Construction · Arizona
CECO Concrete : Southern California
Chandler, AZ · ~10 workers · 3 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 6.0
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
CECO Concrete : Southern California runs at 213% of its industry's injury rate - far more dangerous than the typical Construction workplace, earning a grade F.
CECO Concrete : Southern California: 6.0 TCR = 213% of Construction BLS 2.8 · 3y Form 300A (see methodology below)
CECO Concrete : Southern California safety composite
CECO Concrete : Southern California scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 2%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
23/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 5.96 per 100 workers
Safer than 24% of industry peers
- DART rate
- F 17.89 per 100 workers
Safer than 2% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
CECO Concrete : Southern California: 0.0 → 17.9 TCR
Peak year 2024 @ 17.9 TCR · DART/TCR 3× in 2024
CECO Concrete : Southern California's TCR rose 17.9 from 0.0 in 2019 to 17.9 in 2024. In 2024, DART was 3× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 238190 · Chandler, AZ ABOVE-IND · SMALL
Grade F · TCR 6.0 · 213% of ind
- DART 17.9 DART
- RANK #8/9
- PHOTO 6900 Steger
- BOOK 3y book
- INJ 1 inj
- SIZE ~10 FTE
Nearest TCR peer: 6900 Steger (0.0 TCR gap)
Read with this employer → · Industry book → · Arizona employers → · Look up another →
CECO Concrete : Southern California in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- McClone Constr
McClone Construction Company Texas
6.1 TCR
- This site
CECO Concrete : Southern California
6 TCR
- 6900 Steger
6900 Steger
6 TCR
- Bay State Indu
Bay State Industrial Welding & Fabrication, Inc.
5.9 TCR
- Jenco Construc
Jenco Construction LLC
5.8 TCR
What this shows CECO Concrete : Southern California averages 6.0 TCR (213% of the Construction BLS benchmark).
CECO Concrete : Southern California TCR series: 2019=0 · 2023=0 · 2024=17.9 · BLS 2.8
Where CECO Concrete : Southern California falls in its industry
166 Construction establishmentsSafer than 24% of graded establishments in this industry, whose median TCR is 3.5.
Narrower to Arizona alone (the establishments it most directly competes with for workers and contracts): ranked #8 safest of 9 Construction employers in Arizona.
CECO Concrete : Southern California has fewer employees than the Construction median and a higher injury rate than the industry's median TCR of 3.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 17.9 | 17.9 | 1 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238190 · AZ · Chandler
166 Construction employers nationwide with a credible TCR · 9,594 rated employers in Arizona with headcount on file · 462 employers in Chandler, AZ · 4 cross-state NAT-TCR peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | 6900 Steger | 6.0 TCR |
| NAICS-TCR | Bay State Industrial Welding & Fabrication, Inc. | 5.9 TCR |
| NAICS-TCR | Jenco Construction LLC | 5.8 TCR |
| NAICS-TCR | McClone Construction Company Texas | 6.1 TCR |
| STATE-SIZE | CUPERTINO ELECTRIC, INC. - ARIZONA OPERATIONS | 10 FTE |
| STATE-SIZE | Artistic Southern - Tucson | 10 FTE |
| STATE-SIZE | Polyglass USA, Inc. - Phoenix | 10 FTE |
| STATE-SIZE | Hillyard Tucson | 10 FTE |
| CITY-NEAR | Chandler Campus | 6,163 FTE |
| CITY-NEAR | Ocotillo Campus | 5,428 FTE |
| CITY-NEAR | 6403-64030510 | 3,265 FTE |
| CITY-NEAR | 2643-64030510-510001 | 2,446 FTE |
| NAT-TCR | Kenworth Truck Company Renton | 6.0 TCR |
| NAT-TCR | Cullman Electric Cooperative | 6.0 TCR |
| NAT-TCR | Erect-A-Tube, Inc. | 6.0 TCR |
| NAT-TCR | 301 Travis - Therm-Tech of Waukesha, Inc. | 6.0 TCR |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.