Highway construction · Oregon

PDA-Statewide Project and delivery

Salem, OR · ~130 workers · 2 years of OSHA Injury Tracking Application data.

B
Good Safety Record
1.5
Avg TCR
2.8
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

PDA-Statewide Project and delivery runs at 53% of its industry's injury rate - safer than the typical Highway construction workplace, earning a grade B.

PDA-Statewide Project and delivery: 1.5 TCR = 53% of Highway construction BLS 2.8 · 2y Form 300A (see methodology below)

PDA-Statewide Project and delivery safety composite

PDA-Statewide Project and delivery scores strongest on dart rate (safer than 81% of same-industry peers) and weakest on fatalities (safer than 53%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

C

72/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
B 1.49 per 100 workers

Safer than 75% of industry peers

DART rate
B 0 per 100 workers

Safer than 81% of industry peers

Fatalities
D 0

Safer than 53% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Rising injury rate

PDA-Statewide Project and delivery: 1.2 → 1.8 TCR

Peak year 2023 @ 1.8 TCR · DART/TCR 0× in 2023

PDA-Statewide Project and delivery's TCR rose 0.6 from 1.2 in 2022 to 1.8 in 2023. In 2023, DART was 0× this establishment's average TCR (severity share of cases).

OSHA ITA Form 300A scorecard

Establishment book 237310 · Salem, OR AT/BELOW-IND · MID

Grade B · TCR 1.5 · 53% of ind

  • DART 0.0 DART
  • RANK #22/135
  • PHOTO W S Newell & Sons Inc
  • BOOK 2y book
  • INJ 1 inj
  • SIZE ~130 FTE

Nearest TCR peer: W S Newell & Sons Inc (0.0 TCR gap)

Read with this employer → · Industry book → · Oregon employers → · Look up another →

PDA-Statewide Project and delivery in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows PDA-Statewide Project and delivery averages 1.5 TCR (53% of the Highway construction BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

PDA-Statewide Project and delivery TCR series: 2022=1.2 · 2023=1.8 · BLS 2.8

Where PDA-Statewide Project and delivery falls in its industry

4,078 Highway construction establishments

Safer than 75% of graded establishments in this industry, whose median TCR is 3.0.

More dangerous than peersSafer than peers

Narrower to Oregon alone (the establishments it most directly competes with for workers and contracts): ranked #22 safest of 135 Highway construction employers in Oregon.

PDA-Statewide Project and delivery (130 employees, TCR 1.5) among 29 same-industry peers, split at the industry median of 69 employees and a TCR of 3.0 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 01,0002,0003,000 0102030 Average employees Total Case Rate PDA-Statewide Project and delivery
PDA-Statewide Project and delivery (130 employees, TCR 1.5) among 29 same-industry peers, split at the industry median of 69 employees and a TCR of 3.0

PDA-Statewide Project and delivery has more employees than the Highway construction median and a lower injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2023 1.8 0.0 0 1 0
2022 1.2 1.2 1 1 0

OSHA ITA peer cross-reference

Establishment peer ledger

237310 · OR · Salem

4,078 Highway construction employers nationwide with a credible TCR · 8,031 rated employers in Oregon with headcount on file · 471 employers in Salem, OR · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR W S Newell & Sons Inc 1.5 TCR
NAICS-TCR Alakona Corp. 1.5 TCR
NAICS-TCR Advanced Workzone Services 1.5 TCR
NAICS-TCR Skanska USA Civil Inc. 1.5 TCR
STATE-SIZE OFI Manufacturing Plant 130 FTE
STATE-SIZE 7063 7063 - XEROX CORPORATION 130 FTE
STATE-SIZE 2807-2865 130 FTE
STATE-SIZE 2807-3057 130 FTE
CITY-NEAR Oregon State Hospital-Salem Campus 2,036 FTE
CITY-NEAR North America Fulfillment Centers (FCs) : PDX7 1,559 FTE
CITY-NEAR Chemeketa Community College 1,551 FTE
CITY-NEAR Human Service Building ODHS 1,402 FTE
NAT-TCR Rich Products Corp 1.5 TCR
NAT-TCR Big Lots Store #5410 Cincinnati, OH 1.5 TCR
NAT-TCR Camarillo Healthcare Center 1.5 TCR
NAT-TCR AIG Michigan 1.5 TCR
NAT-SIZE Enerco Group, Inc. 130 FTE
NAT-SIZE Mulch Manufacturing Callahan 130 FTE
NAT-SIZE S&P USA Ventilation Systems LLC 130 FTE
NAT-SIZE Langer Roofing & Sheet Metal Inc. 130 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2023, 2022. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.