Fossil Fuel Electric Generation · Colorado
Cherokee Station
Denver, CO · ~72 workers · 5 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 1.2
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Cherokee Station runs at 99% of its industry's injury rate - about level with the typical Fossil Fuel Electric Generation workplace, earning a grade C.
Cherokee Station: 1.2 TCR = 99% of Fossil Fuel Electric Generation BLS 1.2 · 5y Form 300A (see methodology below)
Cherokee Station safety composite
Cherokee Station scores strongest on dart rate (safer than 71% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
61/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 1.19 per 100 workers
Safer than 59% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−3.2
2016→2020
Cherokee Station injury rate improved
Cherokee Station's TCR fell 3.2 from 3.2 in 2016 to 0.0 in 2020. Peak filing year was 2016 at 3.2 TCR. In 2020, DART was 0× this establishment's average TCR (severity share of cases).
2016=3.2 · 2017=1.3 · 2018=1.5 · 2019=0.0 · 2020=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Denver, CO AT/BELOW-IND · SMALL
Grade C · TCR 1.2 · 99% of ind
- DART 0.0 DART
- RANK #4/19
- PHOTO 00106 YREKA OFFICE
- BOOK 5y book
- INJ 4 inj
- SIZE ~72 FTE
Nearest TCR peer: 00106 YREKA OFFICE (0.0 TCR gap)
Read with this employer → · Industry book → · Colorado employers → · Look up another →
Cherokee Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Cherokee Station
1.2 TCR
- 00106 YREKA OF
00106 YREKA OFFICE
1.2 TCR
- Walter Scott E
Walter Scott Energy Center
1.2 TCR
- Big Rivers Ele
Big Rivers Electric Corporation - Wilson Station
1.2 TCR
- Lackawanna Ene
Lackawanna Energy Center
1.2 TCR
What this shows Cherokee Station averages 1.2 TCR (99% of the Fossil Fuel Electric Generation BLS benchmark).
Cherokee Station TCR series: 2016=3.2 · 2017=1.3 · 2018=1.5 · 2019=0 · 2020=0 · BLS 1.2
Where Cherokee Station falls in its industry
846 Fossil Fuel Electric Generatio establishmentsSafer than 59% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Colorado alone (the establishments it most directly competes with for workers and contracts): ranked #4 safest of 19 Fossil Fuel Electric Generatio employers in Colorado.
Cherokee Station has more employees than the Fossil Fuel Electric Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 1.5 | 1.5 | 1 | 0 | 0 |
| 2017 | 1.3 | 0.0 | 0 | 1 | 0 |
| 2016 | 3.2 | 3.2 | 3 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · CO · Denver
846 Fossil Fuel Electric Generation employers nationwide with a credible TCR · 9,007 rated employers in Colorado with headcount on file · 1,757 employers in Denver, CO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | 00106 YREKA OFFICE | 1.2 TCR |
| NAICS-TCR | Walter Scott Energy Center | 1.2 TCR |
| NAICS-TCR | Big Rivers Electric Corporation - Wilson Station | 1.2 TCR |
| NAICS-TCR | Lackawanna Energy Center | 1.2 TCR |
| STATE-SIZE | Blanca | 72 FTE |
| STATE-SIZE | KAUFFMAN WELL SERVICE, INC. | 72 FTE |
| STATE-SIZE | First Drilling LLC | 72 FTE |
| STATE-SIZE | T-Bone Construction, Inc | 72 FTE |
| CITY-NEAR | DEN DEN | 9,832 FTE |
| CITY-NEAR | 6925-DEN | 6,769 FTE |
| CITY-NEAR | DEN - Airport United Airlines Offices | 5,277 FTE |
| CITY-NEAR | CO-01 | 4,581 FTE |
| NAT-TCR | Western Specialty Contractors - Branch 049 - Houston, TX | 1.2 TCR |
| NAT-TCR | Mitsubishi Electric Automation, Inc. | 1.2 TCR |
| NAT-TCR | Mansfield Ma Store | 1.2 TCR |
| NAT-TCR | ArcelorMittal Burns Harbor, LLC | 1.2 TCR |
| NAT-SIZE | Auria Troy, LLC | 72 FTE |
| NAT-SIZE | 083162-Guilford Po | 72 FTE |
| NAT-SIZE | BNG | 72 FTE |
| NAT-SIZE | Angelica - Columbia | 72 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.