Pavement, highway, road, street, bridge or airport runway, construction · Washington
SATOC Road Repairs, Joint Base Lewis-McChord
Joint Base Lewis-Mcchord, WA · ~28 workers · 2 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 4.8
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
SATOC Road Repairs, Joint Base Lewis-McChord runs at 173% of its industry's injury rate - more dangerous than the typical Pavement, highway, road, street, bridge or airport runway, construction workplace, earning a grade D.
SATOC Road Repairs, Joint Base Lewis-McChord: 4.8 TCR = 173% of Pavement, highway, road, street, bridge or airport runway, construction BLS 2.8 · 2y Form 300A (see methodology below)
SATOC Road Repairs, Joint Base Lewis-McChord safety composite
SATOC Road Repairs, Joint Base Lewis-McChord scores strongest on fatalities (safer than 53% of same-industry peers) and weakest on dart rate (safer than 15%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
31/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 4.84 per 100 workers
Safer than 30% of industry peers
- DART rate
- F 5 per 100 workers
Safer than 15% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
SATOC Road Repairs, Joint Base Lewis-McChord held a steady TCR band
SATOC Road Repairs, Joint Base Lewis-McChord's TCR held near 0.3 from 4.7 in 2016 to 5.0 in 2017. In 2017, DART was 1.03× this establishment's average TCR (severity share of cases).
2016=4.7 · 2017=5.0
OSHA ITA Form 300A scorecard
Establishment book 237310 · Joint Base Lewis-Mcchord, WA ABOVE-IND · SMALL
Grade D · TCR 4.8 · 173% of ind
- DART 5.0 DART
- RANK #47/81
- PHOTO Bush Engineering, Inc.
- BOOK 2y book
- INJ 2 inj
- SIZE ~28 FTE
Nearest TCR peer: Bush Engineering, Inc. (0.0 TCR gap)
Read with this employer → · Industry book → · Washington employers → · Look up another →
SATOC Road Repairs, Joint Base Lewis-McChord in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
SATOC Road Repairs, Joint Base Lewis-McChord
4.8 TCR
- Bush Engineeri
Bush Engineering, Inc.
4.8 TCR
- Shamrock Traff
Shamrock Traffic
4.8 TCR
- Lanford Brothe
Lanford Brothers Company Inc.
4.8 TCR
- Heim Construct
Heim Construction Co., Inc.
4.8 TCR
What this shows SATOC Road Repairs, Joint Base Lewis-McChord averages 4.8 TCR (173% of the Pavement, highway, road, street, bridge or airport runway, construction BLS benchmark).
SATOC Road Repairs, Joint Base Lewis-McChord TCR series: 2016=4.7 · 2017=5 · BLS 2.8
Where SATOC Road Repairs, Joint Base Lewis-McChord falls in its industry
4,078 Pavement, highway, road, stree establishmentsSafer than 30% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Washington alone (the establishments it most directly competes with for workers and contracts): ranked #47 safest of 81 Pavement, highway, road, stree employers in Washington.
SATOC Road Repairs, Joint Base Lewis-McChord has fewer employees than the Pavement, highway, road, street, bridge median and a higher injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2017 | 5.0 | 5.0 | 1 | 0 | 0 |
| 2016 | 4.7 | 0.0 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · WA · Joint Base Lewis-Mcchord
4,078 Pavement, highway, road, street, bridge or airport runway, construction employers nationwide with a credible TCR · 10,147 rated employers in Washington with headcount on file · 3 employers in Joint Base Lewis-Mcchord, WA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Bush Engineering, Inc. | 4.8 TCR |
| NAICS-TCR | Shamrock Traffic | 4.8 TCR |
| NAICS-TCR | Lanford Brothers Company Inc. | 4.8 TCR |
| NAICS-TCR | Heim Construction Co., Inc. | 4.8 TCR |
| STATE-SIZE | Wapatox | 28 FTE |
| STATE-SIZE | Canoe Ridge Estate Vineyards #12 | 28 FTE |
| STATE-SIZE | Long Ranch LLC | 28 FTE |
| STATE-SIZE | SS BAILEY NURSERIES INC | 28 FTE |
| CITY-NEAR | WA026 | 81 FTE |
| CITY-NEAR | IHG Army Hotels - Joint Base Lewis-McChord (Holiday Inn Express/Army Lodging) | 79 FTE |
| NAT-TCR | Legends - BB&T Pavilion | 4.8 TCR |
| NAT-TCR | NAPP Westminster | 4.8 TCR |
| NAT-TCR | Fulton (Msful) | 4.8 TCR |
| NAT-TCR | Mattoon (Ilmat) | 4.8 TCR |
| NAT-SIZE | Arizona Production Center | 28 FTE |
| NAT-SIZE | 0773 - Enterprise, Al | 28 FTE |
| NAT-SIZE | 0445 - Murrieta, Ca | 28 FTE |
| NAT-SIZE | 0196 - Albany, Ny | 28 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.