Electric power generation, fossil fuel (e.g., coal, oil, gas) · Mississippi
Plant Moselle
Moselle, MS · ~65 workers · 9 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 3.8
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Plant Moselle runs at 319% of its industry's injury rate - far more dangerous than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade F.
Plant Moselle: 3.8 TCR = 319% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 9y Form 300A (see methodology below)
Plant Moselle safety composite
Plant Moselle scores strongest on dart rate (safer than 71% of same-industry peers) and weakest on total case rate (tcr) (safer than 12%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
42/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 3.83 per 100 workers
Safer than 12% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Plant Moselle held a steady TCR band
Plant Moselle's TCR held near 0.0 from 0.0 in 2016 to 0.0 in 2024. Peak filing year was 2020 at 17.4 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=0.0 · 2017=0.0 · 2018=0.0 · 2019=0.0 · 2020=17.4 · 2021=4.5 · 2022=7.9 · 2023=4.7 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Moselle, MS ABOVE-IND · SMALL
Grade F · TCR 3.8 · 319% of ind
- DART 0.0 DART
- RANK #14/16
- PHOTO Harrington Station-031
- BOOK 9y book
- INJ 1 inj
- SIZE ~65 FTE
Nearest TCR peer: Harrington Station-031 (0.0 TCR gap)
Read with this employer → · Industry book → · Mississippi employers → · Look up another →
Plant Moselle in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- CA-Big Creek 8
CA-Big Creek 8 PH
3.9 TCR
- Heorot Power M
Heorot Power Management - Hardin
3.9 TCR
- This site
Plant Moselle
3.8 TCR
- Harrington Sta
Harrington Station-031
3.8 TCR
- Worthington Pu
Worthington Public Utilities
3.8 TCR
What this shows Plant Moselle averages 3.8 TCR (319% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
Plant Moselle TCR series: 2016=0 · 2017=0 · 2018=0 · 2019=0 · 2020=17.4 · 2021=4.5 · 2022=7.9 · 2023=4.7 · 2024=0 · BLS 1.2
Where Plant Moselle falls in its industry
846 Electric power generation, fos establishmentsSafer than 12% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Mississippi alone (the establishments it most directly competes with for workers and contracts): ranked #14 safest of 16 Electric power generation, fos employers in Mississippi.
Plant Moselle has more employees than the Electric power generation, fossil fuel ( median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 4.7 | 0.0 | 1 | 2 | 0 |
| 2022 | 7.9 | 0.0 | 0 | 5 | 0 |
| 2021 | 4.5 | 0.0 | 0 | 3 | 0 |
| 2020 | 17.4 | 14.2 | 0 | 11 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · MS · Moselle
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 4,083 rated employers in Mississippi with headcount on file · 13 employers in Moselle, MS · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Harrington Station-031 | 3.8 TCR |
| NAICS-TCR | CA-Big Creek 8 PH | 3.9 TCR |
| NAICS-TCR | Heorot Power Management - Hardin | 3.9 TCR |
| NAICS-TCR | Worthington Public Utilities | 3.8 TCR |
| STATE-SIZE | Adcamp Inc. | 65 FTE |
| STATE-SIZE | Kerry-Vicksburg | 65 FTE |
| STATE-SIZE | VIP Cinema Plant 2 | 65 FTE |
| STATE-SIZE | NAPA Jackson Distribution Center | 65 FTE |
| CITY-NEAR | Southern Hens, Inc. KP | 359 FTE |
| CITY-NEAR | Kill Plant | 326 FTE |
| CITY-NEAR | Cook Plant | 270 FTE |
| CITY-NEAR | Southern Hens, Inc. SP | 242 FTE |
| NAT-TCR | Coastal Masonry, Inc. | 3.8 TCR |
| NAT-TCR | Twining, Inc. San Diego | 3.8 TCR |
| NAT-TCR | Steenberg Watrud Construction LLC | 3.8 TCR |
| NAT-TCR | JRL Ventures LLC - Sarasota | 3.8 TCR |
| NAT-SIZE | R+L Carriers - SHR | 65 FTE |
| NAT-SIZE | Jim Fisher Roofing & Construction, Inc. | 65 FTE |
| NAT-SIZE | Wise Electric Cooperative - Decatur | 65 FTE |
| NAT-SIZE | Payne Chevrolet Inc | 65 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.