Power plant (except hydroelectric) construction · Utah
105185 - IPP Repowering- 840MW 2x2x1 CC
Delta, UT · ~533 workers · 3 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.1
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
105185 - IPP Repowering- 840MW 2x2x1 CC runs at 2% of its industry's injury rate - far safer than the typical Power plant (except hydroelectric) construction workplace, earning a grade A.
105185 - IPP Repowering- 840MW 2x2x1 CC: 0.1 TCR = 2% of Power plant (except hydroelectric) construction BLS 2.8 · 3y Form 300A (see methodology below)
105185 - IPP Repowering- 840MW 2x2x1 CC safety composite
105185 - IPP Repowering- 840MW 2x2x1 CC scores strongest on total case rate (tcr) (safer than 100% of same-industry peers) and weakest on fatalities (safer than 52%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
73/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0.06 per 100 workers
Safer than 100% of industry peers
- DART rate
- C 0.08 per 100 workers
Safer than 56% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
105185 - IPP Repowering- 840MW 2x2x1 CC held a steady TCR band
105185 - IPP Repowering- 840MW 2x2x1 CC's TCR held near 0.2 from 0.0 in 2022 to 0.2 in 2024. In 2024, DART was 1.33× this establishment's average TCR (severity share of cases).
2022=0.0 · 2023=0.0 · 2024=0.2
OSHA ITA Form 300A scorecard
Establishment book 237130 · Delta, UT AT/BELOW-IND · MID
Grade A · TCR 0.1 · 2% of ind
- DART 0.1 DART
- RANK #1/24
- PHOTO 103171 - Huntington …
- BOOK 3y book
- INJ 2 inj
- SIZE ~533 FTE
Nearest TCR peer: 103171 - Huntington Beach Energy Project (0.0 TCR gap)
Read with this employer → · Industry book → · Utah employers → · Look up another →
105185 - IPP Repowering- 840MW 2x2x1 CC in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site 0.1
105185 - IPP Repowering- 840MW 2x2x1 CC
0.1 TCR
- 103171 - Hunti 0.1
103171 - Huntington Beach Energy Project
0.1 TCR
- 103258 - Birds 0.1
103258 - Birdsboro Power Project
0.1 TCR
- LGA Services 0.1
LGA Services
0.1 TCR
- Plaza 0.1
Plaza
0.1 TCR
What this shows 105185 - IPP Repowering- 840MW 2x2x1 CC averages 0.1 TCR (2% of the Power plant (except hydroelectric) construction BLS benchmark).
105185 - IPP Repowering- 840MW 2x2x1 CC TCR series: 2022=0 · 2023=0 · 2024=0.2 · BLS 2.8
Where 105185 - IPP Repowering- 840MW 2x2x1 CC falls in its industry
1,605 Power plant (except hydroelect establishmentsSafer than 100% of graded establishments in this industry, whose median TCR is 2.0.
Narrower to Utah alone (the establishments it most directly competes with for workers and contracts): ranked #1 safest of 24 Power plant (except hydroelect employers in Utah.
105185 - IPP Repowering- 840MW 2x2x1 CC has more employees than the Power plant (except hydroelectric) const median and a lower injury rate than the industry's median TCR of 2.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.2 | 0.1 | 2 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237130 · UT · Delta
1,605 Power plant (except hydroelectric) construction employers nationwide with a credible TCR · 3,861 rated employers in Utah with headcount on file · 6 employers in Delta, UT · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | 103171 - Huntington Beach Energy Project | 0.1 TCR |
| NAICS-TCR | 103258 - Birdsboro Power Project | 0.1 TCR |
| NAICS-TCR | LGA Services | 0.1 TCR |
| NAICS-TCR | Plaza | 0.1 TCR |
| STATE-SIZE | Arnold Machinery | 534 FTE |
| STATE-SIZE | WEST VALLEY PLANT | 530 FTE |
| STATE-SIZE | UT004 | 536 FTE |
| STATE-SIZE | Wasatch Electric | 538 FTE |
| CITY-NEAR | Intermountain Power Service Corp. | 375 FTE |
| CITY-NEAR | Delta Community Hospital | 87 FTE |
| CITY-NEAR | Delta | 40 FTE |
| CITY-NEAR | Delta #2 | 20 FTE |
| NAT-TCR | Minnesota Department of Health - Golden Rule Building | 0.1 TCR |
| NAT-TCR | Novelis North America | 0.1 TCR |
| NAT-TCR | NCCRYANC | 0.1 TCR |
| NAT-TCR | Nelnet Business Solutions Inc | 0.1 TCR |
| NAT-SIZE | Lakeview Village | 533 FTE |
| NAT-SIZE | Coherent Corp. | 533 FTE |
| NAT-SIZE | Denver Center for the Performing Arts | 533 FTE |
| NAT-SIZE | Livingston Health Care System | 533 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.