csws-Power Block Facility/Jet Turbine Facility in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- TELOGIA POWER
TELOGIA POWER LLC
4.6 TCR
- Albany Green E
Albany Green Energy
4.5 TCR
- This site
Mira-Csws-Power Block Facility/Jet Turbine Facility
4.3 TCR
- Allendale Biom
Allendale Biomass LLC
4.2 TCR
- EDL Johnston
EDL Johnston
3.9 TCR
What this shows Mira-Csws-Power Block Facility/Jet Turbine Facility averages 4.3 TCR (358% of the Biomass electric power generation BLS benchmark).
Mira-Csws-Power Block Facility/Jet Turbine Facility TCR series: 2018=2.5 · 2019=8.5 · 2020=1.9 · BLS 1.2
Where Mira-Csws-Power Block Facility/Jet Turbine Facility falls in its industry
54 Biomass electric power generat establishmentsSafer than 31% of graded establishments in this industry, whose median TCR is 3.1.
Mira-Csws-Power Block Facility/Jet Turbine Facility has more employees than the Biomass electric power generation median and a higher injury rate than the industry's median TCR of 3.1. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2020 | 1.9 | 0.9 | 1 | 1 | 0 |
| 2019 | 8.5 | 3.4 | 4 | 1 | 0 |
| 2018 | 2.5 | 2.5 | 3 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221117 · CT · Hartford
54 Biomass electric power generation employers nationwide with a credible TCR · 7,008 rated employers in Connecticut with headcount on file · 270 employers in Hartford, CT · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Allendale Biomass LLC | 4.2 TCR |
| NAICS-TCR | Albany Green Energy | 4.5 TCR |
| NAICS-TCR | TELOGIA POWER LLC | 4.6 TCR |
| NAICS-TCR | EDL Johnston | 3.9 TCR |
| STATE-SIZE | Eversource - Railroad Hill Street | 60 FTE |
| STATE-SIZE | Public Works Department | 60 FTE |
| STATE-SIZE | 1100 | 60 FTE |
| STATE-SIZE | 6448_15040 | 60 FTE |
| CITY-NEAR | HARTFORD HOSPITAL | 7,842 FTE |
| CITY-NEAR | Saint Francis Hospital | 4,674 FTE |
| CITY-NEAR | LAZ Parking California, LLC | 4,117 FTE |
| CITY-NEAR | Hartford-Saint Francis Hospital | 3,165 FTE |
| NAT-TCR | Honeywell International, Inc. | 4.3 TCR |
| NAT-TCR | Half Moon Bay Lodge | 4.3 TCR |
| NAT-TCR | McNeely Pest Control | 4.3 TCR |
| NAT-TCR | ZT Distribution Milwaukee | 4.3 TCR |
| NAT-SIZE | DMB Packing - Newman | 60 FTE |
| NAT-SIZE | Premier Estates of Muscatine | 60 FTE |
| NAT-SIZE | Cabral Chrysler Jeep Dodge Ram Fiat | 60 FTE |
| NAT-SIZE | Owatonna Motor Company | 60 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.