Fossil Fuel Electric Power Generation · Alabama
Plant Central Alabama
Billingsley, AL · ~39 workers · 2 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 1.2
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Plant Central Alabama runs at 103% of its industry's injury rate - about level with the typical Fossil Fuel Electric Power Generation workplace, earning a grade C.
Plant Central Alabama: 1.2 TCR = 103% of Fossil Fuel Electric Power Generation BLS 1.2 · 2y Form 300A (see methodology below)
Plant Central Alabama safety composite
Plant Central Alabama scores strongest on total case rate (tcr) (safer than 57% of same-industry peers) and weakest on dart rate (safer than 13%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
40/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 1.24 per 100 workers
Safer than 57% of industry peers
- DART rate
- F 2.48 per 100 workers
Safer than 13% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Plant Central Alabama: 0.0 → 2.5 TCR
Peak year 2023 @ 2.5 TCR · DART/TCR 2× in 2023
Plant Central Alabama's TCR rose 2.5 from 0.0 in 2022 to 2.5 in 2023. In 2023, DART was 2× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221112 · Billingsley, AL ABOVE-IND · SMALL
Grade C · TCR 1.2 · 103% of ind
- DART 2.5 DART
- RANK #18/28
- PHOTO CPV Fairview LLC
- BOOK 2y book
- INJ 1 inj
- SIZE ~39 FTE
Nearest TCR peer: CPV Fairview LLC (0.0 TCR gap)
Read with this employer → · Industry book → · Alabama employers → · Look up another →
Plant Central Alabama in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Plant Central Alabama
1.2 TCR
- CPV Fairview L
CPV Fairview LLC
1.2 TCR
- Plant Central
Plant Central Alabama - APC
1.2 TCR
- 78A - Rush Isl
78A - Rush Island Energy Ctr Gen and Bud
1.2 TCR
- Waukegan Stati
Waukegan Station
1.2 TCR
What this shows Plant Central Alabama averages 1.2 TCR (103% of the Fossil Fuel Electric Power Generation BLS benchmark).
Plant Central Alabama TCR series: 2022=0 · 2023=2.5 · BLS 1.2
Where Plant Central Alabama falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 57% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Alabama alone (the establishments it most directly competes with for workers and contracts): ranked #18 safest of 28 Fossil Fuel Electric Power Gen employers in Alabama.
Plant Central Alabama has fewer employees than the Fossil Fuel Electric Power Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 2.5 | 2.5 | 1 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · AL · Billingsley
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 7,418 rated employers in Alabama with headcount on file · 5 employers in Billingsley, AL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | CPV Fairview LLC | 1.2 TCR |
| NAICS-TCR | Plant Central Alabama - APC | 1.2 TCR |
| NAICS-TCR | 78A - Rush Island Energy Ctr Gen and Bud | 1.2 TCR |
| NAICS-TCR | Waukegan Station | 1.2 TCR |
| STATE-SIZE | 8300 Hatchery Koch Foods of AL | 39 FTE |
| STATE-SIZE | Hillcrest - APC | 39 FTE |
| STATE-SIZE | Schillingers Road Crew Headquarters - APC | 39 FTE |
| STATE-SIZE | Eufaula State Docks Road Complex - APC | 39 FTE |
| CITY-NEAR | Alabama - East | 32 FTE |
| CITY-NEAR | Tenaska Lindsay Hill Generating Station | 26 FTE |
| CITY-NEAR | Tenaska Central Alabama Generating Station | 23 FTE |
| NAT-TCR | Coan Construction Co., Inc. | 1.2 TCR |
| NAT-TCR | LFT-ODFL | 1.2 TCR |
| NAT-TCR | Ames Linen Service | 1.2 TCR |
| NAT-TCR | Compco Management | 1.2 TCR |
| NAT-SIZE | John E. Quarles Co | 39 FTE |
| NAT-SIZE | Neshoba Feed Mill (MLO) | 39 FTE |
| NAT-SIZE | Snelling Nursery | 39 FTE |
| NAT-SIZE | SKF Solution Factory - Cleveland | 39 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.