Sewage treatment plant construction · Florida
103914 - City of Largo WWRF Biological Treatment
Clearwater, FL · ~33 workers · 3 years of OSHA Injury Tracking Application data.
- B
- Good Safety Record
- 2.2
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
103914 - City of Largo WWRF Biological Treatment runs at 79% of its industry's injury rate - safer than the typical Sewage treatment plant construction workplace, earning a grade B.
103914 - City of Largo WWRF Biological Treatment: 2.2 TCR = 79% of Sewage treatment plant construction BLS 2.8 · 3y Form 300A (see methodology below)
103914 - City of Largo WWRF Biological Treatment safety composite
103914 - City of Largo WWRF Biological Treatment scores strongest on dart rate (safer than 79% of same-industry peers) and weakest on fatalities (safer than 52%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
66/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 2.21 per 100 workers
Safer than 63% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 79% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−2.8
2019→2022
103914 - City of Largo WWRF Biological Treatment injury rate improved
103914 - City of Largo WWRF Biological Treatment's TCR fell 2.8 from 2.8 in 2019 to 0.0 in 2022. Peak filing year was 2020 at 3.8 TCR. In 2022, DART was 0× this establishment's average TCR (severity share of cases).
2019=2.8 · 2020=3.8 · 2022=0.0
OSHA ITA Form 300A scorecard
Establishment book 237110 · Clearwater, FL AT/BELOW-IND · SMALL
Grade B · TCR 2.2 · 79% of ind
- DART 0.0 DART
- RANK #39/121
- PHOTO RTM Construction Com…
- BOOK 3y book
- INJ 3 inj
- SIZE ~33 FTE
Nearest TCR peer: RTM Construction Company, Ltd (0.0 TCR gap)
Read with this employer → · Industry book → · Florida employers → · Look up another →
103914 - City of Largo WWRF Biological Treatment in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
103914 - City of Largo WWRF Biological Treatment
2.2 TCR
- RTM Constructi
RTM Construction Company, Ltd
2.2 TCR
- Kellenberger,
Kellenberger, Inc.
2.2 TCR
- Balfour Beatty
Balfour Beatty - Lake Kilby WTP
2.2 TCR
- Wahlund Constr
Wahlund Construction, Inc.
2.2 TCR
What this shows 103914 - City of Largo WWRF Biological Treatment averages 2.2 TCR (79% of the Sewage treatment plant construction BLS benchmark).
103914 - City of Largo WWRF Biological Treatment TCR series: 2019=2.8 · 2020=3.8 · 2022=0 · BLS 2.8
Where 103914 - City of Largo WWRF Biological Treatment falls in its industry
1,614 Sewage treatment plant constru establishmentsSafer than 63% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Florida alone (the establishments it most directly competes with for workers and contracts): ranked #39 safest of 121 Sewage treatment plant constru employers in Florida.
103914 - City of Largo WWRF Biological Treatment has fewer employees than the Sewage treatment plant construction median and a lower injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 3.8 | 0.0 | 2 | 0 | 0 |
| 2019 | 2.8 | 0.0 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237110 · FL · Clearwater
1,614 Sewage treatment plant construction employers nationwide with a credible TCR · 26,569 rated employers in Florida with headcount on file · 548 employers in Clearwater, FL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | RTM Construction Company, Ltd | 2.2 TCR |
| NAICS-TCR | Kellenberger, Inc. | 2.2 TCR |
| NAICS-TCR | Balfour Beatty - Lake Kilby WTP | 2.2 TCR |
| NAICS-TCR | Wahlund Construction, Inc. | 2.2 TCR |
| STATE-SIZE | Yee Farms Inc. | 33 FTE |
| STATE-SIZE | OZBLU USA LLC | 33 FTE |
| STATE-SIZE | POK-Okeechobee Clean Energy Center | 33 FTE |
| STATE-SIZE | Plant City Office | 33 FTE |
| CITY-NEAR | Morton Plant Hospital (2100) | 3,648 FTE |
| CITY-NEAR | BayCare Health System (0020) | 3,171 FTE |
| CITY-NEAR | TD SYNNEX Clearwater | 2,583 FTE |
| CITY-NEAR | Resale Shoppe Countryside | 2,476 FTE |
| NAT-TCR | Century Gaming Technologies - Billings | 2.2 TCR |
| NAT-TCR | Charlestown | 2.2 TCR |
| NAT-TCR | Olmsted Medical Center NW Clinic | 2.2 TCR |
| NAT-TCR | 3793 Supermercado Nuestra Familia (Q St, Omaha, Ne) | 2.2 TCR |
| NAT-SIZE | Syntec Corporate | 33 FTE |
| NAT-SIZE | Morrow Heights Assisted Living | 33 FTE |
| NAT-SIZE | Wheelabrator Lisbon Inc. | 33 FTE |
| NAT-SIZE | Wheelabrator Concord Company, L.P. | 33 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.