Erecting structural steel · Pennsylvania
Building 2 & 3
Lancaster, PA · ~78 workers · 3 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 14.3
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Building 2 & 3 runs at 510% of its industry's injury rate - far more dangerous than the typical Erecting structural steel workplace, earning a grade F.
Building 2 & 3: 14.3 TCR = 510% of Erecting structural steel BLS 2.8 · 3y Form 300A (see methodology below)
Building 2 & 3 safety composite
Building 2 & 3 scores strongest on fatalities (safer than 53% of same-industry peers) and weakest on dart rate (safer than 3%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
16/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 14.28 per 100 workers
Safer than 5% of industry peers
- DART rate
- F 13.01 per 100 workers
Safer than 3% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Building 2 & 3: 11.8 → 15.2 TCR
Peak year 2018 @ 15.9 TCR · DART/TCR 0.91× in 2019
Building 2 & 3's TCR rose 3.4 from 11.8 in 2017 to 15.2 in 2019. Peak filing year was 2018 at 15.9 TCR. In 2019, DART was 0.91× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 238120 · Lancaster, PA ABOVE-IND · SMALL
Grade F · TCR 14.3 · 510% of ind
- DART 13.0 DART
- RANK #36/37
- PHOTO Rackley Company, INC.
- BOOK 3y book
- INJ 38 inj
- SIZE ~78 FTE
Nearest TCR peer: Rackley Company, INC. (0.0 TCR gap)
Read with this employer → · Industry book → · Pennsylvania employers → · Look up another →
Building 2 & 3 in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Superior Walls
Superior Walls Systems, LLC
14.5 TCR
- Austin Iron LL
Austin Iron LLC
14.4 TCR
- This site
Building 2 & 3
14.3 TCR
- Rackley Compan
Rackley Company, INC.
14.3 TCR
- Palm Springs W
Palm Springs Welding Inc
14.3 TCR
What this shows Building 2 & 3 averages 14.3 TCR (510% of the Erecting structural steel BLS benchmark).
Building 2 & 3 TCR series: 2017=11.8 · 2018=15.9 · 2019=15.2 · BLS 2.8
Where Building 2 & 3 falls in its industry
705 Erecting structural steel establishmentsSafer than 5% of graded establishments in this industry, whose median TCR is 3.9.
Narrower to Pennsylvania alone (the establishments it most directly competes with for workers and contracts): ranked #36 safest of 37 Erecting structural steel employers in Pennsylvania.
Building 2 & 3 has more employees than the Erecting structural steel median and a higher injury rate than the industry's median TCR of 3.9. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2019 | 15.2 | 13.0 | 14 | 0 | 0 |
| 2018 | 15.9 | 11.3 | 14 | 0 | 0 |
| 2017 | 11.8 | 8.3 | 10 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238120 · PA · Lancaster
705 Erecting structural steel employers nationwide with a credible TCR · 22,692 rated employers in Pennsylvania with headcount on file · 450 employers in Lancaster, PA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Rackley Company, INC. | 14.3 TCR |
| NAICS-TCR | Palm Springs Welding Inc | 14.3 TCR |
| NAICS-TCR | Austin Iron LLC | 14.4 TCR |
| NAICS-TCR | Superior Walls Systems, LLC | 14.5 TCR |
| STATE-SIZE | Manheim Egg | 78 FTE |
| STATE-SIZE | UGI Penn Natural Gas Archbald | 78 FTE |
| STATE-SIZE | Charter Homes Building Company, Inc. | 78 FTE |
| STATE-SIZE | Bath Saver, Inc. 5 | 78 FTE |
| CITY-NEAR | Lancaster General Health, LGH Hospital | 7,424 FTE |
| CITY-NEAR | LGHealth | 7,215 FTE |
| CITY-NEAR | Lancaster General Hospital | 6,528 FTE |
| CITY-NEAR | Lancaster General Medical Group | 1,436 FTE |
| NAT-TCR | Brookdale Medical Center Whitby | 14.3 TCR |
| NAT-TCR | TuffStuff Fitness International, Inc. | 14.3 TCR |
| NAT-TCR | Rosecastle at Jacksonville | 14.3 TCR |
| NAT-TCR | 563425-Mil-Greenfield Br | 14.3 TCR |
| NAT-SIZE | Amh 100 | 78 FTE |
| NAT-SIZE | TN- Avaya / Ergotron | 78 FTE |
| NAT-SIZE | SwedishAmerican Health System-Belvidere Medical Center | 78 FTE |
| NAT-SIZE | Comm HVAC NA and EMEA : SVC-Carolina District : SVC-GreenvilleSC-USA | 78 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.