Trusses, wood roof or floor, manufacturing · California
Truspro Structural Components, Inc.
Guadalupe, CA · ~31 workers · 5 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 14.6
- Avg TCR
- 3.3
- Industry avg
- 0
- Fatalities
The verdict
Truspro Structural Components, Inc. runs at 442% of its industry's injury rate - far more dangerous than the typical Trusses, wood roof or floor, manufacturing workplace, earning a grade F.
Truspro Structural Components, Inc.: 14.6 TCR = 442% of Trusses, wood roof or floor, manufacturing BLS 3.3 · 5y Form 300A (see methodology below)
Truspro Structural Components, Inc. safety composite
Truspro Structural Components, Inc. scores strongest on fatalities (safer than 50% of same-industry peers) and weakest on dart rate (safer than 2%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
17/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 14.57 per 100 workers
Safer than 10% of industry peers
- DART rate
- F 17.7 per 100 workers
Safer than 2% of industry peers
- Fatalities
- D 0
Safer than 50% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Truspro Structural Components, Inc.: 8.7 → 17.7 TCR
Peak year 2018 @ 21.3 TCR · DART/TCR 1.21× in 2021
Truspro Structural Components, Inc.'s TCR rose 9.0 from 8.7 in 2017 to 17.7 in 2021. Peak filing year was 2018 at 21.3 TCR. In 2021, DART was 1.21× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 321214 · Guadalupe, CA ABOVE-IND · SMALL
Grade F · TCR 14.6 · 442% of ind
- DART 17.7 DART
- RANK #15/20
- PHOTO Nisbet Brower Compon…
- BOOK 5y book
- INJ 22 inj
- SIZE ~31 FTE
Nearest TCR peer: Nisbet Brower Components (0.1 TCR gap)
Read with this employer → · Industry book → · California employers → · Look up another →
Truspro Structural Components, Inc. in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- K-I Lexington
K-I Lexington Truss
14.7 TCR
- Trussworthy Co
Trussworthy Components, Inc.
14.7 TCR
- This site
Truspro Structural Components, Inc.
14.6 TCR
- Nisbet Brower
Nisbet Brower Components
14.6 TCR
- 4502 - Valley
4502 - Valley Truss Plant
14.4 TCR
What this shows Truspro Structural Components, Inc. averages 14.6 TCR (442% of the Trusses, wood roof or floor, manufacturing BLS benchmark).
Truspro Structural Components, Inc. TCR series: 2017=8.7 · 2018=21.3 · 2019=15.4 · 2020=9.7 · 2021=17.7 · BLS 3.3
Where Truspro Structural Components, Inc. falls in its industry
421 Trusses, wood roof or floor, m establishmentsSafer than 10% of graded establishments in this industry, whose median TCR is 7.0.
Narrower to California alone (the establishments it most directly competes with for workers and contracts): ranked #15 safest of 20 Trusses, wood roof or floor, m employers in California.
Truspro Structural Components, Inc. has fewer employees than the Trusses, wood roof or floor, manufacturi median and a higher injury rate than the industry's median TCR of 7.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2021 | 17.7 | 17.7 | 5 | 0 | 0 |
| 2020 | 9.7 | 9.7 | 3 | 0 | 0 |
| 2019 | 15.4 | 12.4 | 5 | 0 | 0 |
| 2018 | 21.3 | 3.0 | 7 | 0 | 0 |
| 2017 | 8.7 | 0.0 | 2 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
321214 · CA · Guadalupe
421 Trusses, wood roof or floor, manufacturing employers nationwide with a credible TCR · 51,834 rated employers in California with headcount on file · 10 employers in Guadalupe, CA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Nisbet Brower Components | 14.6 TCR |
| NAICS-TCR | K-I Lexington Truss | 14.7 TCR |
| NAICS-TCR | Trussworthy Components, Inc. | 14.7 TCR |
| NAICS-TCR | 4502 - Valley Truss Plant | 14.4 TCR |
| STATE-SIZE | GCF | 31 FTE |
| STATE-SIZE | Nielsen Farms | 31 FTE |
| STATE-SIZE | Western Star Nurseries LLC | 31 FTE |
| STATE-SIZE | Progressive Growers Inc | 31 FTE |
| CITY-NEAR | Wish Farms CA - Santa Maria | 1,199 FTE |
| CITY-NEAR | BYRD HARVEST INC | 277 FTE |
| CITY-NEAR | PanAmerican Seed Guadlupe | 67 FTE |
| CITY-NEAR | Ameri-Kleen - Guadalupe Branch | 51 FTE |
| NAT-TCR | White Star Machinery- Tulsa | 14.6 TCR |
| NAT-TCR | The Pearl at Krusw Way | 14.6 TCR |
| NAT-TCR | The Village at Alameda (ALF) | 14.6 TCR |
| NAT-TCR | Sodexo at Usmc-E Mh 8th & I | 14.6 TCR |
| NAT-SIZE | Topline/Hy-Lift Johnson | 31 FTE |
| NAT-SIZE | Prairie Senior Cottages LLC - Isanti | 31 FTE |
| NAT-SIZE | City of New Britain - DPM | 31 FTE |
| NAT-SIZE | M&M Service Company - Carlinville Office | 31 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.