Pavement, highway, road, street, bridge or airport runway, construction · Kansas
Smoky Hill Construction Concrete Paving
Salina, KS · ~69 workers · 5 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 10.6
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Smoky Hill Construction Concrete Paving runs at 377% of its industry's injury rate - far more dangerous than the typical Pavement, highway, road, street, bridge or airport runway, construction workplace, earning a grade F.
Smoky Hill Construction Concrete Paving: 10.6 TCR = 377% of Pavement, highway, road, street, bridge or airport runway, construction BLS 2.8 · 5y Form 300A (see methodology below)
Smoky Hill Construction Concrete Paving safety composite
Smoky Hill Construction Concrete Paving scores strongest on fatalities (safer than 53% of same-industry peers) and weakest on dart rate (safer than 3%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
18/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 10.56 per 100 workers
Safer than 8% of industry peers
- DART rate
- F 12.36 per 100 workers
Safer than 3% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Smoky Hill Construction Concrete Paving: 10.8 → 13.9 TCR
Peak year 2019 @ 16.1 TCR · DART/TCR 1.17× in 2022
Smoky Hill Construction Concrete Paving's TCR rose 3.1 from 10.8 in 2016 to 13.9 in 2022. Peak filing year was 2019 at 16.1 TCR. In 2022, DART was 1.17× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 237310 · Salina, KS ABOVE-IND · SMALL
Grade F · TCR 10.6 · 377% of ind
- DART 12.4 DART
- RANK #47/49
- PHOTO NS Bridge SR 361 Por…
- BOOK 5y book
- INJ 38 inj
- SIZE ~69 FTE
Nearest TCR peer: NS Bridge SR 361 Portageville (0.0 TCR gap)
Read with this employer → · Industry book → · Kansas employers → · Look up another →
Smoky Hill Construction Concrete Paving in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Smoky Hill Construction Concrete Paving
10.6 TCR
- NS Bridge SR 3
NS Bridge SR 361 Portageville
10.6 TCR
- Road Maintenan
Road Maintenance
10.6 TCR
- C-TECH CORPORA
C-TECH CORPORATION, INC.
10.5 TCR
- D6 Quincy Yard
D6 Quincy Yard
10.5 TCR
What this shows Smoky Hill Construction Concrete Paving averages 10.6 TCR (377% of the Pavement, highway, road, street, bridge or airport runway, construction BLS benchmark).
Smoky Hill Construction Concrete Paving TCR series: 2016=10.8 · 2017=3.6 · 2018=8.4 · 2019=16.1 · 2022=13.9 · BLS 2.8
Where Smoky Hill Construction Concrete Paving falls in its industry
4,078 Pavement, highway, road, stree establishmentsSafer than 8% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Kansas alone (the establishments it most directly competes with for workers and contracts): ranked #47 safest of 49 Pavement, highway, road, stree employers in Kansas.
Smoky Hill Construction Concrete Paving has more employees than the Pavement, highway, road, street, bridge median and a higher injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2022 | 13.9 | 12.4 | 8 | 1 | 0 |
| 2019 | 16.1 | 13.4 | 12 | 0 | 0 |
| 2018 | 8.4 | 7.0 | 6 | 0 | 0 |
| 2017 | 3.6 | 3.6 | 3 | 0 | 0 |
| 2016 | 10.8 | 6.0 | 9 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · KS · Salina
4,078 Pavement, highway, road, street, bridge or airport runway, construction employers nationwide with a credible TCR · 5,228 rated employers in Kansas with headcount on file · 136 employers in Salina, KS · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | NS Bridge SR 361 Portageville | 10.6 TCR |
| NAICS-TCR | C-TECH CORPORATION, INC. | 10.5 TCR |
| NAICS-TCR | Road Maintenance | 10.6 TCR |
| NAICS-TCR | D6 Quincy Yard | 10.5 TCR |
| STATE-SIZE | Pioneer Electric Cooperative | 69 FTE |
| STATE-SIZE | Hi-Tech Interiors Inc | 69 FTE |
| STATE-SIZE | Buckley Roofing Company, Inc | 69 FTE |
| STATE-SIZE | MC, Inc. dba Gordon Energy & Drainage | 69 FTE |
| CITY-NEAR | SALINA REGIONAL HEALTH CENTER | 1,959 FTE |
| CITY-NEAR | Saint Francis Ministries | 1,426 FTE |
| CITY-NEAR | SALINA PLANT | 1,055 FTE |
| CITY-NEAR | SALINA PLANT - EAST | 1,006 FTE |
| NAT-TCR | McCoys Building Supply-Weslaco | 10.6 TCR |
| NAT-TCR | MicroMetl Corporation | 10.6 TCR |
| NAT-TCR | 4054-ABS-0017-0016-00961 | 10.6 TCR |
| NAT-TCR | 5472-NAI-0033-0033-01430 | 10.6 TCR |
| NAT-SIZE | Blanks Printing & Imaging, Inc. | 69 FTE |
| NAT-SIZE | Goodyear Service Center | 69 FTE |
| NAT-SIZE | Tidewater Transit-Fayetteville | 69 FTE |
| NAT-SIZE | CSW, Inc. | 69 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.