Electric power transmission line and tower construction · North Carolina
Pike Telecom and Renewables Pennsylvania Statewide Operations
Mount Airy, NC · ~114 workers · 4 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.2
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Pike Telecom and Renewables Pennsylvania Statewide Operations runs at 8% of its industry's injury rate - far safer than the typical Electric power transmission line and tower construction workplace, earning a grade A.
Pike Telecom and Renewables Pennsylvania Statewide Operations: 0.2 TCR = 8% of Electric power transmission line and tower construction BLS 2.8 · 4y Form 300A (see methodology below)
Pike Telecom and Renewables Pennsylvania Statewide Operations safety composite
Pike Telecom and Renewables Pennsylvania Statewide Operations scores strongest on total case rate (tcr) (safer than 96% of same-industry peers) and weakest on fatalities (safer than 52%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
79/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0.21 per 100 workers
Safer than 96% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 78% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Pike Telecom and Renewables Pennsylvania Statewide Operations held a steady TCR band
Pike Telecom and Renewables Pennsylvania Statewide Operations's TCR held near 0.0 from 0.0 in 2020 to 0.0 in 2024. Peak filing year was 2022 at 0.8 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2020=0.0 · 2022=0.8 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 237130 · Mount Airy, NC AT/BELOW-IND · MID
Grade A · TCR 0.2 · 8% of ind
- DART 0.0 DART
- RANK #3/79
- PHOTO Haros Brothers, Co.
- BOOK 4y book
- INJ 1 inj
- SIZE ~114 FTE
Nearest TCR peer: Haros Brothers, Co. (0.0 TCR gap)
Read with this employer → · Industry book → · North Carolina employers → · Look up another →
Pike Telecom and Renewables Pennsylvania Statewide Operations in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site 0.2
Pike Telecom and Renewables Pennsylvania Statewide Operations
0.2 TCR
- Haros Brothers 0.2
Haros Brothers, Co.
0.2 TCR
- Red Dirt Const 0.2
Red Dirt Construction, LLC
0.2 TCR
- DEPCOM Power, 0.2
DEPCOM Power, Scottsdale
0.2 TCR
- American Tower 0.2
American Tower Corporation
0.2 TCR
What this shows Pike Telecom and Renewables Pennsylvania Statewide Operations averages 0.2 TCR (8% of the Electric power transmission line and tower construction BLS benchmark).
Pike Telecom and Renewables Pennsylvania Statewide Operations TCR series: 2020=0 · 2022=0.8 · 2023=0 · 2024=0 · BLS 2.8
Where Pike Telecom and Renewables Pennsylvania Statewide Operations falls in its industry
1,605 Electric power transmission li establishmentsSafer than 96% of graded establishments in this industry, whose median TCR is 2.0.
Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #3 safest of 79 Electric power transmission li employers in North Carolina.
Pike Telecom and Renewables Pennsylvania Statewide Operations has more employees than the Electric power transmission line and tow median and a lower injury rate than the industry's median TCR of 2.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.8 | 0.8 | 1 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237130 · NC · Mount Airy
1,605 Electric power transmission line and tower construction employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 94 employers in Mount Airy, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Haros Brothers, Co. | 0.2 TCR |
| NAICS-TCR | Red Dirt Construction, LLC | 0.2 TCR |
| NAICS-TCR | DEPCOM Power, Scottsdale | 0.2 TCR |
| NAICS-TCR | American Tower Corporation | 0.2 TCR |
| STATE-SIZE | Buy Sod USA, LLC | 114 FTE |
| STATE-SIZE | Cliffside Steam Station | 114 FTE |
| STATE-SIZE | Turner Asphalt LLC | 114 FTE |
| STATE-SIZE | Superior Mechanical Inc | 114 FTE |
| CITY-NEAR | Pike Florida Statewide Operations | 1,583 FTE |
| CITY-NEAR | Pike North Carolina Statewide Operations | 1,161 FTE |
| CITY-NEAR | Pike Georgia Statewide Operations | 969 FTE |
| CITY-NEAR | Pike Texas Statewide Operations | 738 FTE |
| NAT-TCR | 104286 - USACE ERB Security Strength | 0.2 TCR |
| NAT-TCR | National Distribution Centers LLC-1225 Internationale Pkwy | 0.2 TCR |
| NAT-TCR | Forcepoint LLC (Austin) | 0.2 TCR |
| NAT-TCR | CPAI Alpine FDS | 0.2 TCR |
| NAT-SIZE | Iconex, LLC Jefferson City | 114 FTE |
| NAT-SIZE | Colgate- Hamilton, NJ | 114 FTE |
| NAT-SIZE | Bertram Yachts LLC. | 114 FTE |
| NAT-SIZE | Store 0287 | 114 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →