Electric power generation, fossil fuel (e.g., coal, oil, gas) · Mississippi
Batesville Generating Station
Batesville, MS · ~44 workers · 9 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.3
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Batesville Generating Station runs at 23% of its industry's injury rate - far safer than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade A.
Batesville Generating Station: 0.3 TCR = 23% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 9y Form 300A (see methodology below)
Batesville Generating Station safety composite
Batesville Generating Station scores strongest on total case rate (tcr) (safer than 96% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
76/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0.28 per 100 workers
Safer than 96% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−2.5
2016→2024
Batesville Generating Station injury rate improved
Batesville Generating Station's TCR fell 2.5 from 2.5 in 2016 to 0.0 in 2024. Peak filing year was 2016 at 2.5 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=2.5 · 2017=0.0 · 2018=0.0 · 2019=0.0 · 2020=0.0 · 2021=0.0 · 2022=0.0 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Batesville, MS AT/BELOW-IND · SMALL
Grade A · TCR 0.3 · 23% of ind
- DART 0.0 DART
- RANK #1/16
- PHOTO Calpine Houston Corp…
- BOOK 9y book
- INJ 1 inj
- SIZE ~44 FTE
Nearest TCR peer: Calpine Houston Corporate Offices (0.0 TCR gap)
Read with this employer → · Industry book → · Mississippi employers → · Look up another →
Batesville Generating Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site 0.3
Batesville Generating Station
0.3 TCR
- Calpine Housto 0.3
Calpine Houston Corporate Offices
0.3 TCR
- Wolf Hollow 0.3
Wolf Hollow
0.3 TCR
- Headquarters 0.3
Headquarters
0.3 TCR
- Midwest Energy 0.3
Midwest Energy Resources Company
0.3 TCR
What this shows Batesville Generating Station averages 0.3 TCR (23% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
Batesville Generating Station TCR series: 2016=2.5 · 2017=0 · 2018=0 · 2019=0 · 2020=0 · 2021=0 · 2022=0 · 2023=0 · 2024=0 · BLS 1.2
Where Batesville Generating Station falls in its industry
846 Electric power generation, fos establishmentsSafer than 96% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Mississippi alone (the establishments it most directly competes with for workers and contracts): ranked #1 safest of 16 Electric power generation, fos employers in Mississippi.
Batesville Generating Station has fewer employees than the Electric power generation, fossil fuel ( median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 2.5 | 0.0 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · MS · Batesville
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 4,083 rated employers in Mississippi with headcount on file · 38 employers in Batesville, MS · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Calpine Houston Corporate Offices | 0.3 TCR |
| NAICS-TCR | Wolf Hollow | 0.3 TCR |
| NAICS-TCR | Headquarters | 0.3 TCR |
| NAICS-TCR | Midwest Energy Resources Company | 0.3 TCR |
| STATE-SIZE | Greenwood District Office | 44 FTE |
| STATE-SIZE | Coahoma Electric Power Association | 44 FTE |
| STATE-SIZE | Aladdin Construction Co., Inc. | 44 FTE |
| STATE-SIZE | Thompson Industrial Services, LLC, Division 51 | 44 FTE |
| CITY-NEAR | Greenwood-Batesville | 439 FTE |
| CITY-NEAR | Supply Chain : Batesville, MS | 371 FTE |
| CITY-NEAR | Supply Chain Batesville MS | 276 FTE |
| CITY-NEAR | 1468 | 265 FTE |
| NAT-TCR | WAC Midland Admin. | 0.3 TCR |
| NAT-TCR | Plant Tugalo | 0.3 TCR |
| NAT-TCR | ARLANXEO, Orange Site, Texas | 0.3 TCR |
| NAT-TCR | Arkema Inc. Houston Plant | 0.3 TCR |
| NAT-SIZE | Sun Dial Manor, Inc | 44 FTE |
| NAT-SIZE | Raith America International Applications Center | 44 FTE |
| NAT-SIZE | Black River Plumbing, Heating & AC, Inc. | 44 FTE |
| NAT-SIZE | POET Biorefining - North Manchester | 44 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.