Furnace installation · Ohio
Stack Heating, Cooling and Electric
Avon, OH · ~43 workers · 2 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 5.7
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Stack Heating, Cooling and Electric runs at 205% of its industry's injury rate - far more dangerous than the typical Furnace installation workplace, earning a grade F.
Stack Heating, Cooling and Electric: 5.7 TCR = 205% of Furnace installation BLS 2.8 · 2y Form 300A (see methodology below)
Stack Heating, Cooling and Electric safety composite
Stack Heating, Cooling and Electric scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 21%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
32/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 5.73 per 100 workers
Safer than 29% of industry peers
- DART rate
- F 4.08 per 100 workers
Safer than 21% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Stack Heating, Cooling and Electric: 5.3 → 6.1 TCR
Peak year 2018 @ 6.1 TCR · DART/TCR 0.71× in 2018
Stack Heating, Cooling and Electric's TCR rose 0.8 from 5.3 in 2016 to 6.1 in 2018. In 2018, DART was 0.71× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 238220 · Avon, OH ABOVE-IND · SMALL
Grade F · TCR 5.7 · 205% of ind
- DART 4.1 DART
- RANK #254/300
- PHOTO Coolsys PDX
- BOOK 2y book
- INJ 5 inj
- SIZE ~43 FTE
Nearest TCR peer: Coolsys PDX (0.0 TCR gap)
Read with this employer → · Industry book → · Ohio employers → · Look up another →
Stack Heating, Cooling and Electric in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Stack Heating, Cooling and Electric
5.7 TCR
- Coolsys PDX
Coolsys PDX
5.7 TCR
- Quarter Moon P
Quarter Moon Plumbing, Inc.
5.7 TCR
- Phillips Plumb
Phillips Plumbing and Mechanical
5.7 TCR
- Dillett Mechan
Dillett Mechanical Service, Inc.
5.7 TCR
What this shows Stack Heating, Cooling and Electric averages 5.7 TCR (205% of the Furnace installation BLS benchmark).
Stack Heating, Cooling and Electric TCR series: 2016=5.3 · 2018=6.1 · BLS 2.8
Where Stack Heating, Cooling and Electric falls in its industry
5,793 Furnace installation establishmentsSafer than 29% of graded establishments in this industry, whose median TCR is 3.3.
Narrower to Ohio alone (the establishments it most directly competes with for workers and contracts): ranked #254 safest of 300 Furnace installation employers in Ohio.
Stack Heating, Cooling and Electric has fewer employees than the Furnace installation median and a higher injury rate than the industry's median TCR of 3.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2018 | 6.1 | 4.1 | 3 | 0 | 0 |
| 2016 | 5.3 | 5.3 | 2 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238220 · OH · Avon
5,793 Furnace installation employers nationwide with a credible TCR · 22,650 rated employers in Ohio with headcount on file · 83 employers in Avon, OH · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Coolsys PDX | 5.7 TCR |
| NAICS-TCR | Quarter Moon Plumbing, Inc. | 5.7 TCR |
| NAICS-TCR | Phillips Plumbing and Mechanical | 5.7 TCR |
| NAICS-TCR | Dillett Mechanical Service, Inc. | 5.7 TCR |
| STATE-SIZE | CW Egg Products | 43 FTE |
| STATE-SIZE | STgenetics-Marysville | 43 FTE |
| STATE-SIZE | St. Clairsville Ohio | 43 FTE |
| STATE-SIZE | Dresden Plant | 43 FTE |
| CITY-NEAR | Avon Hospital | 1,045 FTE |
| CITY-NEAR | Cleveland Clinic Avon Hospital | 773 FTE |
| CITY-NEAR | Bendix Commercial Vehicle Systems, LLC - Avon | 596 FTE |
| CITY-NEAR | Richard E. Jacobs Health Center | 497 FTE |
| NAT-TCR | La-Z-Boy Furniture Galleries of Colorado Springs | 5.7 TCR |
| NAT-TCR | Buckhead Beef of Atlanta | 5.7 TCR |
| NAT-TCR | St. Francis Nursing Care Center | 5.7 TCR |
| NAT-TCR | Courtyard Virginia Beach Norfolk | 5.7 TCR |
| NAT-SIZE | Savannah | 43 FTE |
| NAT-SIZE | Bridgestone VSI | 43 FTE |
| NAT-SIZE | Copper and Brass Sales - South Bend | 43 FTE |
| NAT-SIZE | Ampacet Research & Development Center | 43 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.