Fossil Fuel Electric Power Generation · Virginia
Possum Pt Pw St
Dumfries, VA · ~65 workers · 4 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 1.4
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Possum Pt Pw St runs at 118% of its industry's injury rate - about level with the typical Fossil Fuel Electric Power Generation workplace, earning a grade C.
Possum Pt Pw St: 1.4 TCR = 118% of Fossil Fuel Electric Power Generation BLS 1.2 · 4y Form 300A (see methodology below)
Possum Pt Pw St safety composite
Possum Pt Pw St scores strongest on dart rate (safer than 71% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
58/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 1.41 per 100 workers
Safer than 52% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−3.7
2016→2024
Possum Pt Pw St injury rate improved
Possum Pt Pw St's TCR fell 3.7 from 3.7 in 2016 to 0.0 in 2024. Peak filing year was 2016 at 3.7 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=3.7 · 2022=2.0 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Dumfries, VA ABOVE-IND · SMALL
Grade C · TCR 1.4 · 118% of ind
- DART 0.0 DART
- RANK #11/17
- PHOTO Anclote Fossil Plant
- BOOK 4y book
- INJ 5 inj
- SIZE ~65 FTE
Nearest TCR peer: Anclote Fossil Plant (0.0 TCR gap)
Read with this employer → · Industry book → · Virginia employers → · Look up another →
Possum Pt Pw St in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Possum Pt Pw St
1.4 TCR
- Anclote Fossil
Anclote Fossil Plant
1.4 TCR
- Grand Tower En
Grand Tower Energy Center
1.4 TCR
- AMEREN MISSOUR
AMEREN MISSOURI - Rush Island Plant
1.4 TCR
- Plant Wansley
Plant Wansley
1.4 TCR
What this shows Possum Pt Pw St averages 1.4 TCR (118% of the Fossil Fuel Electric Power Generation BLS benchmark).
Possum Pt Pw St TCR series: 2016=3.7 · 2022=2 · 2023=0 · 2024=0 · BLS 1.2
Where Possum Pt Pw St falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 52% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Virginia alone (the establishments it most directly competes with for workers and contracts): ranked #11 safest of 17 Fossil Fuel Electric Power Gen employers in Virginia.
Possum Pt Pw St has more employees than the Fossil Fuel Electric Power Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 2.0 | 2.0 | 1 | 0 | 0 |
| 2016 | 3.7 | 1.8 | 4 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · VA · Dumfries
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 12,673 rated employers in Virginia with headcount on file · 24 employers in Dumfries, VA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Anclote Fossil Plant | 1.4 TCR |
| NAICS-TCR | Grand Tower Energy Center | 1.4 TCR |
| NAICS-TCR | AMEREN MISSOURI - Rush Island Plant | 1.4 TCR |
| NAICS-TCR | Plant Wansley | 1.4 TCR |
| STATE-SIZE | BLUE RIDGE | 65 FTE |
| STATE-SIZE | Public Works-Wastewater | 65 FTE |
| STATE-SIZE | Gilbane Building Company Richmond | 65 FTE |
| STATE-SIZE | Asturian Construction | 65 FTE |
| CITY-NEAR | 3588 | 404 FTE |
| CITY-NEAR | WM 3588 | 350 FTE |
| CITY-NEAR | 2017 - Dumfries | 188 FTE |
| CITY-NEAR | Community Concepts, Inc | 175 FTE |
| NAT-TCR | IDEX MPT Inc. - USA | 1.4 TCR |
| NAT-TCR | Keystone Clearwater Solutions | 1.4 TCR |
| NAT-TCR | Ocotillo Service Center | 1.4 TCR |
| NAT-TCR | REG Mason City, LLC | 1.4 TCR |
| NAT-SIZE | SinterMet, LLC | 65 FTE |
| NAT-SIZE | ABF Freight 100 | 65 FTE |
| NAT-SIZE | Oetiker Batavia | 65 FTE |
| NAT-SIZE | Rochester East Health Services | 65 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.