Electric power distribution systems · Texas

PEC-Headquarters

Johnson City, TX · ~186 workers · 3 years of OSHA Injury Tracking Application data.

A
Excellent Safety Record
0.3
Avg TCR
1.2
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

PEC-Headquarters runs at 26% of its industry's injury rate - far safer than the typical Electric power distribution systems workplace, earning a grade A.

PEC-Headquarters: 0.3 TCR = 26% of Electric power distribution systems BLS 1.2 · 3y Form 300A (see methodology below)

PEC-Headquarters safety composite

PEC-Headquarters scores strongest on total case rate (tcr) (safer than 96% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

B

79/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
A 0.31 per 100 workers

Safer than 96% of industry peers

DART rate
B 0 per 100 workers

Safer than 79% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

TCR Δ

−0.9

2016→2018

PEC-Headquarters injury rate improved

PEC-Headquarters's TCR fell 0.9 from 0.9 in 2016 to 0.0 in 2018. Peak filing year was 2016 at 0.9 TCR. In 2018, DART was 0× this establishment's average TCR (severity share of cases).

2016=0.9 · 2017=0.1 · 2018=0.0

OSHA ITA Form 300A scorecard

Establishment book 221122 · Johnson City, TX AT/BELOW-IND · MID

Grade A · TCR 0.3 · 26% of ind

  • DART 0.0 DART
  • RANK #10/246
  • PHOTO Western Electricity …
  • BOOK 3y book
  • INJ 2 inj
  • SIZE ~186 FTE

Nearest TCR peer: Western Electricity Coordinating Council (0.0 TCR gap)

Read with this employer → · Industry book → · Texas employers → · Look up another →

PEC-Headquarters in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows PEC-Headquarters averages 0.3 TCR (26% of the Electric power distribution systems BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

PEC-Headquarters TCR series: 2016=0.9 · 2017=0.1 · 2018=0 · BLS 1.2

Where PEC-Headquarters falls in its industry

2,958 Electric power distribution sy establishments

Safer than 96% of graded establishments in this industry, whose median TCR is 2.5.

More dangerous than peersSafer than peers

Narrower to Texas alone (the establishments it most directly competes with for workers and contracts): ranked #10 safest of 246 Electric power distribution sy employers in Texas.

PEC-Headquarters (186 employees, TCR 0.3) among 29 same-industry peers, split at the industry median of 56 employees and a TCR of 2.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 05001,0001,5002,000 051015 Average employees Total Case Rate PEC-Headquarters
PEC-Headquarters (186 employees, TCR 0.3) among 29 same-industry peers, split at the industry median of 56 employees and a TCR of 2.5

PEC-Headquarters has more employees than the Electric power distribution systems median and a lower injury rate than the industry's median TCR of 2.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2018 0.0 0.0 0 0 0
2017 0.1 0.1 1 0 0
2016 0.9 0.9 1 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

221122 · TX · Johnson City

2,958 Electric power distribution systems employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 10 employers in Johnson City, TX · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR Western Electricity Coordinating Council 0.3 TCR
NAICS-TCR Hickory Operations Center 0.3 TCR
NAICS-TCR PSE&G NJ Utility Support 0.3 TCR
NAICS-TCR Enid Service Center 0.3 TCR
STATE-SIZE CHTEX of Texas, Inc. - Austin 186 FTE
STATE-SIZE Blanchette Field Services 186 FTE
STATE-SIZE Large Projects-Central Region 186 FTE
STATE-SIZE Lone Star Paving - Jung Road 186 FTE
CITY-NEAR Pedernales Electric Coop, Inc. 215 FTE
CITY-NEAR T&D Solutions, LLC - Johnson City 173 FTE
CITY-NEAR PEC-Johnson City 130 FTE
CITY-NEAR PEC-Johnson City Service Center 74 FTE
NAT-TCR Oak Ridge Associated Universities 0.3 TCR
NAT-TCR Miller Family Center 0.3 TCR
NAT-TCR R&D Center 0.3 TCR
NAT-TCR General Office Naperville 0.3 TCR
NAT-SIZE MNA - Wisconsin 186 FTE
NAT-SIZE IMG 186 FTE
NAT-SIZE Main 186 FTE
NAT-SIZE Penn Stainless Products, Inc. Quakertown 186 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2018, 2017, 2016. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.