Computerized environmental control systems for buildings manufacturing · Minnesota

Design Ready Controls - BP8

Brooklyn Park, MN · ~268 workers · 3 years of OSHA Injury Tracking Application data.

C
Average Safety Record
3.1
Avg TCR
3.3
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Design Ready Controls - BP8 runs at 94% of its industry's injury rate - about level with the typical Computerized environmental control systems for buildings manufacturing workplace, earning a grade C.

Design Ready Controls - BP8: 3.1 TCR = 94% of Computerized environmental control systems for buildings manufacturing BLS 3.3 · 3y Form 300A (see methodology below)

Design Ready Controls - BP8 safety composite

Design Ready Controls - BP8 scores strongest on fatalities (safer than 50% of same-industry peers) and weakest on total case rate (tcr) (safer than 34%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

D

43/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
F 3.09 per 100 workers

Safer than 34% of industry peers

DART rate
D 0.43 per 100 workers

Safer than 49% of industry peers

Fatalities
D 0

Safer than 50% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

TCR Δ

−1.3

2022→2024

Design Ready Controls - BP8 injury rate improved

Design Ready Controls - BP8's TCR fell 1.3 from 3.0 in 2022 to 1.7 in 2024. Peak filing year was 2023 at 4.6 TCR. In 2024, DART was 0.14× this establishment's average TCR (severity share of cases).

2022=3.0 · 2023=4.6 · 2024=1.7

OSHA ITA Form 300A scorecard

Establishment book 334512 · Brooklyn Park, MN AT/BELOW-IND · MID

Grade C · TCR 3.1 · 94% of ind

  • DART 0.4 DART
  • RANK #4/6
  • PHOTO BELIMO Aircontrols (…
  • BOOK 3y book
  • INJ 23 inj
  • SIZE ~268 FTE

Nearest TCR peer: BELIMO Aircontrols (USA), Inc. (0.1 TCR gap)

Read with this employer → · Industry book → · Minnesota employers → · Look up another →

Design Ready Controls - BP8 in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Design Ready Controls - BP8 averages 3.1 TCR (94% of the Computerized environmental control systems for buildings manufacturing BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Design Ready Controls - BP8 TCR series: 2022=3 · 2023=4.6 · 2024=1.7 · BLS 3.3

Where Design Ready Controls - BP8 falls in its industry

50 Computerized environmental con establishments

Safer than 34% of graded establishments in this industry, whose median TCR is 2.3.

More dangerous than peersSafer than peers

Narrower to Minnesota alone (the establishments it most directly competes with for workers and contracts): ranked #4 safest of 6 Computerized environmental con employers in Minnesota.

Design Ready Controls - BP8 (268 employees, TCR 3.1) among 29 same-industry peers, split at the industry median of 83 employees and a TCR of 2.3 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0200400600 051015 Average employees Total Case Rate Design Ready Controls - BP8
Design Ready Controls - BP8 (268 employees, TCR 3.1) among 29 same-industry peers, split at the industry median of 83 employees and a TCR of 2.3

Design Ready Controls - BP8 has more employees than the Computerized environmental control syste median and a higher injury rate than the industry's median TCR of 2.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 1.7 0.4 4 0 0
2023 4.6 2.7 12 0 0
2022 3.0 3.0 7 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

334512 · MN · Brooklyn Park

50 Computerized environmental control systems for buildings manufacturing employers nationwide with a credible TCR · 15,828 rated employers in Minnesota with headcount on file · 226 employers in Brooklyn Park, MN · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR BELIMO Aircontrols (USA), Inc. 3.2 TCR
NAICS-TCR NIS, LLC Davenport 3.3 TCR
NAICS-TCR HAYWARD - Rhode Island 2.8 TCR
NAICS-TCR Precision Speed Equipment Inc 3.5 TCR
STATE-SIZE Hutchinson Technology Inc. - Hutchinson, MN 268 FTE
STATE-SIZE Logic PD Eden Prairie 268 FTE
STATE-SIZE Minnesota State Colleges and Universities - Lake Superior College Main Facility 268 FTE
STATE-SIZE Madonna Towers 268 FTE
CITY-NEAR 0591 - Target Northern Campus 5,092 FTE
CITY-NEAR AMRG 2,891 FTE
CITY-NEAR Retail Merchandising Services 1,399 FTE
CITY-NEAR Egan Company 962 FTE
NAT-TCR Supported Independence Srvc of or - 1049 Nancy 3.1 TCR
NAT-TCR Mansfield 3.1 TCR
NAT-TCR Midwest Refrigerated Cedar Rapids, LLC 3.1 TCR
NAT-TCR Baptist Hospital PT 3.1 TCR
NAT-SIZE Bonnell Aluminum, Inc. 268 FTE
NAT-SIZE 060-DC019 268 FTE
NAT-SIZE Aspen Earthworks, Inc 268 FTE
NAT-SIZE Hawaii 268 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2023, 2022. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.