Installation of photovoltaic panels · California
Alternative Energy Systems
Chico, CA · ~64 workers · 5 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 8.3
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Alternative Energy Systems runs at 296% of its industry's injury rate - far more dangerous than the typical Installation of photovoltaic panels workplace, earning a grade F.
Alternative Energy Systems: 8.3 TCR = 296% of Installation of photovoltaic panels BLS 2.8 · 5y Form 300A (see methodology below)
Alternative Energy Systems safety composite
Alternative Energy Systems scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 1%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
16/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 8.3 per 100 workers
Safer than 8% of industry peers
- DART rate
- F 13.53 per 100 workers
Safer than 1% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Alternative Energy Systems: 0.0 → 17.4 TCR
Peak year 2022 @ 17.4 TCR · DART/TCR 1.63× in 2022
Alternative Energy Systems's TCR rose 17.4 from 0.0 in 2017 to 17.4 in 2022. In 2022, DART was 1.63× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 238210 · Chico, CA ABOVE-IND · SMALL
Grade F · TCR 8.3 · 296% of ind
- DART 13.5 DART
- RANK #480/548
- PHOTO Romanoff Electric Re…
- BOOK 5y book
- INJ 14 inj
- SIZE ~64 FTE
Nearest TCR peer: Romanoff Electric Residential - Raleigh (0.0 TCR gap)
Read with this employer → · Industry book → · California employers → · Look up another →
Alternative Energy Systems in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Alternative Energy Systems
8.3 TCR
- Romanoff Elect
Romanoff Electric Residential - Raleigh
8.3 TCR
- CCI:CC016 - CC
CCI:CC016 - CC016-Colorado
8.3 TCR
- Lantek Communi
Lantek Communications Inc.
8.3 TCR
- Design Electri
Design Electric, Inc.
8.3 TCR
What this shows Alternative Energy Systems averages 8.3 TCR (296% of the Installation of photovoltaic panels BLS benchmark).
Alternative Energy Systems TCR series: 2017=0 · 2018=3 · 2019=10.4 · 2021=10.7 · 2022=17.4 · BLS 2.8
Where Alternative Energy Systems falls in its industry
4,550 Installation of photovoltaic p establishmentsSafer than 8% of graded establishments in this industry, whose median TCR is 2.5.
Narrower to California alone (the establishments it most directly competes with for workers and contracts): ranked #480 safest of 548 Installation of photovoltaic p employers in California.
Alternative Energy Systems has more employees than the Installation of photovoltaic panels median and a higher injury rate than the industry's median TCR of 2.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2022 | 17.4 | 13.5 | 4 | 5 | 0 |
| 2021 | 10.7 | 2.1 | 1 | 4 | 0 |
| 2019 | 10.4 | 10.4 | 7 | 0 | 0 |
| 2018 | 3.0 | 1.5 | 2 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238210 · CA · Chico
4,550 Installation of photovoltaic panels employers nationwide with a credible TCR · 51,834 rated employers in California with headcount on file · 189 employers in Chico, CA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Romanoff Electric Residential - Raleigh | 8.3 TCR |
| NAICS-TCR | CCI:CC016 - CC016-Colorado | 8.3 TCR |
| NAICS-TCR | Lantek Communications Inc. | 8.3 TCR |
| NAICS-TCR | Design Electric, Inc. | 8.3 TCR |
| STATE-SIZE | Costa Farms, Inc. | 64 FTE |
| STATE-SIZE | MDERA | 64 FTE |
| STATE-SIZE | AGS FARM LABOR CORPORATION | 64 FTE |
| STATE-SIZE | Arroyo Seco Vineyards, Inc | 64 FTE |
| CITY-NEAR | CA-11 | 4,124 FTE |
| CITY-NEAR | Enloe Medical Center Employees | 3,831 FTE |
| CITY-NEAR | California Department of Transportation Facility 72 | 2,394 FTE |
| CITY-NEAR | California Department of Transportation Facility 521 | 2,370 FTE |
| NAT-TCR | Mazda Toyota Manufacturing, U.S.A., Inc. | 8.3 TCR |
| NAT-TCR | Savannah | 8.3 TCR |
| NAT-TCR | Newport News Police Department | 8.3 TCR |
| NAT-TCR | 6400-SWY-0017-0017-00250 | 8.3 TCR |
| NAT-SIZE | Klx LLC | 64 FTE |
| NAT-SIZE | Parsec COI | 64 FTE |
| NAT-SIZE | Crimson Warehouse | 64 FTE |
| NAT-SIZE | Wire Design | 64 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.