Highway construction · Oregon
Region 4-The Dalles
The Dallas, OR · ~41 workers · 2 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 5.3
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Region 4-The Dalles runs at 190% of its industry's injury rate - more dangerous than the typical Highway construction workplace, earning a grade D.
Region 4-The Dalles: 5.3 TCR = 190% of Highway construction BLS 2.8 · 2y Form 300A (see methodology below)
Region 4-The Dalles safety composite
Region 4-The Dalles scores strongest on fatalities (safer than 53% of same-industry peers) and weakest on dart rate (safer than 16%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
30/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 5.31 per 100 workers
Safer than 27% of industry peers
- DART rate
- F 4.67 per 100 workers
Safer than 16% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−1.3
2022→2023
Region 4-The Dalles injury rate improved
Region 4-The Dalles's TCR fell 1.3 from 6.0 in 2022 to 4.7 in 2023. Peak filing year was 2022 at 6.0 TCR. In 2023, DART was 0.88× this establishment's average TCR (severity share of cases).
2022=6.0 · 2023=4.7
OSHA ITA Form 300A scorecard
Establishment book 237310 · The Dallas, OR ABOVE-IND · SMALL
Grade D · TCR 5.3 · 190% of ind
- DART 4.7 DART
- RANK #70/135
- PHOTO Indigo Construction
- BOOK 2y book
- INJ 2 inj
- SIZE ~41 FTE
Nearest TCR peer: Indigo Construction (0.0 TCR gap)
Read with this employer → · Industry book → · Oregon employers → · Look up another →
Region 4-The Dalles in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Region 4-The Dalles
5.3 TCR
- Indigo Constru
Indigo Construction
5.3 TCR
- Fresno Concret
Fresno Concrete Construction Inc.
5.3 TCR
- Concrete 40
Concrete 40
5.3 TCR
- Public Works-R
Public Works-Road
5.3 TCR
What this shows Region 4-The Dalles averages 5.3 TCR (190% of the Highway construction BLS benchmark).
Region 4-The Dalles TCR series: 2022=6 · 2023=4.7 · BLS 2.8
Where Region 4-The Dalles falls in its industry
4,078 Highway construction establishmentsSafer than 27% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Oregon alone (the establishments it most directly competes with for workers and contracts): ranked #70 safest of 135 Highway construction employers in Oregon.
Region 4-The Dalles has fewer employees than the Highway construction median and a higher injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 4.7 | 4.7 | 1 | 0 | 0 |
| 2022 | 6.0 | 3.0 | 1 | 1 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · OR · The Dallas
4,078 Highway construction employers nationwide with a credible TCR · 8,031 rated employers in Oregon with headcount on file · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Indigo Construction | 5.3 TCR |
| NAICS-TCR | Fresno Concrete Construction Inc. | 5.3 TCR |
| NAICS-TCR | Concrete 40 | 5.3 TCR |
| NAICS-TCR | Public Works-Road | 5.3 TCR |
| STATE-SIZE | Schwope Brothers West Coast | 41 FTE |
| STATE-SIZE | JR Simplot Company-ZX Ranch | 41 FTE |
| STATE-SIZE | Logging | 41 FTE |
| STATE-SIZE | LBA Contract Cutting Inc | 41 FTE |
| NAT-TCR | ProWall | 5.3 TCR |
| NAT-TCR | Fresno Concrete Construction Inc. | 5.3 TCR |
| NAT-TCR | Kuehne + Nagel Inc. (RLOV-6408) | 5.3 TCR |
| NAT-TCR | Big Lots Store #1171 STOCKBRIDGE, GA | 5.3 TCR |
| NAT-SIZE | SD & S Trucking LLC | 41 FTE |
| NAT-SIZE | Shields | 41 FTE |
| NAT-SIZE | Keselowski Advanced Manufacturing | 41 FTE |
| NAT-SIZE | Houston TX - Pasket Ln | 41 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.