Electric power generation, nuclear · Massachusetts
Pilgrim Nuclear Power Station
Plymouth, MA · ~627 workers · 3 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.3
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Pilgrim Nuclear Power Station runs at 23% of its industry's injury rate - far safer than the typical Electric power generation, nuclear workplace, earning a grade A.
Pilgrim Nuclear Power Station: 0.3 TCR = 23% of Electric power generation, nuclear BLS 1.2 · 3y Form 300A (see methodology below)
Pilgrim Nuclear Power Station safety composite
Pilgrim Nuclear Power Station scores strongest on fatalities (safer than 50% of same-industry peers) and weakest on dart rate (safer than 18%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
33/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 0.28 per 100 workers
Safer than 35% of industry peers
- DART rate
- F 0.16 per 100 workers
Safer than 18% of industry peers
- Fatalities
- D 0
Safer than 50% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Pilgrim Nuclear Power Station held a steady TCR band
Pilgrim Nuclear Power Station's TCR held near 0.2 from 0.4 in 2016 to 0.2 in 2018. Peak filing year was 2016 at 0.4 TCR. In 2018, DART was 0.57× this establishment's average TCR (severity share of cases).
2016=0.4 · 2017=0.3 · 2018=0.2
OSHA ITA Form 300A scorecard
Establishment book 221113 · Plymouth, MA AT/BELOW-IND · MID
Grade A · TCR 0.3 · 23% of ind
- DART 0.2 DART
- RANK P35
- PHOTO Monticello Nuclear P…
- BOOK 3y book
- INJ 4 inj
- SIZE ~627 FTE
Nearest TCR peer: Monticello Nuclear Plant (0.0 TCR gap)
Read with this employer → · Industry book → · Massachusetts employers → · Look up another →
Pilgrim Nuclear Power Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site 0.3
Pilgrim Nuclear Power Station
0.3 TCR
- Monticello Nuc 0.3
Monticello Nuclear Plant
0.3 TCR
- PSL Plant St L 0.3
PSL Plant St Lucie
0.3 TCR
- Constellation 0.3
Constellation Nuclear Headquarters at Cantera
0.3 TCR
- Duane Arnold 0.3
Duane Arnold
0.3 TCR
What this shows Pilgrim Nuclear Power Station averages 0.3 TCR (23% of the Electric power generation, nuclear BLS benchmark).
Pilgrim Nuclear Power Station TCR series: 2016=0.4 · 2017=0.3 · 2018=0.2 · BLS 1.2
Where Pilgrim Nuclear Power Station falls in its industry
80 Electric power generation, nuc establishmentsSafer than 35% of graded establishments in this industry, whose median TCR is 0.2.
Pilgrim Nuclear Power Station has fewer employees than the Electric power generation, nuclear median and a higher injury rate than the industry's median TCR of 0.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2018 | 0.2 | 0.2 | 1 | 0 | 0 |
| 2017 | 0.3 | 0.1 | 1 | 1 | 0 |
| 2016 | 0.4 | 0.3 | 2 | 2 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221113 · MA · Plymouth
80 Electric power generation, nuclear employers nationwide with a credible TCR · 10,108 rated employers in Massachusetts with headcount on file · 101 employers in Plymouth, MA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Monticello Nuclear Plant | 0.3 TCR |
| NAICS-TCR | PSL Plant St Lucie | 0.3 TCR |
| NAICS-TCR | Constellation Nuclear Headquarters at Cantera | 0.3 TCR |
| NAICS-TCR | Duane Arnold | 0.3 TCR |
| STATE-SIZE | UTC Aerospace Systems | 627 FTE |
| STATE-SIZE | Columbia Electrical Contractors, Inc. | 625 FTE |
| STATE-SIZE | The Vertex Companies, LLC | 629 FTE |
| STATE-SIZE | Converse Headquarters | 629 FTE |
| CITY-NEAR | Beth Israel Deaconess Plymouth | 1,939 FTE |
| CITY-NEAR | BETH ISRAEL DEACONESS HOSPITAL-PLYMOUTH | 1,790 FTE |
| CITY-NEAR | Tech Etch Plymouth | 534 FTE |
| CITY-NEAR | SMARTPAK EQUINE | 392 FTE |
| NAT-TCR | Clarksburg | 0.3 TCR |
| NAT-TCR | Kentucky Health Physicians and Clinic | 0.3 TCR |
| NAT-TCR | Starcon @ MPC Catlettsburg | 0.3 TCR |
| NAT-TCR | SandRidge Operating - Corporate Office | 0.3 TCR |
| NAT-SIZE | Division of Equipment | 627 FTE |
| NAT-SIZE | Sandridge Food Corporation - Medina | 627 FTE |
| NAT-SIZE | WFBMC - Lexington Medical Center | 627 FTE |
| NAT-SIZE | Reed Contracting Services, Inc. | 627 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.