Utility line (i.e., communication, electric power), construction · Missouri

Sellenriek Energy Kingdom City

Kingdom City, MO · ~46 workers · 2 years of OSHA Injury Tracking Application data.

F
Failing Safety Record
20.1
Avg TCR
2.8
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Sellenriek Energy Kingdom City runs at 718% of its industry's injury rate - far more dangerous than the typical Utility line (i.e., communication, electric power), construction workplace, earning a grade F.

Sellenriek Energy Kingdom City: 20.1 TCR = 718% of Utility line (i.e., communication, electric power), construction BLS 2.8 · 2y Form 300A (see methodology below)

Sellenriek Energy Kingdom City safety composite

Sellenriek Energy Kingdom City scores strongest on fatalities (safer than 52% of same-industry peers) and weakest on total case rate (tcr) (safer than 0%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

F

22/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
F 20.09 per 100 workers

Safer than 0% of industry peers

DART rate
F 2.34 per 100 workers

Safer than 26% of industry peers

Fatalities
D 0

Safer than 52% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

TCR Δ

−26.1

2023→2024

Sellenriek Energy Kingdom City injury rate improved

Sellenriek Energy Kingdom City's TCR fell 26.1 from 33.2 in 2023 to 7.0 in 2024. Peak filing year was 2023 at 33.2 TCR. In 2024, DART was 0.12× this establishment's average TCR (severity share of cases).

2023=33.2 · 2024=7.0

OSHA ITA Form 300A scorecard

Establishment book 237130 · Kingdom City, MO ABOVE-IND · SMALL

Grade F · TCR 20.1 · 718% of ind

  • DART 2.3 DART
  • RANK #28/28
  • PHOTO John Griffin Constru…
  • BOOK 2y book
  • INJ 9 inj
  • SIZE ~46 FTE

Nearest TCR peer: John Griffin Construction, Inc, (0.3 TCR gap)

Read with this employer → · Industry book → · Missouri employers → · Look up another →

Sellenriek Energy Kingdom City in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Sellenriek Energy Kingdom City averages 20.1 TCR (718% of the Utility line (i.e., communication, electric power), construction BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Sellenriek Energy Kingdom City TCR series: 2023=33.2 · 2024=7 · BLS 2.8

Where Sellenriek Energy Kingdom City falls in its industry

1,605 Utility line (i.e., communicat establishments

Safer than 0% of graded establishments in this industry, whose median TCR is 2.0.

More dangerous than peersSafer than peers

Narrower to Missouri alone (the establishments it most directly competes with for workers and contracts): ranked #28 safest of 28 Utility line (i.e., communicat employers in Missouri.

Sellenriek Energy Kingdom City (46 employees, TCR 20.1) among 29 same-industry peers, split at the industry median of 74 employees and a TCR of 2.0 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 0510152025 Average employees Total Case Rate Sellenriek Energy Kingdom City
Sellenriek Energy Kingdom City (46 employees, TCR 20.1) among 29 same-industry peers, split at the industry median of 74 employees and a TCR of 2.0

Sellenriek Energy Kingdom City has fewer employees than the Utility line (i.e., communication, elect median and a higher injury rate than the industry's median TCR of 2.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 7.0 2.3 3 0 0
2023 33.2 22.1 6 3 0

OSHA ITA peer cross-reference

Establishment peer ledger

237130 · MO · Kingdom City

1,605 Utility line (i.e., communication, electric power), construction employers nationwide with a credible TCR · 10,075 rated employers in Missouri with headcount on file · 5 employers in Kingdom City, MO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR John Griffin Construction, Inc, 19.8 TCR
NAICS-TCR Headquarters 19.1 TCR
NAICS-TCR Perham, MN (AEIS) 18.8 TCR
NAICS-TCR SOUTHERN INSTALLATIONS, INC. 18.7 TCR
STATE-SIZE Marshall, MO-PS 46 FTE
STATE-SIZE AMEREN MISSOURI - System Relay Services 46 FTE
STATE-SIZE Three Rivers Electric Cooperative - Linn 46 FTE
STATE-SIZE JIS at ExxonMobil Billings 46 FTE
CITY-NEAR 318 Petro Kingdom City 112 FTE
CITY-NEAR Callaway Carriers Inc. 41 FTE
CITY-NEAR Christensen Construction Co., Inc. 33 FTE
CITY-NEAR Utilisource Kingdom City 22 FTE
NAT-TCR Sayre Personal Care Residence 20.1 TCR
NAT-TCR Police Station 20.1 TCR
NAT-TCR Suffield by the River 20.1 TCR
NAT-TCR Grand Traverse Assembly 20.1 TCR
NAT-SIZE Curry House 46 FTE
NAT-SIZE Flint Hills Area Transportation Agency 46 FTE
NAT-SIZE STR0253 46 FTE
NAT-SIZE STR0683 46 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2023. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.