Electric power generation, fossil fuel (e.g., coal, oil, gas) · Pennsylvania
Brunner Island - Talen Energy
Mount Wolfe, PA · ~123 workers · 2 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 1.5
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Brunner Island - Talen Energy runs at 127% of its industry's injury rate - more dangerous than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade D.
Brunner Island - Talen Energy: 1.5 TCR = 127% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 2y Form 300A (see methodology below)
Brunner Island - Talen Energy safety composite
Brunner Island - Talen Energy scores strongest on dart rate (safer than 71% of same-industry peers) and weakest on total case rate (tcr) (safer than 47%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
56/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 1.52 per 100 workers
Safer than 47% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−3.0
2023→2024
Brunner Island - Talen Energy injury rate improved
Brunner Island - Talen Energy's TCR fell 3.0 from 3.0 in 2023 to 0.0 in 2024. Peak filing year was 2023 at 3.0 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2023=3.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Mount Wolfe, PA ABOVE-IND · MID
Grade D · TCR 1.5 · 127% of ind
- DART 0.0 DART
- RANK #28/46
- PHOTO Bosque Energy Center
- BOOK 2y book
- INJ 4 inj
- SIZE ~123 FTE
Nearest TCR peer: Bosque Energy Center (0.0 TCR gap)
Read with this employer → · Industry book → · Pennsylvania employers → · Look up another →
Brunner Island - Talen Energy in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Brunner Island - Talen Energy
1.5 TCR
- Bosque Energy
Bosque Energy Center
1.5 TCR
- Brandon Shores
Brandon Shores Power Plant
1.5 TCR
- Jeffrey Energy
Jeffrey Energy Center
1.5 TCR
- Waterford Powe
Waterford Power, LLC
1.5 TCR
What this shows Brunner Island - Talen Energy averages 1.5 TCR (127% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
Brunner Island - Talen Energy TCR series: 2023=3 · 2024=0 · BLS 1.2
Where Brunner Island - Talen Energy falls in its industry
846 Electric power generation, fos establishmentsSafer than 47% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Pennsylvania alone (the establishments it most directly competes with for workers and contracts): ranked #28 safest of 46 Electric power generation, fos employers in Pennsylvania.
Brunner Island - Talen Energy has more employees than the Electric power generation, fossil fuel ( median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 3.0 | 1.5 | 4 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · PA · Mount Wolfe
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 22,692 rated employers in Pennsylvania with headcount on file · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Bosque Energy Center | 1.5 TCR |
| NAICS-TCR | Brandon Shores Power Plant | 1.5 TCR |
| NAICS-TCR | Jeffrey Energy Center | 1.5 TCR |
| NAICS-TCR | Waterford Power, LLC | 1.5 TCR |
| STATE-SIZE | Kreider Farms - Manheim & Specialty Egg | 123 FTE |
| STATE-SIZE | West Conshohocken Gas Plant | 123 FTE |
| STATE-SIZE | Road-Con, Inc. | 123 FTE |
| STATE-SIZE | ARMOUR & SONS ELECTRIC, INC. | 123 FTE |
| NAT-TCR | The Gorilla Glue Company | 1.5 TCR |
| NAT-TCR | Hood Container Greenville | 1.5 TCR |
| NAT-TCR | Rich Castlewood | 1.5 TCR |
| NAT-TCR | Bryan Opco LLC | 1.5 TCR |
| NAT-SIZE | Park Manor | 123 FTE |
| NAT-SIZE | Cedar Valley Corp LLC | 123 FTE |
| NAT-SIZE | Good Shepherd Hospice | 123 FTE |
| NAT-SIZE | Building Automation Products Inc | 123 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.