Transmission of electric power · Massachusetts
Eversource - Plymouth Electric
Plymouth, MA · ~139 workers · 8 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 3.4
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Eversource - Plymouth Electric runs at 287% of its industry's injury rate - far more dangerous than the typical Transmission of electric power workplace, earning a grade F.
Eversource - Plymouth Electric: 3.4 TCR = 287% of Transmission of electric power BLS 1.2 · 8y Form 300A (see methodology below)
Eversource - Plymouth Electric safety composite
Eversource - Plymouth Electric scores strongest on fatalities (safer than 52% of same-industry peers) and weakest on total case rate (tcr) (safer than 26%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
35/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 3.44 per 100 workers
Safer than 26% of industry peers
- DART rate
- F 1.84 per 100 workers
Safer than 33% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−1.1
2016→2023
Eversource - Plymouth Electric injury rate improved
Eversource - Plymouth Electric's TCR fell 1.1 from 3.6 in 2016 to 2.5 in 2023. Peak filing year was 2021 at 5.5 TCR. In 2023, DART was 0.53× this establishment's average TCR (severity share of cases).
2016=3.6 · 2017=5.0 · 2018=4.2 · 2019=2.5 · 2020=2.1 · 2021=5.5 · 2022=2.1 · 2023=2.5
OSHA ITA Form 300A scorecard
Establishment book 221121 · Plymouth, MA ABOVE-IND · MID
Grade F · TCR 3.4 · 287% of ind
- DART 1.8 DART
- RANK #6/6
- PHOTO CA-Whittier S/C
- BOOK 8y book
- INJ 37 inj
- SIZE ~139 FTE
Nearest TCR peer: CA-Whittier S/C (0.0 TCR gap)
Read with this employer → · Industry book → · Massachusetts employers → · Look up another →
Eversource - Plymouth Electric in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Indiana Munici
Indiana Municipal Power Agency
3.5 TCR
- CA-Palm Spring
CA-Palm Springs S/C
3.5 TCR
- This site
Eversource - Plymouth Electric
3.4 TCR
- CA-Whittier S/
CA-Whittier S/C
3.4 TCR
- CA-Montebello
CA-Montebello S/C
3.4 TCR
What this shows Eversource - Plymouth Electric averages 3.4 TCR (287% of the Transmission of electric power BLS benchmark).
Eversource - Plymouth Electric TCR series: 2016=3.6 · 2017=5 · 2018=4.2 · 2019=2.5 · 2020=2.1 · 2021=5.5 · 2022=2.1 · 2023=2.5 · BLS 1.2
Where Eversource - Plymouth Electric falls in its industry
263 Transmission of electric power establishmentsSafer than 26% of graded establishments in this industry, whose median TCR is 2.2.
Narrower to Massachusetts alone (the establishments it most directly competes with for workers and contracts): ranked #6 safest of 6 Transmission of electric power employers in Massachusetts.
Eversource - Plymouth Electric has more employees than the Transmission of electric power median and a higher injury rate than the industry's median TCR of 2.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 2.5 | 1.8 | 4 | 0 | 0 |
| 2022 | 2.1 | 2.1 | 3 | 0 | 0 |
| 2021 | 5.5 | 3.5 | 8 | 0 | 0 |
| 2020 | 2.1 | 2.1 | 3 | 0 | 0 |
| 2019 | 2.5 | 2.5 | 4 | 0 | 0 |
| 2018 | 4.2 | 2.8 | 4 | 2 | 0 |
| 2017 | 5.0 | 2.9 | 6 | 1 | 0 |
| 2016 | 3.6 | 1.4 | 5 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221121 · MA · Plymouth
263 Transmission of electric power employers nationwide with a credible TCR · 10,108 rated employers in Massachusetts with headcount on file · 101 employers in Plymouth, MA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | CA-Whittier S/C | 3.4 TCR |
| NAICS-TCR | Indiana Municipal Power Agency | 3.5 TCR |
| NAICS-TCR | CA-Palm Springs S/C | 3.5 TCR |
| NAICS-TCR | CA-Montebello S/C | 3.4 TCR |
| STATE-SIZE | Current Lighting Solutions | 139 FTE |
| STATE-SIZE | Microline Surgical, Inc. | 139 FTE |
| STATE-SIZE | CRAFT MASSACHUSETTS | 139 FTE |
| STATE-SIZE | Colonial Wholesale Beverage Corporation | 139 FTE |
| CITY-NEAR | Beth Israel Deaconess Plymouth | 1,939 FTE |
| CITY-NEAR | BETH ISRAEL DEACONESS HOSPITAL-PLYMOUTH | 1,790 FTE |
| CITY-NEAR | Pilgrim Nuclear Power Station | 627 FTE |
| CITY-NEAR | Tech Etch Plymouth | 534 FTE |
| NAT-TCR | Bovina Feeders Inc. | 3.4 TCR |
| NAT-TCR | AdventHealth Care Center Celebration | 3.4 TCR |
| NAT-TCR | Norlake Manufacturing Company | 3.4 TCR |
| NAT-TCR | Emblem Hospice Tucson | 3.4 TCR |
| NAT-SIZE | The Laurels and the Haven in Highland Creek | 139 FTE |
| NAT-SIZE | Advanced Subacute Rehailiation Center | 139 FTE |
| NAT-SIZE | Lakeview Wi (Pleasant Prairie) | 139 FTE |
| NAT-SIZE | Commercial HVAC Americas : SVC-Southern Atlantic : SVC-CharlotteNC-USA | 139 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.