Cellular phone tower construction · Maine

Tilson Technology Management, Inc., Portland, ME

Portland, ME · ~135 workers · 5 years of OSHA Injury Tracking Application data.

A
Excellent Safety Record
0.3
Avg TCR
2.8
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Tilson Technology Management, Inc., Portland, ME runs at 9% of its industry's injury rate - far safer than the typical Cellular phone tower construction workplace, earning a grade A.

Tilson Technology Management, Inc., Portland, ME: 0.3 TCR = 9% of Cellular phone tower construction BLS 2.8 · 5y Form 300A (see methodology below)

Tilson Technology Management, Inc., Portland, ME safety composite

Tilson Technology Management, Inc., Portland, ME scores strongest on total case rate (tcr) (safer than 95% of same-industry peers) and weakest on fatalities (safer than 52%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

B

78/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
A 0.26 per 100 workers

Safer than 95% of industry peers

DART rate
B 0 per 100 workers

Safer than 78% of industry peers

Fatalities
D 0

Safer than 52% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Tilson Technology Management, Inc., Portland, ME held a steady TCR band

Tilson Technology Management, Inc., Portland, ME's TCR held near 0.0 from 0.0 in 2016 to 0.0 in 2022. Peak filing year was 2020 at 1.3 TCR. In 2022, DART was 0× this establishment's average TCR (severity share of cases).

2016=0.0 · 2018=0.0 · 2019=0.0 · 2020=1.3 · 2022=0.0

OSHA ITA Form 300A scorecard

Establishment book 237130 · Portland, ME AT/BELOW-IND · MID

Grade A · TCR 0.3 · 9% of ind

  • DART 0.0 DART
  • RANK #1/10
  • PHOTO DBE Management
  • BOOK 5y book
  • INJ 2 inj
  • SIZE ~135 FTE

Nearest TCR peer: DBE Management (0.0 TCR gap)

Read with this employer → · Industry book → · Maine employers → · Look up another →

Tilson Technology Management, Inc., Portland, ME in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Tilson Technology Management, Inc., Portland, ME averages 0.3 TCR (9% of the Cellular phone tower construction BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Tilson Technology Management, Inc., Portland, ME TCR series: 2016=0 · 2018=0 · 2019=0 · 2020=1.3 · 2022=0 · BLS 2.8

Where Tilson Technology Management, Inc., Portland, ME falls in its industry

1,605 Cellular phone tower construct establishments

Safer than 95% of graded establishments in this industry, whose median TCR is 2.0.

More dangerous than peersSafer than peers

Narrower to Maine alone (the establishments it most directly competes with for workers and contracts): ranked #1 safest of 10 Cellular phone tower construct employers in Maine.

Tilson Technology Management, Inc., Portland, ME (135 employees, TCR 0.3) among 29 same-industry peers, split at the industry median of 74 employees and a TCR of 2.0 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 05101520 Average employees Total Case Rate Tilson Technology Management, Inc., Portland, ME
Tilson Technology Management, Inc., Portland, ME (135 employees, TCR 0.3) among 29 same-industry peers, split at the industry median of 74 employees and a TCR of 2.0

Tilson Technology Management, Inc., Portland, ME has more employees than the Cellular phone tower construction median and a lower injury rate than the industry's median TCR of 2.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2022 0.0 0.0 0 0 0
2020 1.3 0.0 2 0 0
2019 0.0 0.0 0 0 0
2018 0.0 0.0 0 0 0
2016 0.0 0.0 0 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

237130 · ME · Portland

1,605 Cellular phone tower construction employers nationwide with a credible TCR · 2,397 rated employers in Maine with headcount on file · 244 employers in Portland, ME · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR DBE Management 0.3 TCR
NAICS-TCR Miller Bros 0.3 TCR
NAICS-TCR Sigora Solar 0.3 TCR
NAICS-TCR Phoenix Construction 0.3 TCR
STATE-SIZE Huber Engineered Woods 135 FTE
STATE-SIZE 2904-SAS-ME 135 FTE
STATE-SIZE 5472-000002550 135 FTE
STATE-SIZE 6462 135 FTE
CITY-NEAR MMC 8,437 FTE
CITY-NEAR MMC- 22 Bram 5,535 FTE
CITY-NEAR Point32Health Portland 4,440 FTE
CITY-NEAR MMP Practices 2,063 FTE
NAT-TCR Service Center Operations : 0780 0.3 TCR
NAT-TCR Miller Bros 0.3 TCR
NAT-TCR KLS MCS East CH-7B 0.3 TCR
NAT-TCR Sodexo at Marshall Univ-Student Center 0.3 TCR
NAT-SIZE 4319 North Chicago Container 135 FTE
NAT-SIZE 4360 Germantown Container 135 FTE
NAT-SIZE Pretium Packaging - Anaheim 135 FTE
NAT-SIZE Ladwp 12700 Vista Del Mar 135 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2022, 2020, 2019, 2018, 2016. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.