Electric power control · New Mexico
Rio Grande
Sunland Park, NM · ~54 workers · 4 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 3.2
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Rio Grande runs at 270% of its industry's injury rate - far more dangerous than the typical Electric power control workplace, earning a grade F.
Rio Grande: 3.2 TCR = 270% of Electric power control BLS 1.2 · 4y Form 300A (see methodology below)
Rio Grande safety composite
Rio Grande scores strongest on fatalities (safer than 52% of same-industry peers) and weakest on total case rate (tcr) (safer than 29%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
36/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 3.24 per 100 workers
Safer than 29% of industry peers
- DART rate
- F 1.82 per 100 workers
Safer than 33% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rio Grande held a steady TCR band
Rio Grande's TCR held near 0.1 from 1.9 in 2016 to 1.8 in 2019. Peak filing year was 2017 at 5.7 TCR. In 2019, DART was 0.56× this establishment's average TCR (severity share of cases).
2016=1.9 · 2017=5.7 · 2018=3.6 · 2019=1.8
OSHA ITA Form 300A scorecard
Establishment book 221121 · Sunland Park, NM ABOVE-IND · SMALL
Grade F · TCR 3.2 · 270% of ind
- DART 1.8 DART
- RANK #4/5
- PHOTO CA-Rancho Vista Sub …
- BOOK 4y book
- INJ 7 inj
- SIZE ~54 FTE
Nearest TCR peer: CA-Rancho Vista Sub Station (0.0 TCR gap)
Read with this employer → · Industry book → · New Mexico employers → · Look up another →
Rio Grande in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- CA-Rancho Vist
CA-Rancho Vista Sub Station
3.3 TCR
- CA-Metro West
CA-Metro West Transmission
3.3 TCR
- CA-Antelope Va
CA-Antelope Valley S/C
3.3 TCR
- This site
Rio Grande
3.2 TCR
- CA-Rector Subs
CA-Rector Substation
3.2 TCR
What this shows Rio Grande averages 3.2 TCR (270% of the Electric power control BLS benchmark).
Rio Grande TCR series: 2016=1.9 · 2017=5.7 · 2018=3.6 · 2019=1.8 · BLS 1.2
Where Rio Grande falls in its industry
263 Electric power control establishmentsSafer than 29% of graded establishments in this industry, whose median TCR is 2.2.
Narrower to New Mexico alone (the establishments it most directly competes with for workers and contracts): ranked #4 safest of 5 Electric power control employers in New Mexico.
Rio Grande has fewer employees than the Electric power control median and a higher injury rate than the industry's median TCR of 2.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2019 | 1.8 | 1.8 | 1 | 0 | 0 |
| 2018 | 3.6 | 3.6 | 2 | 0 | 0 |
| 2017 | 5.7 | 5.7 | 3 | 0 | 0 |
| 2016 | 1.9 | 1.9 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221121 · NM · Sunland Park
263 Electric power control employers nationwide with a credible TCR · 2,241 rated employers in New Mexico with headcount on file · 6 employers in Sunland Park, NM · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | CA-Rancho Vista Sub Station | 3.3 TCR |
| NAICS-TCR | CA-Metro West Transmission | 3.3 TCR |
| NAICS-TCR | CA-Rector Substation | 3.2 TCR |
| NAICS-TCR | CA-Antelope Valley S/C | 3.3 TCR |
| STATE-SIZE | Walther Farms NM | 54 FTE |
| STATE-SIZE | SDV Main Office | 54 FTE |
| STATE-SIZE | Bradbury Stamm Concrete LLC | 54 FTE |
| STATE-SIZE | Denver City, Texas | 54 FTE |
| CITY-NEAR | C&E Industrial Services Inc. | 70 FTE |
| CITY-NEAR | RIO GRANDE POWER PLANT | 41 FTE |
| CITY-NEAR | SPD | 34 FTE |
| CITY-NEAR | New Era Spray Foam | 25 FTE |
| NAT-TCR | Wendy's Store #190 | 3.2 TCR |
| NAT-TCR | Tri-City Distributors, LP | 3.2 TCR |
| NAT-TCR | 6962-Swy 0025 2697 | 3.2 TCR |
| NAT-TCR | AMEREN MISSOURI - MO Northeast Gas | 3.2 TCR |
| NAT-SIZE | DV Trucking | 54 FTE |
| NAT-SIZE | Daniel Jonathan Stowe Conservancy (Daniel Stowe Botanical Garden) | 54 FTE |
| NAT-SIZE | STL - Provisioning | 54 FTE |
| NAT-SIZE | Decatur Bodine | 54 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.