Asphalt paving (i.e., highway, road, street, public sidewalk) · Oklahoma
T.J. Campbell Construction Co.
Edmond, OK · ~139 workers · 9 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 6.8
- Avg TCR
- 2.8
- Industry avg
- 1
- Fatality
The verdict
T.J. Campbell Construction Co. runs at 243% of its industry's injury rate - far more dangerous than the typical Asphalt paving (i.e., highway, road, street, public sidewalk) workplace, earning a grade F.
T.J. Campbell Construction Co.: 6.8 TCR = 243% of Asphalt paving (i.e., highway, road, street, public sidewalk) BLS 2.8 · 9y Form 300A (see methodology below)
T.J. Campbell Construction Co. safety composite
T.J. Campbell Construction Co. scores strongest on dart rate (safer than 26% of same-industry peers) and weakest on fatalities (safer than 3%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
17/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 6.8 per 100 workers
Safer than 18% of industry peers
- DART rate
- F 3.21 per 100 workers
Safer than 26% of industry peers
- Fatalities
- F 1
Safer than 3% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−4.3
2016→2024
T.J. Campbell Construction Co. injury rate improved
T.J. Campbell Construction Co.'s TCR fell 4.3 from 7.5 in 2016 to 3.2 in 2024. Peak filing year was 2023 at 10.1 TCR. In 2024, DART was 0.47× this establishment's average TCR (severity share of cases).
2016=7.5 · 2017=4.8 · 2018=4.5 · 2019=8.7 · 2020=4.0 · 2021=9.6 · 2022=8.6 · 2023=10.1 · 2024=3.2
OSHA ITA Form 300A scorecard
Establishment book 237310 · Edmond, OK ABOVE-IND · MID
Grade F · TCR 6.8 · 243% of ind
- DART 3.2 DART
- RANK #40/43
- PHOTO Vecellio & Grogan-Pr…
- BOOK 9y book
- INJ 101 inj
- SIZE ~139 FTE
Nearest TCR peer: Vecellio & Grogan-Project #100-0168 (0.0 TCR gap)
Read with this employer → · Industry book → · Oklahoma employers → · Look up another →
T.J. Campbell Construction Co. in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
T.J. Campbell Construction Co.
6.8 TCR
- Vecellio & Gro
Vecellio & Grogan-Project #100-0168
6.8 TCR
- LaForge and Bu
LaForge and Budd Construction Co., Inc.
6.8 TCR
- Van Buren Coun
Van Buren County Road Commission
6.8 TCR
- Minnesota Depa
Minnesota Department of Transportation District 1
6.8 TCR
What this shows T.J. Campbell Construction Co. averages 6.8 TCR (243% of the Asphalt paving (i.e., highway, road, street, public sidewalk) BLS benchmark).
T.J. Campbell Construction Co. TCR series: 2016=7.5 · 2017=4.8 · 2018=4.5 · 2019=8.7 · 2020=4 · 2021=9.6 · 2022=8.6 · 2023=10.1 · 2024=3.2 · BLS 2.8
Where T.J. Campbell Construction Co. falls in its industry
4,078 Asphalt paving (i.e., highway, establishmentsSafer than 18% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Oklahoma alone (the establishments it most directly competes with for workers and contracts): ranked #40 safest of 43 Asphalt paving (i.e., highway, employers in Oklahoma.
T.J. Campbell Construction Co. has more employees than the Asphalt paving (i.e., highway, road, str median and a higher injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 3.2 | 3.2 | 5 | 0 | 0 |
| 2023 | 10.1 | 7.4 | 13 | 2 | 0 |
| 2022 | 8.6 | 5.0 | 12 | 0 | 0 |
| 2021 | 9.6 | 7.6 | 14 | 0 | 1 |
| 2020 | 4.0 | 2.9 | 7 | 0 | 0 |
| 2019 | 8.7 | 7.6 | 16 | 0 | 0 |
| 2018 | 4.5 | 4.0 | 8 | 0 | 0 |
| 2017 | 4.8 | 4.3 | 10 | 0 | 0 |
| 2016 | 7.5 | 5.8 | 16 | 1 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · OK · Edmond
4,078 Asphalt paving (i.e., highway, road, street, public sidewalk) employers nationwide with a credible TCR · 5,320 rated employers in Oklahoma with headcount on file · 124 employers in Edmond, OK · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Vecellio & Grogan-Project #100-0168 | 6.8 TCR |
| NAICS-TCR | LaForge and Budd Construction Co., Inc. | 6.8 TCR |
| NAICS-TCR | Van Buren County Road Commission | 6.8 TCR |
| NAICS-TCR | Minnesota Department of Transportation District 1 | 6.8 TCR |
| STATE-SIZE | Construction | 139 FTE |
| STATE-SIZE | IDABEL | 139 FTE |
| STATE-SIZE | Pan Pacific Products | 139 FTE |
| STATE-SIZE | Tulsa MFG (O and G) - 1465 | 139 FTE |
| CITY-NEAR | University of Central Oklahoma | 2,718 FTE |
| CITY-NEAR | Global Security Corporation | 1,147 FTE |
| CITY-NEAR | Oklahoma Foods | 484 FTE |
| CITY-NEAR | 389 | 443 FTE |
| NAT-TCR | Union University | 6.8 TCR |
| NAT-TCR | Crockett Electric Co. | 6.8 TCR |
| NAT-TCR | Heartland REMC - Wabash District | 6.8 TCR |
| NAT-TCR | Coal Valley IL | 6.8 TCR |
| NAT-SIZE | Davic dba County Market | 139 FTE |
| NAT-SIZE | Mack Concrete Industries, Inc | 139 FTE |
| NAT-SIZE | NH Road Crews and Installation | 139 FTE |
| NAT-SIZE | Kent Sporting Goods | 139 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.