Electrical generating and transmission equipment repair and maintenance services · Washington
Pacific Power Generation - Ridgefield
Ridgefield, WA · ~28 workers · 3 years of OSHA Injury Tracking Application data.
- B
- Good Safety Record
- 1.2
- Avg TCR
- 2.1
- Industry avg
- 0
- Fatalities
The verdict
Pacific Power Generation - Ridgefield runs at 57% of its industry's injury rate - safer than the typical Electrical generating and transmission equipment repair and maintenance services workplace, earning a grade B.
Pacific Power Generation - Ridgefield: 1.2 TCR = 57% of Electrical generating and transmission equipment repair and maintenance services BLS 2.1 · 3y Form 300A (see methodology below)
Pacific Power Generation - Ridgefield safety composite
Pacific Power Generation - Ridgefield scores strongest on total case rate (tcr) (safer than 82% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
72/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- B 1.19 per 100 workers
Safer than 82% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 76% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−3.6
2017→2019
Pacific Power Generation - Ridgefield injury rate improved
Pacific Power Generation - Ridgefield's TCR fell 3.6 from 3.6 in 2017 to 0.0 in 2019. Peak filing year was 2017 at 3.6 TCR. In 2019, DART was 0× this establishment's average TCR (severity share of cases).
2017=3.6 · 2018=0.0 · 2019=0.0
OSHA ITA Form 300A scorecard
Establishment book 811310 · Ridgefield, WA AT/BELOW-IND · SMALL
Grade B · TCR 1.2 · 57% of ind
- DART 0.0 DART
- RANK #5/37
- PHOTO Integrated Power Ser…
- BOOK 3y book
- INJ 1 inj
- SIZE ~28 FTE
Nearest TCR peer: Integrated Power Services Clifton Service Center (0.0 TCR gap)
Read with this employer → · Industry book → · Washington employers → · Look up another →
Pacific Power Generation - Ridgefield in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Pacific Power Generation - Ridgefield
1.2 TCR
- Integrated Pow
Integrated Power Services Clifton Service Center
1.2 TCR
- MMS - Manufact
MMS - Manufacturing Maintenance Solutions
1.2 TCR
- Scott Supply C
Scott Supply Co Inc
1.2 TCR
- GULF CRANE SER
GULF CRANE SERVICES DUSON
1.2 TCR
What this shows Pacific Power Generation - Ridgefield averages 1.2 TCR (57% of the Electrical generating and transmission equipment repair and maintenance services BLS benchmark).
Pacific Power Generation - Ridgefield TCR series: 2017=3.6 · 2018=0 · 2019=0 · BLS 2.1
Where Pacific Power Generation - Ridgefield falls in its industry
2,560 Electrical generating and tran establishmentsSafer than 82% of graded establishments in this industry, whose median TCR is 2.7.
Narrower to Washington alone (the establishments it most directly competes with for workers and contracts): ranked #5 safest of 37 Electrical generating and tran employers in Washington.
Pacific Power Generation - Ridgefield has fewer employees than the Electrical generating and transmission e median and a lower injury rate than the industry's median TCR of 2.7. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 3.6 | 3.6 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
811310 · WA · Ridgefield
2,560 Electrical generating and transmission equipment repair and maintenance services employers nationwide with a credible TCR · 10,147 rated employers in Washington with headcount on file · 45 employers in Ridgefield, WA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Integrated Power Services Clifton Service Center | 1.2 TCR |
| NAICS-TCR | MMS - Manufacturing Maintenance Solutions | 1.2 TCR |
| NAICS-TCR | Scott Supply Co Inc | 1.2 TCR |
| NAICS-TCR | GULF CRANE SERVICES DUSON | 1.2 TCR |
| STATE-SIZE | Wapatox | 28 FTE |
| STATE-SIZE | Canoe Ridge Estate Vineyards #12 | 28 FTE |
| STATE-SIZE | Long Ranch LLC | 28 FTE |
| STATE-SIZE | SS BAILEY NURSERIES INC | 28 FTE |
| CITY-NEAR | ilani resort casino | 1,058 FTE |
| CITY-NEAR | 53-046456260-3 | 474 FTE |
| CITY-NEAR | DC7 DC7 RIDGEFIELD WA | 419 FTE |
| CITY-NEAR | VMS Ridgefield | 324 FTE |
| NAT-TCR | KIT Zeller Rochester | 1.2 TCR |
| NAT-TCR | Ardagh Metal Beverage-Whitehouse | 1.2 TCR |
| NAT-TCR | 4054-Abs 0016 2997 | 1.2 TCR |
| NAT-TCR | SumCo Eco-Contracting, LLC | 1.2 TCR |
| NAT-SIZE | Tops 678 | 28 FTE |
| NAT-SIZE | Opengate, Inc./Day Habilitation Program | 28 FTE |
| NAT-SIZE | WIB Sedalia | 28 FTE |
| NAT-SIZE | Tops 669 | 28 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.