Structural steel erecting or iron work contractors · Texas
Riverbend Crane & Rigging
El Paso, TX · ~36 workers · 8 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 11.8
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Riverbend Crane & Rigging runs at 420% of its industry's injury rate - far more dangerous than the typical Structural steel erecting or iron work contractors workplace, earning a grade F.
Riverbend Crane & Rigging: 11.8 TCR = 420% of Structural steel erecting or iron work contractors BLS 2.8 · 8y Form 300A (see methodology below)
Riverbend Crane & Rigging safety composite
Riverbend Crane & Rigging scores strongest on fatalities (safer than 53% of same-industry peers) and weakest on dart rate (safer than 5%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
19/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 11.76 per 100 workers
Safer than 9% of industry peers
- DART rate
- F 11.1 per 100 workers
Safer than 5% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−15.3
2016→2024
Riverbend Crane & Rigging injury rate improved
Riverbend Crane & Rigging's TCR fell 15.3 from 26.4 in 2016 to 11.1 in 2024. Peak filing year was 2016 at 26.4 TCR. In 2024, DART was 0.94× this establishment's average TCR (severity share of cases).
2016=26.4 · 2017=12.0 · 2018=0.0 · 2019=4.6 · 2021=10.3 · 2022=15.8 · 2023=13.8 · 2024=11.1
OSHA ITA Form 300A scorecard
Establishment book 238120 · El Paso, TX ABOVE-IND · SMALL
Grade F · TCR 11.8 · 420% of ind
- DART 11.1 DART
- RANK #65/66
- PHOTO The Erection Company
- BOOK 8y book
- INJ 34 inj
- SIZE ~36 FTE
Nearest TCR peer: The Erection Company (0.0 TCR gap)
Read with this employer → · Industry book → · Texas employers → · Look up another →
Riverbend Crane & Rigging in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Riverbend Crane & Rigging
11.8 TCR
- The Erection C
The Erection Company
11.8 TCR
- Walker Rebar I
Walker Rebar Inc
11.8 TCR
- American Ironw
American Ironworks & Erectors, Inc.
11.7 TCR
- STEELTECH REIN
STEELTECH REINFORCING, INC.
11.7 TCR
What this shows Riverbend Crane & Rigging averages 11.8 TCR (420% of the Structural steel erecting or iron work contractors BLS benchmark).
Riverbend Crane & Rigging TCR series: 2016=26.4 · 2017=12 · 2018=0 · 2019=4.6 · 2021=10.3 · 2022=15.8 · 2023=13.8 · 2024=11.1 · BLS 2.8
Where Riverbend Crane & Rigging falls in its industry
705 Structural steel erecting or i establishmentsSafer than 9% of graded establishments in this industry, whose median TCR is 3.9.
Narrower to Texas alone (the establishments it most directly competes with for workers and contracts): ranked #65 safest of 66 Structural steel erecting or i employers in Texas.
Riverbend Crane & Rigging has fewer employees than the Structural steel erecting or iron work c median and a higher injury rate than the industry's median TCR of 3.9. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 11.1 | 11.1 | 3 | 0 | 0 |
| 2023 | 13.8 | 10.4 | 4 | 0 | 0 |
| 2022 | 15.8 | 9.9 | 8 | 0 | 0 |
| 2021 | 10.3 | 7.7 | 4 | 0 | 0 |
| 2019 | 4.6 | 2.3 | 2 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 12.0 | 12.0 | 4 | 0 | 0 |
| 2016 | 26.4 | 20.5 | 9 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238120 · TX · El Paso
705 Structural steel erecting or iron work contractors employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 974 employers in El Paso, TX · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | The Erection Company | 11.8 TCR |
| NAICS-TCR | Walker Rebar Inc | 11.8 TCR |
| NAICS-TCR | American Ironworks & Erectors, Inc. | 11.7 TCR |
| NAICS-TCR | STEELTECH REINFORCING, INC. | 11.7 TCR |
| STATE-SIZE | FRONTIER FEED YARD | 36 FTE |
| STATE-SIZE | Paco Feedyard | 36 FTE |
| STATE-SIZE | Coyote Lake Feedyard Inc. | 36 FTE |
| STATE-SIZE | Unlimited Contract Services Waelder | 36 FTE |
| CITY-NEAR | U.S. Border Patrol Sector - El Paso | 2,330 FTE |
| CITY-NEAR | Alegre Home Health Care, LLC EL PASO | 1,942 FTE |
| CITY-NEAR | Office of Field Operations - El Paso | 1,847 FTE |
| CITY-NEAR | MVT Services, LLC | 1,798 FTE |
| NAT-TCR | CMC of Georgia, Inc | 11.8 TCR |
| NAT-TCR | 1116 - NSM Slabtown | 11.8 TCR |
| NAT-TCR | California Designers Choice Custom Cabinetry | 11.8 TCR |
| NAT-TCR | Alsco Geyer Irrigation, Inc. | 11.8 TCR |
| NAT-SIZE | Main Office | 36 FTE |
| NAT-SIZE | MillTown - Neenah WI | 36 FTE |
| NAT-SIZE | Office | 36 FTE |
| NAT-SIZE | G.A. Peak Excavating, Inc. | 36 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.